Churchill County, NV

70 public highway bridges

Churchill County Bridge Snapshot

Churchill County, Nevada contains 70 public highway bridges in the FHWA National Bridge Inventory. Roughly 51.4% are rated “Good,” 45.7% “Fair,” 0% “Poor,” and 0% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in NV are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

70
Total Bridges
51.4%
Good
0%
Poor
0%
Structurally Deficient

Condition Distribution

Good
51.4% (36)
Fair
45.7% (32)
Poor
0% (0)
SD
0% (0)

All Bridges (70)

US95

Good

Over: DRAINAGE

S of SR120 PASTURE ROAD, Churchill, NV

Built 2017 Load: 33.9 t ADT: 1,300

US95

Good

Over: DRAINAGE

S of SR120 PASTURE ROAD, Churchill, NV

Built 2017 Load: 33.9 t ADT: 1,300

ST CLAIR RD.

Good

Over: AA-CANAL

SW OF FALLON, Churchill, NV

Built 2008 Load: 34.3 t ADT: 2,000

LATTIN ROAD

Good

Over: L-CANAL

WEST OF FALLON, Churchill, NV

Built 2018 Load: 34.9 t ADT: 33

ST CLAIR RD

Good

Over: AA-CANAL

SW OF FALLON, Churchill, NV

Built 2008 Load: 35.9 t ADT: 2,000

IRR TRIPLE E LN

Good

Over: S-2 CANAL

EAST OF FALLON, Churchill, NV

Built 1998 Load: 36.6 t ADT: 66

ALLEN RD

Good

Over: L-CANAL

WEST OF FALLON, Churchill, NV

Built 1998 Load: 36.6 t ADT: 4,400

SR 115 HARRIGAN RD

Good

Over: L LINE CANAL

SOUTH OF FALLON, Churchill, NV

Built 2016 Load: 36.6 t ADT: 2,550

US 50

Good

Over: STINGAREE WASH

EAST OF FALLON, Churchill, NV

Built 1961 Load: 37.6 t ADT: 860

US 95

Good

Over: HUMBOLDT SLOUGH

NORTH OF FALLON, Churchill, NV

Built 1958 Load: 39.2 t ADT: 1,200

SR117 SHECKLER RD

Good

Over: AA-CANAL

FALLON, Churchill, NV

Built 1986 Load: 42.4 t ADT: 2,150

I 80E

Good

Over: NIGHTINGALE EXIT 65

EAST OF FERNLEY, Churchill, NV

Built 1962 Load: 43.7 t ADT: 4,975

ALCORN ROAD

Good

Over: V - CANAL

WEST OF FALLON, Churchill, NV

Built 2013 Load: 45.4 t ADT: 400

NEW RIVER PKWY

Good

Over: L CANAL

SE OF FALLON, Churchill, NV

Built 2013 Load: 46.6 t ADT: 3,700

US 50

Good

Over: RIVER EXTENSION DRAIN

EAST OF FALLON, Churchill, NV

Built 1959 Load: 49.0 t ADT: 1,300

US 95

Good

Over: CARSON RIVER

NORTH OF FALLON, Churchill, NV

Built 1987 Load: 49.9 t ADT: 3,150

US 95

Good

Over: LOWER HUMBOLDT DRAIN

NORTH OF FALLON, Churchill, NV

Built 2005 Load: 66.2 t ADT: 1,200

SR117 SHECKLER RD

Good

Over: V-CANAL

FALLON, Churchill, NV

Built 1986 Load: 70.2 t ADT: 2,550

US 50

Good

Over: T CANAL

WEST OF FALLON, Churchill, NV

Built 1986 Load: 71.8 t ADT: 14,400

US95

Good

Over: DRAINAGE

S of SR120 PASTURE RD, Churchill, NV

Built 2017 Load: 99.9 t ADT: 1,300

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial