FHWA NBI 2024 Inspection record Public-domain dataset

FAP 29

Carrying FAP 29 over OVERFLOW PINEY RIVER

IN SPRING CITY CITY LIMIT, Rhea, Tennessee

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
26 t Inventory load rating Lower than 74% of rated Tennessee bridges

FAP 29 in Rhea, Tennessee sits above 26% of rated Tennessee bridges on inventory load rating (26 t), while its 2008 build year is earlier than 6% of Rhea's recorded-year cohort (100 bridges).

FAP 29 in Rhea, Tennessee is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 2008, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure TN:72SR0290013

POST-2000 · PRESTRESS · MULTI-SPAN · SUPER-LED · ARTERIAL-ADT · STANDARD-LOAD · CAT-POOR

  • POST-2000 2000+
  • PRESTRESS Prestressed concrete
  • MULTI-SPAN 3 spans
  • SUPER-LED Superstructure-led
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: FAP 29

The FAP 29 bridge in Rhea, Tennessee carries FAP 29 over OVERFLOW PINEY RIVER. It was built in 2008, making it 18 years old today. The structure is built primarily of prestressed concrete continuous and spans 3 sections, stretching 40.4 meters (133 feet) end to end. Daily traffic averages 5,821 vehicles, placing it in the moderately-trafficked tier of Tennessee bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 4/9, substructure at 6/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed.

How FAP 29 compares

▼ 3.3
Load rating vs Tennessee average (29.5 t; 20,355 of 20,379 rated)
100
Bridges in Rhea · 7 in Poor condition

Age against the county: built in 2008, earlier than 6 of Rhea's 100 bridges with a recorded construction year (6%), against a county median build year of 1984. This is one of the newer structures in its county.

FAP 29 26.2 t
Tennessee average (20,355 of 20,379 rated) 29.5 t

Live comparison across Tennessee bridges with a recorded inventory load rating (20,355 of 20,379 rated).

FAP 29 vs every rated Tennessee bridge

Inventory load rating (metric tons), FHWA NBI, this state

26 Top 74% higher than 26% of 20,355 bridges

rated Tennessee bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
4/9
Poor (1–4)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
26.2 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Rhea inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 100 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2008
Material
Prestressed Concrete Continuous
Number of Spans
3
Structure Length
40.4 m (133 ft)
Deck Width
22.9 m (75 ft)
Owner
State Highway Agency
Avg Daily Traffic
5,821 vehicles/day
Structure Number
72SR0290013

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear on file for this vintage.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

FAP 29 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare FAP 29 against other structures in Rhea and across Tennessee. Tennessee bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FAP 29?

FAP 29 in Rhea, Tennessee has a deck rating of 7/9, superstructure rating of 4/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is FAP 29 inspected?

FAP 29's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,821 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FAP 29 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FAP 29?

FAP 29 has an NBI inventory load rating of 26.2 metric tons.

Who is responsible for maintaining FAP 29?

FAP 29 is owned and maintained by State Highway Agency.

How old is FAP 29 and does age affect safety?

FAP 29 was built in 2008, making it 18 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.