FHWA NBI 2024 Inspection record Public-domain dataset

N91

Carrying N91 over STREAM

1W SPALDING, Greeley, Nebraska

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
32 t Inventory load rating

Bridge Snapshot: N91

The N91 bridge in Greeley, Nebraska carries N91 over STREAM. It was built in 1961, making it 65 years old today. It was last reconstructed in 1990, extending its service life. The structure is built primarily of concrete continuous and spans 3 sections, stretching 25.0 meters (82 feet) end to end. Daily traffic averages 1,125 vehicles, placing it in the moderately-trafficked tier of Nebraska bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 32.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How N91 compares

▲ 4.3
Load rating vs Nebraska average (27.7 t)
Top 41%
Higher load rating than 59% of Nebraska bridges
84
Bridges in Greeley · 14 in Poor condition
N91 32.0 t
Nebraska average 27.7 t

Live comparison across Nebraska.

Historical Sufficiency Rating

PlainBridge-computed
98.3 / 100 - historical 80–100 band
Structural adequacy /55
54.9
Serviceability /30
30.0
Essentiality /15
13.4
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1961
Last Reconstructed
1990
Material
Concrete Continuous
Number of Spans
3
Structure Length
25.0 m (82 ft)
Deck Width
11.9 m (39 ft)
Owner
State Highway Agency
Avg Daily Traffic
1,125 vehicles/day
Structure Number
S091 10498

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether N91 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare N91 against other structures in Greeley and across Nebraska. Nebraska bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for N91?

N91 in Greeley, Nebraska has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is N91 inspected?

N91's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,125 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. N91 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for N91?

N91 has an NBI inventory load rating of 32.0 metric tons.

Who is responsible for maintaining N91?

N91 is owned and maintained by State Highway Agency.

How old is N91 and does age affect safety?

N91 was built in 1961, making it 65 years old and last reconstructed in 1990.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.