FHWA NBI 2024 Inspection record Public-domain dataset

US 95

Carrying US 95 over S CANAL

NORTH OF FALLON, Churchill, Nevada

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
28 t Inventory load rating Lower than 83% of rated Nevada bridges

US 95 in Churchill, Nevada sits above 17% of rated Nevada bridges on inventory load rating (28 t), while its 1987 build year is earlier than 36% of Churchill's recorded-year cohort (70 bridges).

US 95 in Churchill, Nevada is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1987, it carries 1 rated component on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure NV:B 676

LATE-CENTURY · CONCRETE · MULTI-SPAN · CULVERT-LED · ARTERIAL-ADT · STANDARD-LOAD · CAT-FAIR

  • LATE-CENTURY 1980–1999
  • CONCRETE Concrete
  • MULTI-SPAN 3 spans
  • CULVERT-LED Culvert-led
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: US 95

The US 95 bridge in Churchill, Nevada carries US 95 over S CANAL. It was built in 1987, making it 39 years old today. The structure is built primarily of concrete and spans 3 sections, stretching 17.8 meters (58 feet) end to end. Daily traffic averages 4,550 vehicles, placing it in the moderately-trafficked tier of Nevada bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show culvert at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How US 95 compares

▼ 19.2
Load rating vs Nevada average (47.2 t; 2,090 of 2,099 rated)
70
Bridges in Churchill

Age against the county: built in 1987, earlier than 25 of Churchill's 70 bridges with a recorded construction year (36%), against a county median build year of 1981. This is one of the newer structures in its county.

US 95 28.0 t
Nevada average (2,090 of 2,099 rated) 47.2 t

Live comparison across Nevada bridges with a recorded inventory load rating (2,090 of 2,099 rated).

US 95 vs every rated Nevada bridge

Inventory load rating (metric tons), FHWA NBI, this state

28 Top 83% higher than 17% of 2,090 bridges

rated Nevada bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Culvert
6/9
Fair (5–6)
Inventory Load Rating
28.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Churchill inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 70 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1987
Material
Concrete
Number of Spans
3
Structure Length
17.8 m (58 ft)
Deck Width
15.8 m (52 ft)
Owner
State Highway Agency
Avg Daily Traffic
4,550 vehicles/day
Structure Number
B 676

How to read this record

This page shows what the last federal inspection recorded, not whether US 95 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare US 95 against other structures in Churchill and across Nevada. Nevada bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for US 95?

US 95 in Churchill, Nevada on the FHWA's 0–9 scale.

How often is US 95 inspected?

US 95's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 4,550 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. US 95 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for US 95?

US 95 has an NBI inventory load rating of 28.0 metric tons.

Who is responsible for maintaining US 95?

US 95 is owned and maintained by State Highway Agency.

How old is US 95 and does age affect safety?

US 95 was built in 1987, making it 39 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.