Marshall County, IL

153 public highway bridges

Marshall County Bridge Snapshot

Marshall County, Illinois contains 153 public highway bridges in the FHWA National Bridge Inventory. Roughly 43.1% are rated “Good,” 39.2% “Fair,” 11.1% “Poor,” and 11.1% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in IL are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

153
Total Bridges
43.1%
Good
11.1%
Poor
11.1%
Structurally Deficient

Condition Distribution

Good
43.1% (66)
Fair
39.2% (60)
Poor
11.1% (17)
SD
11.1% (17)

All Bridges (153)

ATCH TOP & SAN FE

Unknown

Over: IL 251

1.04 MI S OF ILL 17, Marshall, IL

Built 1963 ADT: 1,200

ILL 18

Unknown

Over: ILL RIVER, CROMWELL DR

1.22 MI E OF ILL 29, Marshall, IL

Built 1934 ADT: 125

I-39/US 51(SB)

Unknown

Over: TR 39 (FRTG RD WEST)

3.36 MI S OF ILL 18, Marshall, IL

Built 1991 ADT: 50

I-39/US 51(NB)

Unknown

Over: TR 39 (FRTG RD WEST)

3.37 MI S OF ILL 18, Marshall, IL

Built 1991 ADT: 50

CH 14

Unknown

Over: I-39/US 51

2.19 MI N OF ILL 17, Marshall, IL

Built 1990 ADT: 16,500

TR 69C

Unknown

Over: I-39/US 51

1 MI N OF ILL 17, Marshall, IL

Built 1991 ADT: 16,500

IL 17/FAP 649

Unknown

Over: I-39/US 51

.45 MI W OF IL 251, Marshall, IL

Built 1989 ADT: 16,500

CH 4 (500 N)

Unknown

Over: I-39/US 51

2.02 MI S 0F ILL 17, Marshall, IL

Built 1989 ADT: 16,000

FAS 369 (400 N)

Unknown

Over: I-39/US 51

3 MI S OF IL 17, Marshall, IL

Built 1990 ADT: 16,000

TR 121A (200 N)

Unknown

Over: I-39/US 51

5 MI S OF IL 17, Marshall, IL

Built 1990 ADT: 16,000

TR 22 (TH-R65)

Fair

Over: CROW CREEK

T13N-R8E-4PM SEC 1, Marshall, IL

Built 1974 Load: 20.4 t ADT: 25

TR 112 (TH-S44)

Fair

Over: S BRANCH CROW CREEK

T29N-R1W-3PM SEC 22, Marshall, IL

Built 1968 Load: 23.7 t ADT: 25

TR 3 (TH-C52)

Fair

Over: CREEK

T13N R8E 4PM SEC 3, Marshall, IL

Built 1936 Load: 24.3 t ADT: 50

FAS 371 (CH S-32)

Fair

Over: PIGEON CREEK

T29N-R2W-3PM SEC 14, Marshall, IL

Built 1983 Load: 24.3 t ADT: 450

TR 8 (TH-R56)

Fair

Over: CROW CREEK

T13N-R8E-4PM SEC 4, Marshall, IL

Built 1972 Load: 24.3 t ADT: 10

TR 48 (TH-S18)

Fair

Over: CREEK

T13N-R9E-4PM SEC 26, Marshall, IL

Built 1975 Load: 24.3 t ADT: 25

TR 69A (TH-C65)

Fair

Over: JUDD CREEK

T30N-R1E-3PM SEC 29, Marshall, IL

Built 1977 Load: 24.3 t ADT: 75

TR 102A (TH-S40)

Fair

Over: CREEK

T29N-R1W-3PM SEC 8, Marshall, IL

Built 1974 Load: 24.3 t ADT: 25

TR 126 (TH-S48)

Fair

Over: CREEK

T29N-R1W-3PM SEC 23, Marshall, IL

Built 1977 Load: 24.3 t ADT: 50

TR 75 (TH-C69)

Fair

Over: STRAWN CREEK

T29N-R2W-3PM SEC 4, Marshall, IL

Built 1969 Load: 24.3 t ADT: 25

TR 85 (TH-C69)

Fair

Over: CREEK

T12N-R8E-4PM SEC 26, Marshall, IL

Built 1970 Load: 25.3 t ADT: 50

TR 12 (TH-R63)

Fair

Over: DEER CREEK

T12N-R8E-4PM SEC 34, Marshall, IL

Built 1975 Load: 25.3 t ADT: 25

TR 69A (TH-C65)

Fair

Over: SHAW CREEK

T30N-R1W-3PM SEC 30, Marshall, IL

Built 1966 Load: 26.2 t ADT: 250

TR 126 (TH-S48)

Fair

Over: S BRANCH CROW CREEK

T29N-R1W-3PM SEC 35, Marshall, IL

Built 1970 Load: 28.8 t ADT: 50

TR 149 (TH-D18)

Fair

Over: S BRANCH CROW CR

T29N-R1E-3PM SEC 33, Marshall, IL

Built 1969 Load: 29.5 t ADT: 50

TR 140C (TH-S55)

Fair

Over: S BRANCH CROW CREEK

T29N RIE 3PM SEC 32, Marshall, IL

Built 1973 Load: 29.5 t ADT: 100

TR 20 (TH-R65)

Fair

Over: SENACHWINE CREEK

T13N-R8E-4PM SEC 25, Marshall, IL

Built 1954 Load: 29.8 t ADT: 25

TR 130B (TH-S51)

Fair

Over: S BRANCH CROW CREEK

T29N-R1E-3PM SEC 31, Marshall, IL

Built 1976 Load: 30.5 t ADT: 50

TR 13 (TH-C55)

Fair

Over: BRANCH CROW CREEK

T13N-R9E-4PM SEC 12, Marshall, IL

Built 1971 Load: 30.8 t ADT: 100

TR 98

Fair

Over: SHAW CREEK

T30N-R1W-3PM SEC29, Marshall, IL

Built 1996 Load: 30.8 t ADT: 25

TR 144 (TH-S57)

Fair

Over: SANDY CREEK

T30N-R1E-3PM SEC 10, Marshall, IL

Built 1967 Load: 31.1 t ADT: 150

TR 77 (TH-C68)

Fair

Over: CREEK

STEUBEN SEC. 19, Marshall, IL

Built 1998 Load: 32.4 t ADT: 50

TR 86 (TH-S34)

Fair

Over: SANDY CREEK

T30N-R2W-3PM SEC 2, Marshall, IL

Built 1977 Load: 32.4 t ADT: 50

TR 33 (TH-C60)

Fair

Over: CREEK

T30N-R2W-3PM SEC 3, Marshall, IL

Built 1986 Load: 32.4 t ADT: 75

TR 96 (TH-S38)

Fair

Over: SANDY CREEK

T30N-R1W-3PM SEC 6, Marshall, IL

Built 1979 Load: 32.4 t ADT: 25

TR 150 (TH-S60)

Fair

Over: SANDY CREEK

T30N-RIE-3PM SEC 10, Marshall, IL

Built 1979 Load: 32.4 t ADT: 25

TR 37 (TH-C60)

Fair

Over: JUDD CREEK

T30N-R1E-3PM SEC 7, Marshall, IL

Built 1980 Load: 32.4 t ADT: 75

TR 146 (TH-S 59)

Fair

Over: SANDY CREEK

T30N-RIE-3PM SEC 10, Marshall, IL

Built 1984 Load: 32.4 t ADT: 25

TR 147 (TH-D17)

Fair

Over: HALLENBACK CREEK

T29N-R1W-3PM SEC 35, Marshall, IL

Built 1978 Load: 32.4 t ADT: 25

TR 68 (TH-S 27)

Fair

Over: CROW CREEK

T29N-R2W-3PM SEC 29, Marshall, IL

Built 1983 Load: 32.4 t ADT: 50

TR 68 (TH-S27)

Fair

Over: ATSF RR

T29N-R2W-3PM SEC 29, Marshall, IL

Built 1986 Load: 32.4 t ADT: 50

TR 42 (TH-S17)

Fair

Over: THENIUS CREEK

T12N-R9E-4PM SEC 2, Marshall, IL

Built 1978 Load: 32.4 t ADT: 25

TR 42 (TH-S17)

Fair

Over: THENIUS CREEK

T12N-R9E-4PM SEC 2, Marshall, IL

Built 1980 Load: 32.4 t ADT: 25

TR 24 (TH-R66)

Fair

Over: CREEK

T12N-R8E-4PM SEC 13, Marshall, IL

Built 1980 Load: 32.4 t ADT: 50

THENIUS ROAD

Fair

Over: THENIUS CR

VILLAGE OF SPARLAND, Marshall, IL

Built 1987 Load: 32.4 t ADT: 150

CH 13 (CH-R60)

Fair

Over: CROW CREEK

T13N-R8E-4PM SEC 10, Marshall, IL

Built 1971 Load: 33.0 t ADT: 325

FAS 369 (TH-D12)

Fair

Over: CREEK

T29N-RIE-3PM SEC 16, Marshall, IL

Built 1920 Load: 33.4 t ADT: 125

ILL 18

Fair

Over: SANDY CR

0.1 W OF ILL 26, Marshall, IL

Built 1975 Load: 34.0 t ADT: 2,200

ILL 89

Fair

Over: SANDY CREEK

1.87 MI S OF ILL 18, Marshall, IL

Built 1928 Load: 35.3 t ADT: 2,200

ILL. 26

Fair

Over: SNAG CREEK OVERFLOW

.25 MI N COUNTY LINE, Marshall, IL

Built 1991 Load: 35.3 t ADT: 2,350

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial