Pipestone County, MN

182 public highway bridges

Pipestone County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Pipestone County, Minnesota contains 182 public highway bridges. Roughly 65.9% are rated “Good,” 30.8% “Fair,” and 3.3% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

182
Total Bridges
65.9%
Good
30.8%
Fair
3.3%
Poor Condition

Condition Distribution

Good
65.9% (120)
Fair
30.8% (56)
Poor
3.3% (6)

All Bridges (182)

T 277

Fair

Over: N BR PIPESTONE CREEK

0.6 MI N OF JCT CSAH 7, Pipestone, MN

Built 1994 Load: 26.1 t ADT: 30

CSAH 1

Fair

Over: CHANARAMBIE CREEK

0.4 MI W OF JCT CSAH 18, Pipestone, MN

Built 1990 Load: 26.5 t ADT: 1,209

T 288

Fair

Over: REDWOOD RIVER

1.6 MI E OF JCT TH 23, Pipestone, MN

Built 1941 Load: 26.5 t ADT: 75

CSAH 15

Fair

Over: TRIB SPLIT ROCK CREEK

1.5 MI S OF JCT CSAH 4, Pipestone, MN

Built 1930 Load: 26.6 t ADT: 205

CR 59

Fair

Over: TRIB POPLAR CREEK

0.7 MI E OF JCT TH 75, Pipestone, MN

Built 1943 Load: 26.6 t ADT: 56

CSAH 4

Fair

Over: SPLIT ROCK CREEK

0.1 MI E OF JCT TH 23, Pipestone, MN

Built 1946 Load: 27.2 t ADT: 42

US 75

Fair

Over: FLANDREAU CREEK

11.2 MI N OF PIPESTONE, Pipestone, MN

Built 1936 Load: 29.4 t ADT: 1,223

MN 23

Fair

Over: SPLIT ROCK CREEK

0.8 MI NE OF IHLEN, Pipestone, MN

Built 1947 Load: 29.4 t ADT: 3,974

MN 23

Fair

Over: SPLIT ROCK CREEK

1.4 MI NE OF IHLEN, Pipestone, MN

Built 1939 Load: 29.4 t ADT: 3,974

MN 30

Fair

Over: STREAM

3.3 MI W OF PIPESTONE, Pipestone, MN

Built 1934 Load: 29.4 t ADT: 1,865

MN 30

Fair

Over: ROCK RIVER

6.7 MI E OF PIPESTONE, Pipestone, MN

Built 1946 Load: 29.4 t ADT: 1,823

MN 23

Fair

Over: STREAM

5.8 MI NE HOLLAND, Pipestone, MN

Built 1972 Load: 29.4 t ADT: 3,450

MN 23

Fair

Over: ROCK RIVER

1.0 MI N OF HOLLAND, Pipestone, MN

Built 1969 Load: 29.4 t ADT: 2,892

CSAH 18

Fair

Over: TRIB E BR ROCK RIVER

0.6 MI S OF JCT CSAH 7, Pipestone, MN

Built 1979 Load: 29.4 t ADT: 768

T 29

Fair

Over: TRIB ROCK RIVER

0.2 MI E OF JCT CSAH 18, Pipestone, MN

Built 1981 Load: 29.4 t ADT: 22

T 259

Fair

Over: TRIB POPLAR CREEK

0.7 MI S OF JCT CSAH 2, Pipestone, MN

Built 1982 Load: 29.4 t ADT: 120

T 18

Fair

Over: ROCK RIVER

0.4 MI E OF JCT CSAH 17, Pipestone, MN

Built 1984 Load: 30.0 t ADT: 22

MN 23

Fair

Over: JUD DITCH # 1

0.2 MI NE OF PIPESTONE, Pipestone, MN

Built 1969 Load: 32.0 t ADT: 3,921

T 263

Fair

Over: ROCK RIVER

0.6 MI W OF JCT CSAH 17, Pipestone, MN

Built 1987 Load: 32.3 t ADT: 130

T 263

Fair

Over: ROCK RIVER

0.6 MI W OF JCT CSAH 17, Pipestone, MN

Built 2013 Load: 32.4 t ADT: 145

T 112

Fair

Over: N BR PIPESTONE CREEK

0.4 MI S OF JCT CSAH 7, Pipestone, MN

Built 1976 Load: 32.4 t ADT: 30

CSAH 18

Fair

Over: TRIB ROCK RIVER

0.4 MI S OF JCT CSAH 3, Pipestone, MN

Built 1977 Load: 32.4 t ADT: 700

T 64

Fair

Over: WILLOW CREEK

1.0 MI W OF JCT CSAH 15, Pipestone, MN

Built 1979 Load: 32.4 t ADT: 25

CSAH 18

Fair

Over: TRIB E BR ROCK RIVER

0.5 MI S OF JCT CSAH 6, Pipestone, MN

Built 1979 Load: 32.4 t ADT: 768

T 101

Fair

Over: MAIN DITCH

0.4 mi N of jct CSAH 4, Pipestone, MN

Built 1981 Load: 32.4 t ADT: 34

T 125

Fair

Over: TRIB WILLOW CREEK

1.2 MI S OF JCT CSAH 10, Pipestone, MN

Built 1981 Load: 32.4 t ADT: 17

T 22

Fair

Over: ROCK RIVER

0.1 MI W OF JCT CSAH 17, Pipestone, MN

Built 1993 Load: 33.3 t ADT: 26

T 66

Fair

Over: SPLIT ROCK CREEK

0.9 MI S OF JCT TH 23, Pipestone, MN

Built 1997 Load: 34.3 t ADT: 65

T 92

Fair

Over: TRIB POPLAR CREEK

0.1 MI S OF JCT CSAH 9, Pipestone, MN

Built 1993 Load: 35.9 t ADT: 41

T 3

Fair

Over: POPLAR CREEK

1.9 MI E OF JCT TWP 260, Pipestone, MN

Built 1992 Load: 35.9 t ADT: 26

CSAH 16

Fair

Over: ROCK RIVER

0.7 MI S OF JCT TH 23, Pipestone, MN

Built 1990 Load: 35.9 t ADT: 135

T 282

Fair

Over: ROCK RIVER

0.8 mi W of JCT TWP 284, Pipestone, MN

Built 2001 Load: 39.2 t ADT: 28

CSAH 6

Fair

Over: E BR ROCK RIVER

0.9 MI W OF JCT CSAH 18, Pipestone, MN

Built 2003 Load: 39.2 t ADT: 267

T 265

Fair

Over: TRIB ROCK RIVER

0.9 MI W OF JCT CSAH 18, Pipestone, MN

Built 2012 Load: 39.2 t ADT: 63

T 275

Fair

Over: TRIB E BR FLANDREAU CRK

0.6 MI E OF JCT TWP 276, Pipestone, MN

Built 1999 Load: 39.2 t ADT: 20

CSAH 25

Fair

Over: COUNTY DITCH A

0.7 MI N OF JCT TH 30, Pipestone, MN

Built 1993 Load: 39.2 t ADT: 219

T 276

Fair

Over: TRIB N BR PIPESTONE CRK

1.3 MI S OF JCT CSAH 8, Pipestone, MN

Built 1996 Load: 39.2 t ADT: 20

T 255

Fair

Over: SPLIT ROCK CREEK

0.6 MI S OF JCT TH 23, Pipestone, MN

Built 1998 Load: 39.2 t ADT: 85

T 5

Fair

Over: TRIB ROCK RIVER

0.4 MI N OF JCT CSAH 9, Pipestone, MN

Built 1997 Load: 39.2 t ADT: 30

T 14

Fair

Over: TRIB CHANARAMBIE CR

0.8 MI W OF JCT CSAH 18, Pipestone, MN

Built 1996 Load: 39.2 t ADT: 35

T 255

Fair

Over: SPLIT ROCK CREEK

0.9 MI S OF JCT CSAH 2, Pipestone, MN

Built 1998 Load: 39.2 t ADT: 85

T 296

Fair

Over: TRIB PIPESTONE CREEK

0.1 MI N OF JCT TH 30, Pipestone, MN

Built 1999 Load: 39.2 t ADT: 50

T 58

Fair

Over: FLANDREAU CREEK

1.4 MI W OF JCT CSAH 15, Pipestone, MN

Built 1993 Load: 39.2 t ADT: 28

CSAH 9

Fair

Over: TRIB POPLAR CREEK

1.0 MI E OF JCT TH 75, Pipestone, MN

Built 2001 Load: 40.2 t ADT: 961

CSAH 2

Fair

Over: ROCK RIVER

0.8 MI E OF JCT CSAH 17, Pipestone, MN

Built 2010 Load: 40.2 t ADT: 90

T 182

Fair

Over: TRIB BEAVER CREEK

0.1 mi N of JCT TWP 286, Pipestone, MN

Built 2001 Load: 40.8 t ADT: 23

T 253

Fair

Over: PIPESTONE CREEK

0.2 MI N OFJCT CSAH 5, Pipestone, MN

Built 2010 Load: 41.8 t ADT: 134

T 124

Fair

Over: FLANDREAU CREEK

0.1 MI S OF JCT TWP 273, Pipestone, MN

Built 1997 Load: 42.8 t ADT: 20

MN 23

Fair

Over: SPLIT ROCK CREEK

0.5 MI SW OF IHLEN, Pipestone, MN

Built 1937 Load: 43.4 t ADT: 3,278

CSAH 9

Fair

Over: CHANARAMBIE CREEK

0.4 MI W OF JCT CSAH 18, Pipestone, MN

Built 2005 Load: 43.4 t ADT: 1,444
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.