FHWA NBI 2024 Inspection record Public-domain dataset

FAS 0501

Carrying FAS 0501 over CREEK

SHEBWOOLEY & 8TH., Beckham, Oklahoma

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
19 t Inventory load rating Lower than 90% of rated Oklahoma bridges

FAS 0501 in Beckham, Oklahoma sits above 10% of rated Oklahoma bridges on inventory load rating (19 t), while its 1932 build year is earlier than 93% of Beckham's recorded-year cohort (312 bridges).

FAS 0501 in Beckham, Oklahoma is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1932, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OK:034620000000000

PRE-1950 · CONCRETE · MULTI-SPAN · TIED-CTRL · LOCAL-ADT · LIGHT-LOAD · CAT-FAIR

  • PRE-1950 Pre-1950
  • CONCRETE Concrete
  • MULTI-SPAN 2 spans
  • TIED-CTRL Tied control
  • LOCAL-ADT Local ADT
  • LIGHT-LOAD Light load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Structural health score

A composite of the deck, superstructure, and substructure NBI condition ratings plus the inventory load rating, benchmarked against the full national bridge corpus, distinct from the Good/Fair/Poor category above.

F
Overall Score
21/100
FAS 0501
Deck Condition F
6/9
NBI deck condition rating (0=failed, 9=excellent)
Superstructure Condition F
6/9
NBI superstructure condition rating (0=failed, 9=excellent)
Substructure Condition F
6/9
NBI substructure condition rating (0=failed, 9=excellent)
Load Rating F
19 t
NBI inventory load rating vs the national corpus

Bridge Snapshot: FAS 0501

The FAS 0501 bridge in Beckham, Oklahoma carries FAS 0501 over CREEK. It was built in 1932, making it 94 years old today. The structure is built primarily of concrete continuous and spans 2 sections, stretching 7.0 meters (23 feet) end to end. Daily traffic averages 200 vehicles, placing it in the lower-traffic tier of Oklahoma bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection places the weakest component in fair condition (see the full component ratings below). None of this bridge's reported major components fall into the Poor condition range.

How FAS 0501 compares

▼ 12.9
Load rating vs Oklahoma average (32.0 t; 22,909 of 22,917 rated)
312
Bridges in Beckham · 1 in Poor condition

Age against the county: built in 1932, earlier than 291 of Beckham's 312 bridges with a recorded construction year (93%), against a county median build year of 1970. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

FAS 0501 19.1 t
Oklahoma average (22,909 of 22,917 rated) 32.0 t

Live comparison across Oklahoma bridges with a recorded inventory load rating (22,909 of 22,917 rated).

FAS 0501 vs every rated Oklahoma bridge

Inventory load rating (metric tons), FHWA NBI, this state

19 Top 90% higher than 10% of 22,909 bridges

rated Oklahoma bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
19.1 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Beckham inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 312 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1932
Material
Concrete Continuous
Number of Spans
2
Structure Length
7.0 m (23 ft)
Deck Width
9.8 m (32 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
200 vehicles/day
Structure Number
034620000000000

Condition Analysis

  • • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether FAS 0501 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FAS 0501 against other structures in Beckham and across Oklahoma. Oklahoma bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FAS 0501?

FAS 0501 in Beckham, Oklahoma has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is FAS 0501 inspected?

FAS 0501's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 200 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FAS 0501 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FAS 0501?

FAS 0501 has an NBI inventory load rating of 19.1 metric tons.

Who is responsible for maintaining FAS 0501?

FAS 0501 is owned and maintained by City/Municipal Highway Agency.

How old is FAS 0501 and does age affect safety?

FAS 0501 was built in 1932, making it 94 years old.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.