Blount County, TN

220 public highway bridges

Blount County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Blount County, Tennessee contains 220 public highway bridges. Roughly 52.7% are rated “Good,” 31.8% “Fair,” and 2.3% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

220
Total Bridges
52.7%
Good
31.8%
Fair
2.3%
Poor Condition

Condition Distribution

Good
52.7% (116)
Fair
31.8% (70)
Poor
2.3% (5)

All Bridges (220)

NFA A859

Good

Over: NINE MILE CREEK

13.5 M. SW. MARYVILLE., Blount, TN

Built 2010 Load: 36.3 t ADT: 440

TOWNSEND ENTRANCE

Good

Over: LITTLE RIVER

0.1 MILES NORTH FROM NPS, Blount, TN

Built 1952 Load: 39.9 t ADT: 2,710

FAU 33

Good

Over: LITTLE RIVER

.1 M N OF ROCKFORD, Blount, TN

Built 1925 Load: 59.9 t ADT: 17,917

FOOTHILLS PARKWAY

Good

Over: MURRAY GAP ROAD

7.0 MI NORTHEAST FROM U.S, Blount, TN

Built 1962 Load: 62.6 t ADT: 300

FORGE CREEK ROAD

Good

Over: MILL CREEK

0.2 MILE TO NPS ROUTE 500, Blount, TN

Built 1956 Load: 99.9 t ADT: 100

FORGE CREEK ROAD

Good

Over: FORGE CREEK

1.7 MILES TO NPS ROUTE 50, Blount, TN

Built 1956 Load: 99.9 t ADT: 100

FORGE CREEK ROAD

Good

Over: FORGE CREEK

1.5 MI TO NPS RTE. 500, Blount, TN

Built 1982 Load: 99.9 t ADT: 100

FORGE CREEK ROAD

Good

Over: FORGE CREEK

1.6 MI TO NPS RTE. 500, Blount, TN

Built 1956 Load: 99.9 t ADT: 100

FOOTHILLS PARKWAY

Good

Over: RAVINE

9.5 MILES WEST FROM U.S., Blount, TN

Built 2009 Load: 99.9 t ADT: 764

FOOTHILLS PARKWAY

Good

Over: RAVINE

4.1MILES WEST FROM U.S. R, Blount, TN

Built 2013 Load: 99.9 t ADT: 764

FOOTHILLS PARKWAY

Good

Over: RAVINE

10.4 MILES WEST FROM U.S., Blount, TN

Built 2018 Load: 99.9 t ADT: 764

FOOTHILLS PARKWAY

Good

Over: RAVINE

10.1 MILES WEST FROM U.S., Blount, TN

Built 2018 Load: 99.9 t ADT: 764

FOOTHILLS PARKWAY

Good

Over: RAVINE

9.9 MILES WEST FROM U.S., Blount, TN

Built 2018 Load: 99.9 t ADT: 764

FOOTHILLS PARKWAY

Good

Over: RAVINE

10.0 MILES WEST FROM U.S., Blount, TN

Built 2018 Load: 99.9 t ADT: 764

FOOTHILLS PARKWAY

Good

Over: RAVINE

9.8 MILES EAST FROM U.S., Blount, TN

Built 2018 Load: 99.9 t ADT: 764

NFA A868

Poor

Over: NINE MILE CREEK

14 M. SW. MARYVILLE., Blount, TN

Built 1930 ADT: 40

NFA 5551

Poor

Over: GALLAGHER CREEK

SW OF SR 333, Blount, TN

Built 1930 ADT: 1,214

NFA A300

Poor

Over: PISTOL CREEK

8.5 M. NE. MARYVILLE., Blount, TN

Built 1960 Load: 7.5 t ADT: 1,456

PARSON BRANCH ROAD

Poor

Over: PARSON BRANCH

0.1 MILES FROM U.S. ROUTE, Blount, TN

Built 1955 Load: 14.5 t ADT: 1

FAU 33

Poor

Over: RODDY BRANCH

1.2 M W OF SR115, Blount, TN

Built 1924 Load: 16.5 t ADT: 6,242
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.