FHWA NBI 2024 Inspection record Public-domain dataset

HWY 69

Carrying HWY 69 over UPRR & NW EXPRESSWAY

00.5 N JCT HWY 01W, Lane, Oregon

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
16 t Inventory load rating Lower than 89% of rated Oregon bridges

HWY 69 in Lane, Oregon sits above 11% of rated Oregon bridges on inventory load rating (16 t), while its 1963 build year is earlier than 70% of Lane's recorded-year cohort (1,010 bridges).

HWY 69 in Lane, Oregon is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1963, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OR:08864A069 00706

INTERSTATE-ERA · STEEL · MULTI-SPAN · TIED-CTRL · HEAVY-ADT · LIGHT-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • STEEL Steel
  • MULTI-SPAN 3 spans
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • LIGHT-LOAD Light load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: HWY 69

The HWY 69 bridge in Lane, Oregon carries HWY 69 over UPRR & NW EXPRESSWAY. It was built in 1963, making it 63 years old today. It was last reconstructed in 1971, extending its service life. The structure is built primarily of steel continuous and spans 3 sections, stretching 166.7 meters (547 feet) end to end. Daily traffic averages 53,100 vehicles, placing it in the heavily-trafficked tier of Oregon bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range.

How HWY 69 compares

▼ 15.6
Load rating vs Oregon average (31.8 t; 8,282 of 8,305 rated)
1,010
Bridges in Lane · 15 in Poor condition

Age against the county: built in 1963, earlier than 708 of Lane's 1,010 bridges with a recorded construction year (70%), against a county median build year of 1975. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

HWY 69 16.2 t
Oregon average (8,282 of 8,305 rated) 31.8 t

Live comparison across Oregon bridges with a recorded inventory load rating (8,282 of 8,305 rated).

HWY 69 vs every rated Oregon bridge

Inventory load rating (metric tons), FHWA NBI, this state

16 Top 89% higher than 11% of 8,282 bridges

rated Oregon bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
16.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Lane inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 1,010 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1963
Last Reconstructed
1971
Material
Steel Continuous
Number of Spans
3
Structure Length
166.7 m (547 ft)
Deck Width
31.2 m (102 ft)
Owner
State Highway Agency
Avg Daily Traffic
53,100 vehicles/day
Structure Number
08864A069 00706

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether HWY 69 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare HWY 69 against other structures in Lane and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HWY 69?

HWY 69 in Lane, Oregon has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is HWY 69 inspected?

HWY 69's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 53,100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HWY 69 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HWY 69?

HWY 69 has an NBI inventory load rating of 16.2 metric tons.

Who is responsible for maintaining HWY 69?

HWY 69 is owned and maintained by State Highway Agency.

How old is HWY 69 and does age affect safety?

HWY 69 was built in 1963, making it 63 years old and last reconstructed in 1971.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.