FHWA NBI 2024 Inspection record Public-domain dataset

HWY 228 NB

Carrying HWY 228 NB over FLOODWAY DITCH

IN SPRINGFIELD, Lane, Oregon

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
31 t Inventory load rating Higher than 53% of rated Oregon bridges

HWY 228 NB in Lane, Oregon sits above 53% of rated Oregon bridges on inventory load rating (31 t), while its 1964 build year is earlier than 68% of Lane's recorded-year cohort (1,010 bridges).

HWY 228 NB in Lane, Oregon is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1964, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OR:09193A228 00037

INTERSTATE-ERA · CONCRETE · MULTI-SPAN · TIED-CTRL · ARTERIAL-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • CONCRETE Concrete
  • MULTI-SPAN 3 spans
  • TIED-CTRL Tied control
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: HWY 228 NB

The HWY 228 NB bridge in Lane, Oregon carries HWY 228 NB over FLOODWAY DITCH. It was built in 1964, making it 62 years old today. It was last reconstructed in 2010, extending its service life. The structure is built primarily of concrete continuous and spans 3 sections, stretching 30.0 meters (98 feet) end to end. Daily traffic averages 6,188 vehicles, placing it in the moderately-trafficked tier of Oregon bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How HWY 228 NB compares

▼ 1.3
Load rating vs Oregon average (31.8 t; 8,282 of 8,305 rated)
1,010
Bridges in Lane · 15 in Poor condition

Age against the county: built in 1964, earlier than 689 of Lane's 1,010 bridges with a recorded construction year (68%), against a county median build year of 1975. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

HWY 228 NB 30.5 t
Oregon average (8,282 of 8,305 rated) 31.8 t

Live comparison across Oregon bridges with a recorded inventory load rating (8,282 of 8,305 rated).

HWY 228 NB vs every rated Oregon bridge

Inventory load rating (metric tons), FHWA NBI, this state

31 Top 47% higher than 53% of 8,282 bridges

rated Oregon bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
30.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Lane inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 1,010 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1964
Last Reconstructed
2010
Material
Concrete Continuous
Number of Spans
3
Structure Length
30.0 m (98 ft)
Deck Width
17.4 m (57 ft)
Owner
State Highway Agency
Avg Daily Traffic
6,188 vehicles/day
Structure Number
09193A228 00037

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether HWY 228 NB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare HWY 228 NB against other structures in Lane and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HWY 228 NB?

HWY 228 NB in Lane, Oregon has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is HWY 228 NB inspected?

HWY 228 NB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 6,188 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HWY 228 NB is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HWY 228 NB?

HWY 228 NB has an NBI inventory load rating of 30.5 metric tons.

Who is responsible for maintaining HWY 228 NB?

HWY 228 NB is owned and maintained by State Highway Agency.

How old is HWY 228 NB and does age affect safety?

HWY 228 NB was built in 1964, making it 62 years old and last reconstructed in 2010.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.