Harris County, TX

4,030 public highway bridges

Harris County Bridge Snapshot

Harris County, Texas contains 4,030 public highway bridges in the FHWA National Bridge Inventory. Roughly 31.2% are rated “Good,” 31.4% “Fair,” 0.4% “Poor,” and 0.4% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in TX are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

4,030
Total Bridges
31.2%
Good
0.4%
Poor
0.4%
Structurally Deficient

Condition Distribution

Good
31.2% (1,259)
Fair
31.4% (1,266)
Poor
0.4% (18)
SD
0.4% (18)

All Bridges (4,030)

BW 8 EBML

Good

Over: GREENS BAYOU

.5 MI E OF ALDINE W FIELD, Harris, TX

Built 1989 Load: 32.7 t ADT: 55,172

BW 8 WBFR

Good

Over: Drainage Ditch

0.5 Mi E. of Imperial Val, Harris, TX

Built 2012 Load: 32.7 t ADT: 21,271

BW 8 EBFR

Good

Over: HCFCD Ditch

0.5 Mi E of Imperial Vall, Harris, TX

Built 2014 Load: 32.7 t ADT: 17,906

BW 8 E

Good

Over: GARNERS BAYOU

3.77 MI E OF US 59, Harris, TX

Built 2010 Load: 32.7 t ADT: 63,500

BW 8

Good

Over: ALDINE WESTFIELD

1.5 MI W OF JFK BLVD, Harris, TX

Built 2017 Load: 32.7 t ADT: 110,344

BW 8 SB

Good

Over: LITTLE VINCE BAYOU

3.0 MI S OF SH 225, Harris, TX

Built 1995 Load: 32.7 t ADT: 15,000

BW 8 NB

Good

Over: LITTLE VINCE BAYOU

3.0 MI S OF SH 225, Harris, TX

Built 1995 Load: 32.7 t ADT: 15,000

BW 8 SB

Good

Over: ARMAND RELIEF

5.0 MI NE OF IH 45 (S), Harris, TX

Built 1995 Load: 32.7 t ADT: 15,000

BW 8 NB

Good

Over: ARMAND RELIEF

5.0 MI NE OF IH 45 (S), Harris, TX

Built 1995 Load: 32.7 t ADT: 15,000

BW 8 EBFR

Good

Over: HCFCD DITCH A-120-00-00

3.25 MI E OF SH 35, Harris, TX

Built 1993 Load: 32.7 t ADT: 13,855

BW 8 WBFR

Good

Over: HCFCD DITCH A-125-00-00

0.50 MI E OF SH 35, Harris, TX

Built 1993 Load: 32.7 t ADT: 13,143

BW 8 EBFR

Good

Over: HCFCD DITCH A-125-00-00

0.50 MI E OF SH 35, Harris, TX

Built 1993 Load: 32.7 t ADT: 14,131

BW 8 EBFR

Good

Over: HCFCD DITCH

3.0 MI SE OF US 90A, Harris, TX

Built 1995 Load: 32.7 t ADT: 21,883

BW 8 WBFR

Good

Over: HCFCD DITCH C147-00-00

3.0 MI SE OF US 90A, Harris, TX

Built 1995 Load: 32.7 t ADT: 16,401

BW 8 EBFR

Good

Over: HCFCD DITCH

4.3 MI SE OF US 90A, Harris, TX

Built 1995 Load: 32.7 t ADT: 16,631

BW 8 WB FR

Good

Over: SIMS BAYOU

0.30 MI SE OF US 90A, Harris, TX

Built 1998 Load: 32.7 t ADT: 12,290

BW 8 EB FR

Good

Over: SIMS BAYOU

0.35 MI SE OF US 90A, Harris, TX

Built 1998 Load: 32.7 t ADT: 21,883

BW 8

Good

Over: SIMS BAYOU

0.3 MI SE OF US 90A, Harris, TX

Built 2001 Load: 32.7 t ADT: 12,290

BW 8 SB ENT RAMP

Good

Over: SIMS BAYOU

0.35 MI SE OF US 90A, Harris, TX

Built 2001 Load: 32.7 t ADT: 3,000

BW 8 ML

Good

Over: HCFCD DITCH

4.30 MI SE OF US 90A, Harris, TX

Built 1997 Load: 32.7 t ADT: 9,465

BW 8 ML

Good

Over: HCFCD DITCH A-125-00-00

0.50 MI E OF SH 35, Harris, TX

Built 1997 Load: 32.7 t ADT: 11,950

BW 8 ML

Good

Over: HCFCD DITCH A-120-00-00

3.25 MI E OF SH 35, Harris, TX

Built 1997 Load: 32.7 t ADT: 8,805

BW 8 KIRBY RAMP

Good

Over: NATURAL GROUND

INTER OF SH 288 & BW 8, Harris, TX

Built 2019 Load: 32.7 t ADT: 8,000

FM 270

Good

Over: CLEAR CREEK

1.00 MI SE OF NASA RD 1, Harris, TX

Built 1981 Load: 32.7 t ADT: 30,217

SH 99 SBFR

Good

Over: Mason Creek

0.90 MI N OF IH 10, Harris, TX

Built 1990 Load: 32.7 t ADT: 4,300

SH 99 SB ENT. RAMP

Good

Over: LANGHAM CREEK

5.56 MI S OF US 290, Harris, TX

Built 2013 Load: 32.7 t ADT: 19,100

SH 99 NB EXIT RAMP

Good

Over: LANGHAM CREEK

5.56 MI S OF US 290, Harris, TX

Built 2013 Load: 32.7 t ADT: 19,100

SH 99 NB

Good

Over: LANGHAM CREEK

5.56 MI S OF US 290, Harris, TX

Built 2013 Load: 32.7 t ADT: 19,100

SH 99 SB

Good

Over: LANGHAM CREEK

5.56 MI S OF US 290, Harris, TX

Built 2013 Load: 32.7 t ADT: 19,100

SH 99 NB

Good

Over: CYPRESS CREEK

1.98 MI S OF US 290, Harris, TX

Built 2013 Load: 32.7 t ADT: 19,100

SH 99 NBML

Good

Over: MASON CREEK

0.9 N OF IH 10, Harris, TX

Built 2014 Load: 32.7 t ADT: 15,778

SH 99 SBML

Good

Over: MASON CREEK

0.9 MI N OF IH 10, Harris, TX

Built 2014 Load: 32.7 t ADT: 14,653

SH 99 SB RAMP D

Good

Over: MAYDE CREEK

3.4 MI N OF IH 10, Harris, TX

Built 2014 Load: 32.7 t ADT: 9,000

SH 99 NB RAMP C

Good

Over: MAYDE CREEK

3.4 MI N OF IH 10, Harris, TX

Built 2014 Load: 32.7 t ADT: 9,000

SH 99 NB

Good

Over: BEAR CREEK

8.85 MI S OF US 290, Harris, TX

Built 2013 Load: 32.7 t ADT: 19,100

SH 99 SB

Good

Over: BEAR CREEK

8.85 MI S OF US 290, Harris, TX

Built 2013 Load: 32.7 t ADT: 19,100

SH 99 NB EXIT RAMP

Good

Over: BEAR CREEK

8.85 MI S OF US 290, Harris, TX

Built 2013 Load: 32.7 t ADT: 19,100

SH 99 SB ENT. RAMP

Good

Over: Bear Creek

8.85 MI S OF US 290, Harris, TX

Built 2013 Load: 32.7 t ADT: 19,100

SH 99

Good

Over: DITCH

2.7 MI N OF IH 10, Harris, TX

Built 2014 Load: 32.7 t ADT: 22,300

SH 99 SB

Good

Over: DITCH K150

2.82 MI S OF US 290, Harris, TX

Built 2013 Load: 32.7 t ADT: 19,100

SH 99 NB

Good

Over: DITCH K150

2.82 MI S OF US 290, Harris, TX

Built 2013 Load: 32.7 t ADT: 19,100

SH 99 EB ENTR RAMP

Good

Over: NATURAL GROUND

0.10 MI W OF IH 45, Harris, TX

Built 2016 Load: 32.7 t ADT: 500

SH 99 WB EXIT RAMP

Good

Over: NATURAL GROUND

0.10 MI W OF IH 45, Harris, TX

Built 2016 Load: 32.7 t ADT: 500

SH 99 EB FRTG RD

Good

Over: ENERGY DRIVE

0.25 MI W OF IH 45, Harris, TX

Built 2016 Load: 32.7 t ADT: 1,000

SH 99 EB

Good

Over: ENERGY DRIVE

0.25 MI W IOF IH 45, Harris, TX

Built 2016 Load: 32.7 t ADT: 3,000

SH 99 WB

Good

Over: ENERGY DRIVE

0.25 MI W OF IH 45, Harris, TX

Built 2016 Load: 32.7 t ADT: 3,000

SH 99 WB FRTG RD

Good

Over: ENERGY DRIVE

0.25 MI W OF IH 45, Harris, TX

Built 2016 Load: 32.7 t ADT: 1,000

SH 99 NB

Good

Over: HCFCD DITCH L112-02-00

0.85 MI W OF MUESCHKE RD, Harris, TX

Built 2015 Load: 32.7 t ADT: 4,000

SH 99 EB

Good

Over: WILLOW CREEK

1.3 MI E OF MUESCHKE RD, Harris, TX

Built 2015 Load: 32.7 t ADT: 4,000

SH 99 WB

Good

Over: WILLOW CREEK

1.3 MI E OF MUESCHKE RD, Harris, TX

Built 2015 Load: 32.7 t ADT: 4,000

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial