Pipestone County, MN

182 public highway bridges

Pipestone County Bridge Snapshot

Pipestone County, Minnesota contains 182 public highway bridges in the FHWA National Bridge Inventory. Roughly 65.9% are rated “Good,” 30.8% “Fair,” 3.3% “Poor,” and 3.3% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in MN are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

182
Total Bridges
65.9%
Good
3.3%
Poor
3.3%
Structurally Deficient

Condition Distribution

Good
65.9% (120)
Fair
30.8% (56)
Poor
3.3% (6)
SD
3.3% (6)

All Bridges (182)

CSAH 30

Fair

Over: MAIN DITCH

0.4 MI N OF JCT CSAH 22, Pipestone, MN

Built 1990 Load: 45.1 t ADT: 984

T 12

Fair

Over: TRIB CHANARAMBIE CR

0.3 MI N OF JCT CSAH 9, Pipestone, MN

Built 1998 Load: 48.3 t ADT: 24

CSAH 13

Fair

Over: PIPESTONE CREEK

0.5 MI S OF JCT TH 30, Pipestone, MN

Built 1993 Load: 48.6 t ADT: 308

T 92

Fair

Over: POPLAR CREEK

0.9 MI S OF JCT CSAH 9, Pipestone, MN

Built 2007 Load: 50.2 t ADT: 49

T 11

Fair

Over: ROCK RIVER

1.2 MI W OF JCT CSAH 17, Pipestone, MN

Built 1997 Load: 52.2 t ADT: 33

CSAH 5

Fair

Over: PIPESTONE CREEK

1.4 MI E OF JCT CSAH 13, Pipestone, MN

Built 1995 Load: 60.4 t ADT: 90

MN 23

Good

Over: REDWOOD RIVER

IN RUTHTON, Pipestone, MN

Built 1972 Load: 29.4 t ADT: 2,718

MN 269

Good

Over: SPLIT ROCK CREEK

0.1 MI W OF JCT TH 23, Pipestone, MN

Built 1977 Load: 29.4 t ADT: 2,211

MN 30

Good

Over: STREAM

7.0 MILES EAST OF PIPEST, Pipestone, MN

Built 1999 Load: 30.0 t ADT: 1,823

T 86

Good

Over: TRIB ROCK RIVER

0.1 MI S JCT CSAH 2, Pipestone, MN

Built 2007 Load: 32.4 t ADT: 48

T 252

Good

Over: TRIB PIPESTONE CREEK

0.6 MI W OF JCT CSAH 13, Pipestone, MN

Built 2011 Load: 32.4 t ADT: 22

T 278

Good

Over: N BR PIPESTONE CREEK

0.4 MI S OF JCT CSAH 8, Pipestone, MN

Built 2011 Load: 32.4 t ADT: 39

CSAH 15

Good

Over: PIPESTONE CREEK

0.8 MI N OF JCT CSAH 5, Pipestone, MN

Built 2012 Load: 32.4 t ADT: 309

CR 107

Good

Over: COUNTY DITCH A

0.1 MI W OF JCT TH 23, Pipestone, MN

Built 2012 Load: 32.4 t ADT: 40

CSAH 78

Good

Over: E BR FLANDREAU CREEK

0.5 MI N OF JCT CSAH 10, Pipestone, MN

Built 2015 Load: 32.4 t ADT: 48

T 276

Good

Over: N BR PIPESTONE CREEK

0.3 MI N OF JCT CSAH 7, Pipestone, MN

Built 2013 Load: 32.4 t ADT: 24

T 64

Good

Over: FLANDREAU CREEK

0.3 MI E OF JCT TWP 276, Pipestone, MN

Built 2014 Load: 32.4 t ADT: 33

CSAH 10

Good

Over: FLANDREAU CREEK

0.1 MI E OF JCT CSAH 15, Pipestone, MN

Built 2011 Load: 32.4 t ADT: 358

CSAH 10

Good

Over: E BR FLANDREAU CREEK

0.7 MI E OF JCT TH 75, Pipestone, MN

Built 2014 Load: 32.4 t ADT: 357

CSAH 10

Good

Over: E BR FLANDREAU CREEK

0.6 MI W OF JCT TWP 278, Pipestone, MN

Built 2012 Load: 32.4 t ADT: 357

T 279

Good

Over: COUNTY DITCH A

0.2 MI S OF JCT CSAH 7, Pipestone, MN

Built 2014 Load: 32.4 t ADT: 67

T 280

Good

Over: TRIB N BR PIPESTONE CRK

0.6 MI E OF JCT TWP 278, Pipestone, MN

Built 2015 Load: 32.4 t ADT: 30

CSAH 11

Good

Over: TRIB E BR FLANDREAU CRK

0.9 MI E OF JCT TWP 278, Pipestone, MN

Built 2018 Load: 32.4 t ADT: 143

CSAH 2

Good

Over: TRIB TO ROCK RIVER

0.3 MI E OF JCT CSAH 16, Pipestone, MN

Built 2019 Load: 32.4 t ADT: 90

T 279

Good

Over: N BR PIPESTONE CREEK

0.7 MI S OF JCT TWP 280, Pipestone, MN

Built 2017 Load: 32.4 t ADT: 53

T 284

Good

Over: TRIB ROCK RIVER

0.8 MI S OF JCT CSAH 7, Pipestone, MN

Built 2015 Load: 32.4 t ADT: 36

T 58

Good

Over: WILLOW CREEK

0.1 MI E OF JCT CSAH 14, Pipestone, MN

Built 2015 Load: 32.4 t ADT: 27

T 65

Good

Over: E BR FLANDREAU CREEK

0.3 MI E OF JCT TWP 278, Pipestone, MN

Built 2015 Load: 32.4 t ADT: 28

CSAH 16

Good

Over: TRIB ROCK RIVER

0.1 MI E OF JCT TWP 261, Pipestone, MN

Built 2014 Load: 32.4 t ADT: 305

CSAH 16

Good

Over: ROCK RIVER

0.2 MI N OF JCT T 283, Pipestone, MN

Built 2020 Load: 32.4 t ADT: 135

CSAH 6

Good

Over: ROCK RIVER

0.7 MI E OF JCT CSAH 16, Pipestone, MN

Built 2014 Load: 32.4 t ADT: 267

CSAH 6

Good

Over: E BR ROCK RIVER

0.1 MI E OF JCT TWP 284, Pipestone, MN

Built 2014 Load: 32.4 t ADT: 267

CSAH 6

Good

Over: E BR ROCK RIVER

0.5 MI W OF JCT CSAH 18, Pipestone, MN

Built 2014 Load: 32.4 t ADT: 267

M 5

Good

Over: TRIB ROCK RIVER

0.5 MI W OF JCT CSAH 16, Pipestone, MN

Built 2017 Load: 32.4 t ADT: 54

T 7

Good

Over: SPLIT ROCK CREEK

0.5 MI E OF JCT TH 23, Pipestone, MN

Built 2017 Load: 32.4 t ADT: 67

T 270

Good

Over: COUNTY DITCH A

0.3 MI E OF JCT TH 23, Pipestone, MN

Built 2017 Load: 32.4 t ADT: 30

CSAH 16

Good

Over: TRIB ROCK RIVER

0.5 MI N OF JCT CSAH 2, Pipestone, MN

Built 2017 Load: 32.4 t ADT: 305

CSAH 16

Good

Over: TRIB ROCK RIVER

0.7 MI N OF JCT CSAH 2, Pipestone, MN

Built 2017 Load: 32.4 t ADT: 305

T 92

Good

Over: TRIB POPLAR CREEK

0.4 MI S OF JCT CSAH 9, Pipestone, MN

Built 2016 Load: 32.4 t ADT: 54

T 179

Good

Over: TRIB ROCK RIVER

1.0 MI S OF JCT CSAH 1, Pipestone, MN

Built 2016 Load: 32.4 t ADT: 53

CR 67

Good

Over: PIPESTONE CREEK

0.7 MI W OF JCT CSAH 30, Pipestone, MN

Built 2019 Load: 32.4 t ADT: 196

CSAH 8

Good

Over: N BR PIPESTONE CREEK

2.3 MI E OF JCT US 75, Pipestone, MN

Built 2021 Load: 32.4 t ADT: 155

T 261

Good

Over: TRIB ROCK RIVER

0.1 MI S OF JCT CSAH 16, Pipestone, MN

Built 2022 Load: 32.4 t ADT: 97

T 283

Good

Over: ROCK RIVER

0.1 MI W OF JCT CSAH 16, Pipestone, MN

Built 2022 Load: 32.4 t ADT: 69

T 274

Good

Over: TRIB FLANDREAU CREEK

1.0 MI W OF JCT CSAH 15, Pipestone, MN

Built 2021 Load: 32.4 t ADT: 14

T 276

Good

Over: TRIB FLANDREAU CREEK

0.6 MI N OF JCT CSAH 10, Pipestone, MN

Built 2021 Load: 32.4 t ADT: 28

T 264

Good

Over: TRIB CHANARAMBIE CREEK

0.7 MI E OF JCT CSAH 18, Pipestone, MN

Built 2020 Load: 32.4 t ADT: 36

CSAH 18

Good

Over: TRIB CHANARAMBIE CREEK

0.2 MI S OF JCT CSAH 2, Pipestone, MN

Built 2022 Load: 32.4 t ADT: 700

T 289

Good

Over: TRIB REDWOOD RIVER

1.4 MI W OF JCT CSAH 18, Pipestone, MN

Built 2021 Load: 32.4 t ADT: 89

T 302

Good

Over: TRIB REDWOOD RIVER

1.9 MI E OF JCT TH 23, Pipestone, MN

Built 2022 Load: 32.4 t ADT: 96

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial