FHWA NBI 2024 Inspection record Public-domain dataset

HWY. 570 NORTH EXT

Carrying HWY. 570 NORTH EXT over WEST TOPISAW CREEK

SEC 17 T 4N R 9E B, Pike, Mississippi

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
21 t Inventory load rating

Bridge Snapshot: HWY. 570 NORTH EXT

The HWY. 570 NORTH EXT bridge in Pike, Mississippi carries HWY. 570 NORTH EXT over WEST TOPISAW CREEK. It was built in 1972, making it 54 years old today. The structure is built primarily of prestressed concrete and spans 7 sections, stretching 85.3 meters (280 feet) end to end. Daily traffic averages 850 vehicles, placing it in the lower-traffic tier of Mississippi bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 5/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 21.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How HWY. 570 NORTH EXT compares

▼ 13.0
Load rating vs Mississippi average (34.4 t)
Bottom 12%
Lower load rating than 88% of Mississippi bridges
211
Bridges in Pike · 12 in Poor condition
HWY. 570 NORTH EXT 21.4 t
Mississippi average 34.4 t

Live comparison across Mississippi.

Historical Sufficiency Rating

PlainBridge-computed
62.9 / 100 - historical 50–79.9 band
Structural adequacy /55
33.1
Serviceability /30
15.1
Essentiality /15
14.6
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
21.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1972
Material
Prestressed Concrete
Number of Spans
7
Structure Length
85.3 m (280 ft)
Deck Width
8.8 m (29 ft)
Owner
County Highway Agency
Avg Daily Traffic
850 vehicles/day
Structure Number
SA5700000000176

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether HWY. 570 NORTH EXT is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare HWY. 570 NORTH EXT against other structures in Pike and across Mississippi. Mississippi bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HWY. 570 NORTH EXT?

HWY. 570 NORTH EXT in Pike, Mississippi has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is HWY. 570 NORTH EXT inspected?

HWY. 570 NORTH EXT's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 850 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HWY. 570 NORTH EXT is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HWY. 570 NORTH EXT?

HWY. 570 NORTH EXT has an NBI inventory load rating of 21.4 metric tons.

Who is responsible for maintaining HWY. 570 NORTH EXT?

HWY. 570 NORTH EXT is owned and maintained by County Highway Agency.

How old is HWY. 570 NORTH EXT and does age affect safety?

HWY. 570 NORTH EXT was built in 1972, making it 54 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.