Itasca County, MN

76 public highway bridges

Itasca County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Itasca County, Minnesota contains 76 public highway bridges. Roughly 50% are rated “Good,” 42.1% “Fair,” and 3.9% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

76
Total Bridges
50%
Good
42.1%
Fair
3.9%
Poor Condition

Condition Distribution

Good
50% (38)
Fair
42.1% (32)
Poor
3.9% (3)

All Bridges (76)

MN 46

Good

Over: POPPLE RIVER

5.9 MI NW OF SQUAW LAKE, Itasca, MN

Built 2016 Load: 32.4 t ADT: 820

CSAH 12

Good

Over: HAY CREEK

3.8 MI NE OF JCT TH 65, Itasca, MN

Built 1982 Load: 32.4 t ADT: 136

CSAH 52

Good

Over: W FK PRAIRIE RIVER

1.0 MI N OF JCT CSAH 7, Itasca, MN

Built 1983 Load: 32.4 t ADT: 540

2198

Good

Over: DRY CREEK

2.1 MILES WEST OF TH46, Itasca, MN

Built 2010 Load: 34.7 t ADT: 45

FR2198 - CSAH 33

Good

Over: SIMPSON CREEK

1.1 MI W OF JCT TH 46, Itasca, MN

Built 1947 Load: 35.0 t ADT: 285

T 4

Good

Over: SPLIT HAND CREEK

0.1 MI W OF JCT CSAH 3, Itasca, MN

Built 2003 Load: 35.9 t ADT: 101

T 4380

Good

Over: THIRD RIVER

2.5 MI E OF W CO LINE, Itasca, MN

Built 1983 Load: 36.6 t ADT: 5

MN 65

Good

Over: SWAN RIVER

3.6 MI N OF N JCT TH 200, Itasca, MN

Built 2009 Load: 36.9 t ADT: 870

CSAH 54

Good

Over: STREAM

0.7 MI E OF JCT TH 65, Itasca, MN

Built 1992 Load: 36.9 t ADT: 306

T 4215

Good

Over: PELQUIN CREEK

0.15 MI E OF JCT CR 236, Itasca, MN

Built 2020 Load: 37.6 t ADT: 5

MN 65

Good

Over: EAST FORK PRAIRIE R(S BR

9.5 MI N OF JCT TH 169, Itasca, MN

Built 1993 Load: 39.2 t ADT: 790

CR 141

Good

Over: MOOSE CREEK

0.7 MI W OF JCT CSAH 33, Itasca, MN

Built 2010 Load: 40.8 t ADT: 90

SFR 150

Good

Over: BEAR RIVER

0.1 MI SW OF CR 552, Itasca, MN

Built 2010 Load: 40.8 t ADT: 14

US 169

Good

Over: TRAIL

0.6 MI SW OF N JCT TH 65, Itasca, MN

Built 1976 Load: 41.8 t ADT: 2,652

CSAH 12

Good

Over: O'BRIEN CREEK

2.3 MI SE OF JCT TH 65, Itasca, MN

Built 1994 Load: 43.7 t ADT: 328

SFR 135

Good

Over: VALLEY RIVER

0.1 MI W OF CR 541, Itasca, MN

Built 2011 Load: 44.9 t ADT: 20

FR2171

Good

Over: THIRD RIVER

12.1 MI W OF JCT TH 46, Itasca, MN

Built 1986 Load: 45.4 t ADT: 25

UT 1037

Good

Over: SAND CREEK

0.9 MI E OF JCT CSAH 10, Itasca, MN

Built 2000 Load: 48.3 t ADT: 15

CSAH 31

Good

Over: MOOSE BROOK

2.4 MI W OF JCT CSAH 26, Itasca, MN

Built 2001 Load: 52.8 t ADT: 30

2171

Good

Over: PIGEON RIVER

4.57 MILES W OF STH 46, Itasca, MN

Built 2018 Load: 53.1 t ADT: 50

CSAH 55

Good

Over: DAY BROOK

0.5 MI S OF JCT CR 554, Itasca, MN

Built 2000 Load: 59.9 t ADT: 55

CSAH 29

Good

Over: CODDINGTON LAKE OUTLET

0.4 MI W OF JCT CSAH 26, Itasca, MN

Built 2004 Load: 70.0 t ADT: 195

CSAH 92

Good

Over: DEER RIVER

0.4 MI S OF JCT CR 248, Itasca, MN

Built 2005 Load: 80.0 t ADT: 187

M 8

Poor

Over: WELCOME CREEK

0.1 MI W OF CO LINE, Itasca, MN

Built 1919 Load: 3.3 t ADT: 10

CR 439

Poor

Over: SPLIT HAND CREEK

0.1 MI N OF JCT CSAH 68, Itasca, MN

Built 1950 Load: 21.6 t ADT: 40

CSAH 68

Poor

Over: SPLIT HAND CREEK

0.4 MI W OF JCT CSAH 3, Itasca, MN

Built 1950 Load: 27.1 t ADT: 60
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.