Caddo County, OK

414 public highway bridges

Caddo County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Caddo County, Oklahoma contains 414 public highway bridges. Roughly 23.7% are rated “Good,” 61.6% “Fair,” and 11.4% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

414
Total Bridges
23.7%
Good
61.6%
Fair
11.4%
Poor Condition

Condition Distribution

Good
23.7% (98)
Fair
61.6% (255)
Poor
11.4% (47)

All Bridges (414)

E1120

Fair

Over: CREEK

2. N 3.5 W SICKLES, Caddo, OK

Built 1989 Load: 37.8 t ADT: 50

E1460

Fair

Over: CHETONIA CREEK

1.4 MI E OF US 277, Caddo, OK

Built 1982 Load: 38.6 t ADT: 100

N2620

Fair

Over: HOG CREEK

2. E .1 S OF SH 9, Caddo, OK

Built 1982 Load: 38.6 t ADT: 377

0860C

Fair

Over: MUD CREEK

2.7 N 4. W HATCHETVILL, Caddo, OK

Built 1985 Load: 38.7 t ADT: 44

S.H. 8

Fair

Over: CREEK

6 MI S US62 IN ANADARK, Caddo, OK

Built 1939 Load: 39.0 t ADT: 2,200

S.H. 9

Fair

Over: WASHITA RIVER

4 MI E KIOWA C/L, Caddo, OK

Built 1986 Load: 39.0 t ADT: 1,600

U.S. 281

Fair

Over: HONEY CREEK

5.8 N SH152 IN BINGER, Caddo, OK

Built 2002 Load: 39.0 t ADT: 2,000

U.S. 281

Fair

Over: SUGAR CREEK O'FLOW

6 N SH152 IN BINGER, Caddo, OK

Built 2002 Load: 39.0 t ADT: 2,000

N2520

Fair

Over: CREEK

4E 8.5N OF S.H. 152, Caddo, OK

Built 2001 Load: 39.0 t ADT: 50

IRR N2510

Fair

Over: CREEK

5E 5.7S SH152, Caddo, OK

Built 2002 Load: 39.0 t ADT: 50

IRR E1230

Fair

Over: SUGAR CREEK

7E OF ALBERT, Caddo, OK

Built 2022 Load: 39.0 t ADT: 100

E1330

Fair

Over: WASHITA RIVER

1. N 3.6 E OF US 62, Caddo, OK

Built 1986 Load: 39.5 t ADT: 100

E1450

Fair

Over: CREEK

1N; .3W OF S.H. 19, Caddo, OK

Built 2008 Load: 39.5 t ADT: 100

N2710

Fair

Over: CREEK

2W 2.9N OF COGAR, Caddo, OK

Built 2003 Load: 39.6 t ADT: 100

U.S. 281

Fair

Over: SUGAR CREEK

0.3 SE SH152 BINGER, Caddo, OK

Built 1960 Load: 39.9 t ADT: 2,800

E1370

Fair

Over: DELAWARE CREEK

6.5 N 2.0 W OF CEMENT, Caddo, OK

Built 1996 Load: 39.9 t ADT: 100

E1050

Fair

Over: CREEK

2.5S 2.2E JCT US81/I-40, Caddo, OK

Built 2002 Load: 39.9 t ADT: 50

U.S. 62

Fair

Over: CREEK

0.6 MI W GRADY CO, Caddo, OK

Built 1938 Load: 40.2 t ADT: 6,300

IRR 0850C

Fair

Over: CREEK

2. M W STECKER, Caddo, OK

Built 1998 Load: 40.2 t ADT: 306

E1350

Fair

Over: CREEK

1N 2.1W JCT US62/SH9W, Caddo, OK

Built 2003 Load: 40.3 t ADT: 50

N2510

Fair

Over: CREEK

2.E 4.2N JCT SH19/SH58N, Caddo, OK

Built 1996 Load: 40.4 t ADT: 50

E1140

Fair

Over: CREEK

2.2 W SH 58, Caddo, OK

Built 1997 Load: 40.4 t ADT: 50

E1040

Fair

Over: POND CREEK O'FLOW

1.5 S & .3 E US281/I-40, Caddo, OK

Built 1999 Load: 40.4 t ADT: 50

0852C

Fair

Over: WEST FORK CREEK

5. S 2.6 E OF US 62, Caddo, OK

Built 1997 Load: 40.5 t ADT: 102

0838C

Fair

Over: WASHITA RIVER

5.1 MI E OF FORT COBB, Caddo, OK

Built 1986 Load: 40.6 t ADT: 375

E1270

Fair

Over: CREEK

5N 5.5E OF CARNEGIE, Caddo, OK

Built 2004 Load: 40.6 t ADT: 100

IRR E1430

Fair

Over: CREEK

3N 8.3W OF S.H. 19, Caddo, OK

Built 2006 Load: 40.6 t ADT: 50

IRR E1325

Fair

Over: COBB CREEK

1.5 S .8 E OF SH 9, Caddo, OK

Built 1960 Load: 40.9 t ADT: 100

IRR 0850C

Fair

Over: CREEK

1W OF STECKER, Caddo, OK

Built 2003 Load: 41.0 t ADT: 306

0854C

Fair

Over: CREEK

1.5E 2.5N OF CEMENT, Caddo, OK

Built 2007 Load: 41.6 t ADT: 100

E1470

Fair

Over: LITTLE WASHITA RIVER

1. S 1.2 W OF US 277, Caddo, OK

Built 2000 Load: 41.7 t ADT: 100

E1377

Fair

Over: CREEK

5S 7.2E OF S.H. 9, Caddo, OK

Built 2009 Load: 41.9 t ADT: 75

S.H. 8

Fair

Over: CREEK

1.7 S US62 ANADARKO, Caddo, OK

Built 1957 Load: 42.4 t ADT: 2,800

S.H. 152

Fair

Over: LAKE CREEK

2.2 MI E JCT SH 58, Caddo, OK

Built 1981 Load: 42.6 t ADT: 1,300

E1262

Fair

Over: CREEK

8 N .5 W US62/281, Caddo, OK

Built 2001 Load: 42.7 t ADT: 100

N2520

Fair

Over: CREEK

3E 2.1N JCT SH19/SH58, Caddo, OK

Built 2001 Load: 43.2 t ADT: 100

E1210

Fair

Over: STINKING CREEK

5S .4W OF S.H. 37, Caddo, OK

Built 2004 Load: 43.4 t ADT: 100

N2490

Fair

Over: CREEK

3. E 2.9 N OF SH 58, Caddo, OK

Built 1997 Load: 44.3 t ADT: 50

S.H. 58

Fair

Over: CREEK

.9 MI S JCT SH 19, Caddo, OK

Built 1962 Load: 44.6 t ADT: 860

N2560

Fair

Over: TAHOE CREEK

4. W .7 N OF SH 19, Caddo, OK

Built 1982 Load: 44.7 t ADT: 100

E1300

Fair

Over: COBB CREEK

1N .7E OF SH9, Caddo, OK

Built 2004 Load: 44.9 t ADT: 50

0812C

Fair

Over: CREEK

2.7 MI E SH 58, Caddo, OK

Built 2006 Load: 45.1 t ADT: 55

S.H. 9

Fair

Over: BELLAMY CREEK

2.4 MI W JCT US 62, Caddo, OK

Built 1931 Load: 45.4 t ADT: 2,600

N2740

Fair

Over: CREEK

5E 5.1N OF US 277/SH 8, Caddo, OK

Built 1999 Load: 45.8 t ADT: 50

IRR E1170

Fair

Over: SUGAR CREEK

.8 N BINGER, Caddo, OK

Built 1995 Load: 46.2 t ADT: 50

N2700

Fair

Over: BULLET CREEK

3W & 1.9N OF COGAR, Caddo, OK

Built 2009 Load: 46.4 t ADT: 50

N2650

Fair

Over: CREEK

2W; 3.9S OF U.S. 62, Caddo, OK

Built 2009 Load: 46.4 t ADT: 100

E1180

Fair

Over: CREEK

0.1 MI E OF EAKLY, Caddo, OK

Built 1992 Load: 46.9 t ADT: 100

U.S. 62

Fair

Over: TONKAWA CREEK

6.5 MI W GRADY C/L, Caddo, OK

Built 1984 Load: 47.2 t ADT: 3,150

0844C

Fair

Over: CREEK

6S AND 1.5W OF FORT COBB, Caddo, OK

Built 2005 Load: 47.3 t ADT: 100
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.