Bell County, TX

660 public highway bridges

Bell County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Bell County, Texas contains 660 public highway bridges. Roughly 40.5% are rated “Good,” 40.5% “Fair,” and 0.3% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

660
Total Bridges
40.5%
Good
40.5%
Fair
0.3%
Poor Condition

Condition Distribution

Good
40.5% (267)
Fair
40.5% (267)
Poor
0.3% (2)

All Bridges (660)

WS YOUNG DRIVE

Good

Over: BNSF RR/S NOLAN CEEK

0.20 MI N OF US 190 BU, Bell, TX

Built 1975 Load: 24.5 t ADT: 12,186

WS YOUNG DRIVE

Good

Over: LITTLE NOLAN CREEK BR

0.10 MI S OF US 190, Bell, TX

Built 1975 Load: 24.5 t ADT: 30,132

WEST ELMS ROAD

Good

Over: DRAW

0.35 MI W OF TALLWOOD DR, Bell, TX

Built 1995 Load: 24.5 t ADT: 400

TRIMMIER ROAD

Good

Over: NOLAN CREEK TRIB

0.20 MI N OF FM 3470, Bell, TX

Built 1995 Load: 24.5 t ADT: 10,932

WALMART BLVD

Good

Over: LITTLE NOLAN CREEK BR

0.10 MI S OF US 190, Bell, TX

Built 2002 Load: 24.5 t ADT: 572

ELMER KING ROAD

Good

Over: LAMPASAS RIVER TRIB

0.40 MI S OF TOLL BRIDGE, Bell, TX

Built 1996 Load: 24.5 t ADT: 450

TOLL BRIDGE ROAD

Good

Over: LAMPASAS RIVER TRIB

0.65 MI S OF IH 35, Bell, TX

Built 1980 Load: 24.5 t ADT: 550

FM 2601

Good

Over: STAMPEDE CREEK

2.98 MI W OF SH 317, Bell, TX

Built 1961 Load: 26.3 t ADT: 545

FM 2670

Good

Over: REESE CREEK

0.8 MI W OF SH 195, Bell, TX

Built 1963 Load: 28.1 t ADT: 1,148

US 190 EBML

Good

Over: SOUTH NOLAN CREEK

1.0 MI E OF FM 3219, Bell, TX

Built 1976 Load: 29.0 t ADT: 26,140

FM 436

Good

Over: KNOB CREEK

1.90 MI S OF US 190, Bell, TX

Built 1994 Load: 29.0 t ADT: 434

SH 53

Good

Over: COTTONWOOD CREEK RELIEF

0.12 MI E OF FM 3117, Bell, TX

Built 1961 Load: 29.9 t ADT: 4,873

FM 2601

Good

Over: PAYNE BRANCH

2.01 MI W OF SH 317, Bell, TX

Built 1961 Load: 29.9 t ADT: 545

FM 2843

Good

Over: SALADO CREEK

3.60 MI SW OF IH 35, Bell, TX

Built 1966 Load: 29.9 t ADT: 1,756

US 190 WBFR

Good

Over: SOUTH NOLAN CREEK

1.39 MI E OF FM 3423, Bell, TX

Built 1976 Load: 30.8 t ADT: 570

US 190 EBFR

Good

Over: SOUTH NOLAN CREEK

1.39 MI E OF FM 3423, Bell, TX

Built 1976 Load: 30.8 t ADT: 370

SH 53

Good

Over: CAMP CREEK

1.48 MI E OF FM 2086, Bell, TX

Built 1961 Load: 30.8 t ADT: 4,417

FM 1671

Good

Over: NORTH ELM CREEK

0.11 MI E OF FM 485, Bell, TX

Built 1957 Load: 30.8 t ADT: 279

FM 93

Good

Over: NOLAN CREEK

1.01 MI S OF FM 439, Bell, TX

Built 1968 Load: 31.7 t ADT: 2,788

EAST RANGE RD

Good

Over: STORM DRAINAGE

3.3 KM S OF BRIDGE BVR15, Bell, TX

Built 2020 Load: 31.8 t ADT: 300

SANTA FE RD

Good

Over: HOOD RD INTO FT HOOD

S OF FT HOOD MAIN GATE, Bell, TX

Built 1996 Load: 32.4 t ADT: 1,200

IH 35

Good

Over: TRIB. OF KINGS BRANCH

1.32 MI. NORTH OF FM 935, Bell, TX

Built 2018 Load: 32.7 t ADT: 68,800

IH 35 NBML

Good

Over: BIG ELM CREEK

1.45 MI. NORTH OF FM 935, Bell, TX

Built 2018 Load: 32.7 t ADT: 68,800

IH 35 NBFR

Good

Over: BIG ELM CREEK

1.45 MI. NORTH OF FM 935, Bell, TX

Built 2018 Load: 32.7 t ADT: 1,700

IH 35 SBFR

Good

Over: Big Elm Creek

3.20 Mi S of Falls C/L, Bell, TX

Built 2016 Load: 32.7 t ADT: 1,700

IH 35

Good

Over: Reat Creek

1.52 Mi S of Falls C/L, Bell, TX

Built 2016 Load: 32.7 t ADT: 64,462

IH 35 NBML

Good

Over: Deer Creek

0.07 ME S of Falls C/L, Bell, TX

Built 2016 Load: 32.7 t ADT: 34,880

IH 35 SBML

Good

Over: Deer Creek

0.07 Mi S of Falls C/L, Bell, TX

Built 2016 Load: 32.7 t ADT: 36,430

IH 35 NBFR

Good

Over: DEER CREEK

2.29 MI. NORTH OF FM 935, Bell, TX

Built 2016 Load: 32.7 t ADT: 1,700

IH 35 SBFR

Good

Over: Deer Creek

0.07 Mi S of Falls C/L, Bell, TX

Built 2016 Load: 32.7 t ADT: 1,700

IH 35

Good

Over: BRINDLEY BRANCH

0.20 MI N OF LP 363, Bell, TX

Built 2017 Load: 32.7 t ADT: 69,919

IH 35 SBFR

Good

Over: LITTLE ELM CREEK

0.50 MI N OF LP 363, Bell, TX

Built 2016 Load: 32.7 t ADT: 4,500

IH 35 NBFR

Good

Over: LITTLE ELM CREEK

0.50 MI N OF LP 363, Bell, TX

Built 2016 Load: 32.7 t ADT: 5,000

BERGER/HART RD

Good

Over: CHANNEL A OUTFALL

0.02 MI. W. of IH 35, Bell, TX

Built 2018 Load: 32.7 t ADT: 68,800

IH 35

Good

Over: Cottonwood Creek

0.35 Mi S of FM 1237, Bell, TX

Built 2016 Load: 32.7 t ADT: 69,919

CLARENCE RD

Good

Over: COTTONWOOD CREEK

0.02 MI. W. of IH 35, Bell, TX

Built 2018 Load: 32.7 t ADT: 68,800

IH 35 SBFR DRWY

Good

Over: COTTONWOOD CREEK

0.2 MI. SW of FM 1237, Bell, TX

Built 2018 Load: 32.7 t ADT: 5

IH 35 FRs

Good

Over: Kings Branch

0.83 Mi S of FM 935, Bell, TX

Built 2016 Load: 32.7 t ADT: 66,396

IH 35

Good

Over: Troy Branch

0.06 Mi N of FM 935, Bell, TX

Built 2016 Load: 32.7 t ADT: 63,802

IH 35 ML and FR

Good

Over: Carpenter Creek

0.6 Mi N of FM 935, Bell, TX

Built 2016 Load: 32.7 t ADT: 63,802

IH 35 NBML

Good

Over: LITTLE ELM CREEK

0.50 MI N OF LP 363, Bell, TX

Built 2017 Load: 32.7 t ADT: 38,027

IH 35 SBML

Good

Over: LITTLE ELM CREEK

0.5 MILES NORTH LP 363, Bell, TX

Built 2018 Load: 32.7 t ADT: 39,600

SH 317

Good

Over: NOLAN CREEK

0.50 MI S OF FM 93, Bell, TX

Built 1999 Load: 32.7 t ADT: 11,637

IH 35 NBFR

Good

Over: LAMPASAS RIVER

2.25 MI SW OF LOOP 121, Bell, TX

Built 2011 Load: 32.7 t ADT: 1,014

IH 35 SBFR

Good

Over: LAMPASAS RIVER

2.25 MI SW OF LP 121, Bell, TX

Built 2016 Load: 32.7 t ADT: 1,000

IH 35

Good

Over: Amity Branch

2.42 Mi. North of FM 2484, Bell, TX

Built 2017 Load: 32.7 t ADT: 67,900

IH 35

Good

Over: Skinner Branch

1.50 Mi. S. of Loop 121, Bell, TX

Built 2017 Load: 32.7 t ADT: 146,391

IH 35

Good

Over: MITCHELL BRANCH

0.35 MI N OF LP 121, Bell, TX

Built 2014 Load: 32.7 t ADT: 57,892

IH 35

Good

Over: MITCHELL BRANCH

0.20 MI. S. OF GRAINGE RD, Bell, TX

Built 2017 Load: 32.7 t ADT: 61,254

IH 35

Good

Over: KILLINGSWORTH BRANCH

3.65 MI SW OF FM 2268, Bell, TX

Built 2009 Load: 32.7 t ADT: 62,317
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.