FHWA NBI 2024 Inspection record Public-domain dataset

FAP 115

Carrying FAP 115 over NINE MILE CREEK

IN WELLSVILLE, Blount, Tennessee

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
26 t Inventory load rating Lower than 75% of rated Tennessee bridges

FAP 115 in Blount, Tennessee sits above 25% of rated Tennessee bridges on inventory load rating (26 t), while its 1938 build year is earlier than 91% of Blount's recorded-year cohort (215 bridges).

FAP 115 in Blount, Tennessee is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1938, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 5. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure TN:05SR1150003

PRE-1950 · STEEL · LONG-SPAN-RUN · TIED-CTRL · ARTERIAL-ADT · STANDARD-LOAD · CAT-FAIR

  • PRE-1950 Pre-1950
  • STEEL Steel
  • LONG-SPAN-RUN 7 spans
  • TIED-CTRL Tied control
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: FAP 115

The FAP 115 bridge in Blount, Tennessee carries FAP 115 over NINE MILE CREEK. It was built in 1938, making it 88 years old today. It was last reconstructed in 1988, extending its service life. The structure is built primarily of steel and spans 7 sections, stretching 49.3 meters (162 feet) end to end. Daily traffic averages 1,320 vehicles, placing it in the moderately-trafficked tier of Tennessee bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 5/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How FAP 115 compares

▼ 3.6
Load rating vs Tennessee average (29.5 t; 20,355 of 20,379 rated)
215
Bridges in Blount · 6 in Poor condition

Age against the county: built in 1938, earlier than 195 of Blount's 215 bridges with a recorded construction year (91%), against a county median build year of 1982. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

FAP 115 25.9 t
Tennessee average (20,355 of 20,379 rated) 29.5 t

Live comparison across Tennessee bridges with a recorded inventory load rating (20,355 of 20,379 rated).

FAP 115 vs every rated Tennessee bridge

Inventory load rating (metric tons), FHWA NBI, this state

26 Top 75% higher than 25% of 20,355 bridges

rated Tennessee bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
25.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Blount inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 215 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1938
Last Reconstructed
1988
Material
Steel
Number of Spans
7
Structure Length
49.3 m (162 ft)
Deck Width
7.6 m (25 ft)
Owner
State Highway Agency
Avg Daily Traffic
1,320 vehicles/day
Structure Number
05SR1150003

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether FAP 115 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FAP 115 against other structures in Blount and across Tennessee. Tennessee bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FAP 115?

FAP 115 in Blount, Tennessee has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is FAP 115 inspected?

FAP 115's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,320 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FAP 115 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FAP 115?

FAP 115 has an NBI inventory load rating of 25.9 metric tons.

Who is responsible for maintaining FAP 115?

FAP 115 is owned and maintained by State Highway Agency.

How old is FAP 115 and does age affect safety?

FAP 115 was built in 1938, making it 88 years old and last reconstructed in 1988.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.