FHWA NBI 2024 Inspection record Public-domain dataset

TWO CREEKS DRIVE

Carrying TWO CREEKS DRIVE over SKI RUN

JUST W OF SERVICE BERRY L, Pitkin, Colorado

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
47 t Inventory load rating

Bridge Snapshot: TWO CREEKS DRIVE

The TWO CREEKS DRIVE bridge in Pitkin, Colorado carries TWO CREEKS DRIVE over SKI RUN. It was built in 1997, making it 29 years old today. The structure is built primarily of steel and spans 1 section, stretching 29.3 meters (96 feet) end to end. Daily traffic averages 251 vehicles, placing it in the lower-traffic tier of Colorado bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 47.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How TWO CREEKS DRIVE compares

▲ 9.9
Load rating vs Colorado average (37.1 t)
Top 16%
Higher load rating than 84% of Colorado bridges
62
Bridges in Pitkin · 2 in Poor condition
TWO CREEKS DRIVE 47.0 t
Colorado average 37.1 t

Live comparison across Colorado.

Historical Sufficiency Rating

PlainBridge-computed
91.1 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
13.1
Special reductions
−7.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
47.0 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1997
Material
Steel
Number of Spans
1
Structure Length
29.3 m (96 ft)
Deck Width
10.0 m (33 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
251 vehicles/day
Structure Number
SNO 13

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether TWO CREEKS DRIVE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare TWO CREEKS DRIVE against other structures in Pitkin and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for TWO CREEKS DRIVE?

TWO CREEKS DRIVE in Pitkin, Colorado has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is TWO CREEKS DRIVE inspected?

TWO CREEKS DRIVE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 251 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. TWO CREEKS DRIVE is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for TWO CREEKS DRIVE?

TWO CREEKS DRIVE has an NBI inventory load rating of 47.0 metric tons.

Who is responsible for maintaining TWO CREEKS DRIVE?

TWO CREEKS DRIVE is owned and maintained by Town/Township Highway Agency.

How old is TWO CREEKS DRIVE and does age affect safety?

TWO CREEKS DRIVE was built in 1997, making it 29 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.