FAU 3
Carrying FAU 3 over BRANCH
2.1 M N OF SR175, Shelby, Tennessee
Inventory: FHWA NBI 2024 · last ETL August 2026
FHWA NBI record, refreshed with each annual release.
FAU 3 in Shelby, Tennessee sits above 14% of rated Tennessee bridges on inventory load rating (24 t), while its 1934 build year is earlier than 95% of Shelby's recorded-year cohort (1,077 bridges).
FAU 3 in Shelby, Tennessee is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1934, it carries 1 rated component on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.
NBI record plate
Structure TN:79SR0030003
PRE-1950 · CONCRETE · MULTI-SPAN · CULVERT-LED · HEAVY-ADT · STANDARD-LOAD · CAT-FAIR
- PRE-1950 Pre-1950
- CONCRETE Concrete
- MULTI-SPAN 2 spans
- CULVERT-LED Culvert-led
- HEAVY-ADT Heavy ADT
- STANDARD-LOAD Standard load
- CAT-FAIR Fair
Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.
Bridge Snapshot: FAU 3
The FAU 3 bridge in Shelby, Tennessee carries FAU 3 over BRANCH. It was built in 1934, making it 92 years old today. It was last reconstructed in 1950, extending its service life. The structure is built primarily of concrete continuous and spans 2 sections, stretching 6.4 meters (21 feet) end to end. Daily traffic averages 53,694 vehicles, placing it in the heavily-trafficked tier of Tennessee bridges. It is owned and maintained by State Highway Agency.
The latest FHWA inspection records show culvert at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range.
How FAU 3 compares
Age against the county: built in 1934, earlier than 1,023 of Shelby's 1,077 bridges with a recorded construction year (95%), against a county median build year of 1974. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.
Live comparison across Tennessee bridges with a recorded inventory load rating (20,355 of 20,379 rated).
FAU 3 vs every rated Tennessee bridge
Inventory load rating (metric tons), FHWA NBI, this state
24 Top 86% higher than 14% of 20,355 bridges
rated Tennessee bridges, bucketed by value
Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.
Source FHWA National Bridge Inventory · August 2026
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Shelby inventory by recorded NBI category
Exclusive Good/Fair/Poor bands across all 1,077 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.
Structural Details
- Year Built
- 1934
- Last Reconstructed
- 1950
- Material
- Concrete Continuous
- Number of Spans
- 2
- Structure Length
- 6.4 m (21 ft) 0
- Owner
- State Highway Agency
- Avg Daily Traffic
- 53,694 vehicles/day
- Structure Number
- 79SR0030003
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
This page shows what the last federal inspection recorded, not whether FAU 3 is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare FAU 3 against other structures in Shelby and across Tennessee. Tennessee bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for FAU 3?
FAU 3 in Shelby, Tennessee on the FHWA's 0–9 scale.
How often is FAU 3 inspected?
FAU 3's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 53,694 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. FAU 3 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for FAU 3?
FAU 3 has an NBI inventory load rating of 24.3 metric tons.
Who is responsible for maintaining FAU 3?
FAU 3 is owned and maintained by State Highway Agency.
How old is FAU 3 and does age affect safety?
FAU 3 was built in 1934, making it 92 years old and last reconstructed in 1950.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Share this inspection record
Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.
Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.