Churchill County, NV

70 public highway bridges

Churchill County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Churchill County, Nevada contains 70 public highway bridges. Roughly 51.4% are rated “Good,” 45.7% “Fair,” and 0% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

70
Total Bridges
51.4%
Good
45.7%
Fair
0%
Poor Condition

Condition Distribution

Good
51.4% (36)
Fair
45.7% (32)
Poor
0% (0)

All Bridges (70)

US95

Good

Over: DRAINAGE

S of SR120 PASTURE ROAD, Churchill, NV

Built 2017 Load: 33.9 t ADT: 1,300

US95

Good

Over: DRAINAGE

S of SR120 PASTURE ROAD, Churchill, NV

Built 2017 Load: 33.9 t ADT: 1,300

ST CLAIR RD.

Good

Over: AA-CANAL

SW OF FALLON, Churchill, NV

Built 2008 Load: 34.3 t ADT: 2,000

LATTIN ROAD

Good

Over: L-CANAL

WEST OF FALLON, Churchill, NV

Built 2018 Load: 34.9 t ADT: 33

ST CLAIR RD

Good

Over: AA-CANAL

SW OF FALLON, Churchill, NV

Built 2008 Load: 35.9 t ADT: 2,000

IRR TRIPLE E LN

Good

Over: S-2 CANAL

EAST OF FALLON, Churchill, NV

Built 1998 Load: 36.6 t ADT: 66

ALLEN RD

Good

Over: L-CANAL

WEST OF FALLON, Churchill, NV

Built 1998 Load: 36.6 t ADT: 4,400

SR 115 HARRIGAN RD

Good

Over: L LINE CANAL

SOUTH OF FALLON, Churchill, NV

Built 2016 Load: 36.6 t ADT: 2,550

US 50

Good

Over: STINGAREE WASH

EAST OF FALLON, Churchill, NV

Built 1961 Load: 37.6 t ADT: 860

US 95

Good

Over: HUMBOLDT SLOUGH

NORTH OF FALLON, Churchill, NV

Built 1958 Load: 39.2 t ADT: 1,200

SR117 SHECKLER RD

Good

Over: AA-CANAL

FALLON, Churchill, NV

Built 1986 Load: 42.4 t ADT: 2,150

I 80E

Good

Over: NIGHTINGALE EXIT 65

EAST OF FERNLEY, Churchill, NV

Built 1962 Load: 43.7 t ADT: 4,975

ALCORN ROAD

Good

Over: V - CANAL

WEST OF FALLON, Churchill, NV

Built 2013 Load: 45.4 t ADT: 400

NEW RIVER PKWY

Good

Over: L CANAL

SE OF FALLON, Churchill, NV

Built 2013 Load: 46.6 t ADT: 3,700

US 50

Good

Over: RIVER EXTENSION DRAIN

EAST OF FALLON, Churchill, NV

Built 1959 Load: 49.0 t ADT: 1,300

US 95

Good

Over: CARSON RIVER

NORTH OF FALLON, Churchill, NV

Built 1987 Load: 49.9 t ADT: 3,150

US 95

Good

Over: LOWER HUMBOLDT DRAIN

NORTH OF FALLON, Churchill, NV

Built 2005 Load: 66.2 t ADT: 1,200

SR117 SHECKLER RD

Good

Over: V-CANAL

FALLON, Churchill, NV

Built 1986 Load: 70.2 t ADT: 2,550

US 50

Good

Over: T CANAL

WEST OF FALLON, Churchill, NV

Built 1986 Load: 71.8 t ADT: 14,400

US95

Good

Over: DRAINAGE

S of SR120 PASTURE RD, Churchill, NV

Built 2017 Load: 99.9 t ADT: 1,300
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.