Jeff Davis County, TX

134 public highway bridges

Jeff Davis County Bridge Snapshot

Jeff Davis County, Texas contains 134 public highway bridges in the FHWA National Bridge Inventory. Roughly 60.4% are rated “Good,” 37.3% “Fair,” 0% “Poor,” and 0% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in TX are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

134
Total Bridges
60.4%
Good
0%
Poor
0%
Structurally Deficient

Condition Distribution

Good
60.4% (81)
Fair
37.3% (50)
Poor
0% (0)
SD
0% (0)

All Bridges (134)

SH 17

Good

Over: DRAW

10.3 MI S OF REEVES C/L, Jeff Davis, TX

Built 1940 Load: 23.6 t ADT: 1,183

SH 17

Good

Over: DRAW

12.4 MI S OF REEVES C/L, Jeff Davis, TX

Built 1940 Load: 23.6 t ADT: 1,183

SH 17

Good

Over: DRAW

12.8 MI S OF REEVES C/L, Jeff Davis, TX

Built 1940 Load: 23.6 t ADT: 1,183

SH 17

Good

Over: DRAW

13.7 MI S OF REEVES C/L, Jeff Davis, TX

Built 1940 Load: 23.6 t ADT: 1,183

SH 17

Good

Over: DRAW

0.13 MI S OF REEVES C/L, Jeff Davis, TX

Built 1940 Load: 23.6 t ADT: 713

SH 17

Good

Over: DRAW

2.22 MI S OF REEVES C/L, Jeff Davis, TX

Built 1940 Load: 23.6 t ADT: 713

SH 17

Good

Over: DRAW

5.80 MI S OF REEVES C/L, Jeff Davis, TX

Built 1940 Load: 23.6 t ADT: 1,183

SH 118

Good

Over: DRAW

2.60 MI W OF SH 17, Jeff Davis, TX

Built 1975 Load: 23.6 t ADT: 891

SH 118

Good

Over: DRAW

4.40 MI W OF SH 17, Jeff Davis, TX

Built 1975 Load: 23.6 t ADT: 565

SH 118

Good

Over: DRAW

5.00 MI W OF SH 17, Jeff Davis, TX

Built 1975 Load: 23.6 t ADT: 215

SH 166

Good

Over: MEDLEY DRAW

3.50 MI E OF RM 505, Jeff Davis, TX

Built 1947 Load: 23.6 t ADT: 150

FM 3078

Good

Over: DRAW

5.15 MI W OF SH 17, Jeff Davis, TX

Built 1933 Load: 23.6 t ADT: 100

SH 118

Good

Over: RUNNING WATER DRAW

0.76 MI S CULBERSON C/L, Jeff Davis, TX

Built 1942 Load: 23.6 t ADT: 100

SH 118

Good

Over: PATTERSON DRAW

2.34 MI S CULBERSON C/L, Jeff Davis, TX

Built 1942 Load: 23.6 t ADT: 100

SH 118

Good

Over: JONES CANYON CREEK

7.50 MI NW OF SH 17, Jeff Davis, TX

Built 1975 Load: 29.9 t ADT: 215

SH 17

Good

Over: FRAZIER CANYON

10.3 MI NE OF SH 118, Jeff Davis, TX

Built 1994 Load: 32.7 t ADT: 1,183

SH 17

Good

Over: LIMPIA CREEK

9.5 MI NE OF SH 118, Jeff Davis, TX

Built 1994 Load: 32.7 t ADT: 1,183

SH 17

Good

Over: LIMPIA CREEK

8.3 MI NE OF SH 118, Jeff Davis, TX

Built 1994 Load: 32.7 t ADT: 1,183

SH 17

Good

Over: SHEEP PEN CREEK

2.8 MI NE OF SH 118, Jeff Davis, TX

Built 1990 Load: 32.7 t ADT: 715

SH 17

Good

Over: LIMPIA CREEK

6.8 MI NE OF SH 118, Jeff Davis, TX

Built 1994 Load: 32.7 t ADT: 1,183

SH 17

Good

Over: LIMPIA CREEK

7.2 MI NE OF SH 118, Jeff Davis, TX

Built 1994 Load: 32.7 t ADT: 1,183

SH 17

Good

Over: LIMPIA CREEK

7.6 MI NE OF SH 118, Jeff Davis, TX

Built 1994 Load: 32.7 t ADT: 1,183

SH 17

Good

Over: LIMPIA CREEK

7.8 MI NE OF SH 118, Jeff Davis, TX

Built 1994 Load: 32.7 t ADT: 1,183

SH 17

Good

Over: LIMPIA CREEK

8.0 MI NE OF SH 118, Jeff Davis, TX

Built 1994 Load: 32.7 t ADT: 1,183

SH 166

Good

Over: DRAW

11.0 MI E OF RM 505, Jeff Davis, TX

Built 2002 Load: 32.7 t ADT: 541

SH 166

Good

Over: DRAW

11.5 MI E OF RM 505, Jeff Davis, TX

Built 2002 Load: 32.7 t ADT: 541

SH 166

Good

Over: ALAMITO CREEK

10.0 MI W OF JCT SH 17, Jeff Davis, TX

Built 2001 Load: 32.7 t ADT: 541

SH 166

Good

Over: CIENEGA CREEK

7.2 MI W OF JCT SH 17, Jeff Davis, TX

Built 2001 Load: 32.7 t ADT: 541

SH 166

Good

Over: WEST BLUE MOUNTAIN CREEK

4.5 MI W OF SH 17, Jeff Davis, TX

Built 2001 Load: 32.7 t ADT: 541

SH 166

Good

Over: LONE TREE CREEK

3.8 MI W OF SH 17, Jeff Davis, TX

Built 2001 Load: 32.7 t ADT: 541

SH 166

Good

Over: E BLUE MOUNTAIN SLOUGH

1.0 MI W OF SH 17, Jeff Davis, TX

Built 2001 Load: 32.7 t ADT: 541

SH 166

Good

Over: EAST BLUE MOUNTAIN CREEK

0.8 MI W OF SH 17, Jeff Davis, TX

Built 2001 Load: 32.7 t ADT: 541

FM 3078

Good

Over: CHERRY DRAW RELIEF

9.05 MI W OF SH 17, Jeff Davis, TX

Built 2008 Load: 32.7 t ADT: 100

FM 3078

Good

Over: CHERRY DRAW

8.90 MI W OF SH 17, Jeff Davis, TX

Built 2008 Load: 32.7 t ADT: 100

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial