Harris County, TX

4,030 public highway bridges

Harris County Bridge Snapshot

Harris County, Texas contains 4,030 public highway bridges in the FHWA National Bridge Inventory. Roughly 31.2% are rated “Good,” 31.4% “Fair,” 0.4% “Poor,” and 0.4% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in TX are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

4,030
Total Bridges
31.2%
Good
0.4%
Poor
0.4%
Structurally Deficient

Condition Distribution

Good
31.2% (1,259)
Fair
31.4% (1,266)
Poor
0.4% (18)
SD
0.4% (18)

All Bridges (4,030)

IH 45 NB FR

Good

Over: BERRY CREEK

0.15 MI SE OF SH 3/MONROE, Harris, TX

Built 1989 Load: 32.7 t ADT: 27,470

IH 45 HOV RAMP

Good

Over: BERRY CREEK

0.5 MI SE OF SH 3/MONROE, Harris, TX

Built 1996 Load: 32.7 t ADT: 15,600

IH 45 HOV RAMP

Good

Over: BERRY CREEK

0.5 MI SE OF SH 3/MONROE, Harris, TX

Built 1996 Load: 32.7 t ADT: 15,600

IH 45 HOV ML

Good

Over: IH 45 MEDIAN

0.35 MI NW OF FM 1959, Harris, TX

Built 1998 Load: 32.7 t ADT: 16,188

IH 45

Good

Over: HCFCD Ditch A119-13-00

0.5 Miles SE of FM 1959, Harris, TX

Built 2015 Load: 32.7 t ADT: 111,334

IH 45

Good

Over: HCFCD Ditch A119-12-00

0.43 Miles SE of FM 1959, Harris, TX

Built 2015 Load: 32.7 t ADT: 111,334

IH 45

Good

Over: HCFCD Ditch A119-02-00

0.6 Miles SE of FM 2351, Harris, TX

Built 2016 Load: 32.7 t ADT: 111,334

IH 45

Good

Over: STORM SEWER CROSSING

6.35 MI SE OF BW 8, Harris, TX

Built 2016 Load: 32.7 t ADT: 113,652

IH 45 NB

Good

Over: White Oak Bayou

0.1 MI N. of IH 10, Harris, TX

Built 2016 Load: 32.7 t ADT: 125,804

IH 45 NBFR

Good

Over: Clear Creek

IH 45 over Clear Creek, Harris, TX

Built 2020 Load: 32.7 t ADT: 27,400

SENS RD

Good

Over: Union Pacific Railroad

0.02 MI S OF SH 225, Harris, TX

Built 1998 Load: 32.7 t ADT: 5,000

SH 225 WBML & WBFR

Good

Over: HCFCD DRAINAGE DITCH

0.45 MI W OF BW 8, Harris, TX

Built 1983 Load: 32.7 t ADT: 41,934

SH 225 EBML & EBFR

Good

Over: HCFCD DRAINAGE DITCH

0.45 MI W OF BW 8, Harris, TX

Built 1983 Load: 32.7 t ADT: 40,704

IH 10 WBFR

Good

Over: GREENS BAYOU

1.0 MI E OF FEDERAL RD, Harris, TX

Built 1981 Load: 32.7 t ADT: 4,700

IH 10 EBFR

Good

Over: GREENS BAYOU

1.0 MI E OF FEDERAL RD, Harris, TX

Built 1981 Load: 32.7 t ADT: 3,848

IH 10 WB FR

Good

Over: UP RR

0.50 MI W OF BW 8, Harris, TX

Built 1985 Load: 32.7 t ADT: 5,750

IH 10 ML

Good

Over: SAN JACINTO RIVER CANAL

0.20 MI E OF THOMPSON RD, Harris, TX

Built 2002 Load: 32.7 t ADT: 68,302

IH 10 WBFR

Good

Over: HUNTING BAYOU

2.0 MI E OF IH 610, Harris, TX

Built 2012 Load: 32.7 t ADT: 56,100

IH 10 EBFR

Good

Over: HUNTING BAYOU

2.0 MI E OF IH 610, Harris, TX

Built 2012 Load: 32.7 t ADT: 20,390

IH 10 WB

Good

Over: CARPENTERS BAYOU

0.35 MI E OF BW 8, Harris, TX

Built 1985 Load: 32.7 t ADT: 71,140

IH 10 EB

Good

Over: CARPENTERS BAYOU

0.35 MI E OF BW 8, Harris, TX

Built 1985 Load: 32.7 t ADT: 69,576

IH 10 WB FR

Good

Over: CARPENTERS BAYOU

0.35 MI E OF BW 8, Harris, TX

Built 1985 Load: 32.7 t ADT: 5,750

IH 10 WB

Good

Over: UP RR

0.20 MI W OF BW 8, Harris, TX

Built 1985 Load: 32.7 t ADT: 71,140

BROOKVIEW/IH 10 FR

Good

Over: CARPENTERS BAYOU

IH 10 @ BW 8 E (INTERCHG), Harris, TX

Built 1985 Load: 32.7 t ADT: 33,366

IH 10 WBFR

Good

Over: FRESH WATER BAYOU

1.25 MI E OF SHELDON RD, Harris, TX

Built 1982 Load: 32.7 t ADT: 30

IH 10WB to IH 45NB

Good

Over: White Oak Bayou

0.1 MI N of IH 10, Harris, TX

Built 2016 Load: 32.7 t ADT: 18,800

SPUR 330/DECKER DR

Good

Over: GOOSE CREEK

0.30 MI SE OF SH 146, Harris, TX

Built 1979 Load: 32.7 t ADT: 9,290

SPUR 330 WB

Good

Over: Spring Gully

0.4 MI SE OF IH 10, Harris, TX

Built 2004 Load: 32.7 t ADT: 13,390

SPUR 330 EB

Good

Over: Spring Gully

0.4 MI SE OF IH 10, Harris, TX

Built 2004 Load: 32.7 t ADT: 13,390

SPUR 330 EB ML

Good

Over: HCFCD #0107-00-00

3.30 MI SE OF IH 10, Harris, TX

Built 2002 Load: 32.7 t ADT: 21,590

SPUR 330 WB ML

Good

Over: HCFCD #0107-00-00

3.30 MI SE OF IH 10, Harris, TX

Built 2002 Load: 32.7 t ADT: 21,590

SPUR 330 EB FR

Good

Over: HCFCD #0107-00-00

3.30 MI SE OF IH 10, Harris, TX

Built 2002 Load: 32.7 t ADT: 3,822

SPUR 330 WB FR

Good

Over: HCFCD #0107-00-00

3.30 MI SE OF IH 10, Harris, TX

Built 2002 Load: 32.7 t ADT: 5,676

SH 288 NB

Good

Over: SIMS BAYOU

3.50 MI S OF IH610, Harris, TX

Built 1978 Load: 32.7 t ADT: 59,850

SH 288 SB ML

Good

Over: CLEAR CREEK

0.8 MI S OF BW 8, Harris, TX

Built 1978 Load: 32.7 t ADT: 54,353

SH 288 NBML

Good

Over: CLEAR CREEK

0.8 MI S OF BW 8, Harris, TX

Built 1978 Load: 32.7 t ADT: 59,850

SH 288 NBFR

Good

Over: CLEAR CREEK

0.80 MI S OF BW 8, Harris, TX

Built 2006 Load: 32.7 t ADT: 7,180

SH 288 SBFR

Good

Over: CLEAR CREEK

0.80 MI S OF BW 8, Harris, TX

Built 2006 Load: 32.7 t ADT: 19,100

SH 288 NB Ramp

Good

Over: SH 288 NB

At SH 288 NB to IH 610EB, Harris, TX

Built 2020 Load: 32.7 t ADT: 14,751

SH 288 Toll Lanes

Good

Over: Clear Creek

0.79 Mi S of SamHoustonTL, Harris, TX

Built 2020 Load: 32.7 t ADT: 42,063

SH 288 SBTL

Good

Over: Brays Bayou

2.2 MI N of IH 610, Harris, TX

Built 2020 Load: 32.7 t ADT: 16,375

SH288 NBTL

Good

Over: Brays Bayou

2.2 MI N of IH 610, Harris, TX

Built 2020 Load: 32.7 t ADT: 7,500

SH 249 SBFR

Good

Over: HCFCD DITCH M124-00-00

0.60 MI N OF FM 2920, Harris, TX

Built 2007 Load: 32.7 t ADT: 14,650

SH 249 NBFR

Good

Over: HCFCD DITCH M124-00-00

0.60 MI N OF FM 2920, Harris, TX

Built 2007 Load: 32.7 t ADT: 11,820

SH 249 ML

Good

Over: HCFCD DITCH M124-00-00

0.60 MI N OF FM 2920, Harris, TX

Built 2007 Load: 32.7 t ADT: 17,105

SH 249

Good

Over: HCFCD DITCH M125-00-00

1.15 MI S OF FM 2920, Harris, TX

Built 2006 Load: 32.7 t ADT: 22,372

SH 249 SB

Good

Over: CYPRESS CREEK

2.20 MI NW OF FM 1960, Harris, TX

Built 1997 Load: 32.7 t ADT: 58,334

SH 249 NB

Good

Over: CYPRESS CREEK

2.20 MI NW OF FM 1960, Harris, TX

Built 1997 Load: 32.7 t ADT: 58,334

SH 249 NB FR

Good

Over: CYPRESS CREEK

2.2 MI NW OF FM 1960, Harris, TX

Built 1995 Load: 32.7 t ADT: 17,840

SH 249 NBFR

Good

Over: WILLOW CREEK

2.10 MI S OF FM 2920, Harris, TX

Built 2007 Load: 32.7 t ADT: 19,832

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial