Houston County, AL

204 public highway bridges

Houston County Bridge Snapshot

Houston County, Alabama contains 204 public highway bridges in the FHWA National Bridge Inventory. Roughly 45.6% are rated “Good,” 52.5% “Fair,” 0.5% “Poor,” and 0.5% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in AL are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

204
Total Bridges
45.6%
Good
0.5%
Poor
0.5%
Structurally Deficient

Condition Distribution

Good
45.6% (93)
Fair
52.5% (107)
Poor
0.5% (1)
SD
0.5% (1)

All Bridges (204)

US 431 MP 21.311

Fair

Over: BURDESHAW MILLS CREEK

2.4 MI. N. JCT. SR 210, Houston, AL

Built 1962 Load: 71.5 t ADT: 16,600

US 431 MP 19.543

Fair

Over: OMUSEE CREEK

1.7 MI. N. JCT. SR 210, Houston, AL

Built 1962 Load: 88.9 t ADT: 16,760

US 431 MP 20.692

Fair

Over: CEDAR CREEK

2.9 MI. N. JCT. SR 210, Houston, AL

Built 1962 Load: 88.9 t ADT: 16,600

ENNIS ROAD

Fair

Over: BURKETT BRANCH

1.1 MI. N. JCT. SR 52, Houston, AL

Built 1972 Load: 88.9 t ADT: 1,450

US 84 MP 211.263

Fair

Over: DITCH

1.2 MI. E. U.S. 231, Houston, AL

Built 1974 Load: 88.9 t ADT: 17,300

IRIS RD

Fair

Over: CYPRESS CREEK

US 231 TO CO RD 19, Houston, AL

Built 1978 Load: 88.9 t ADT: 240

US 84 MP 219.830

Fair

Over: BRANCH

0.2 MI.E.HOUSTON CO.33, Houston, AL

Built 1988 Load: 88.9 t ADT: 16,530

COUNTY RD 32

Fair

Over: PANTHER CREEK

HILLTOP RD TO US 84, Houston, AL

Built 1988 Load: 88.9 t ADT: 310

CO.RD.95 MP 17.427

Fair

Over: BRANCH

.5 MI.N.FARLEY PLANT, Houston, AL

Built 1958 Load: 88.9 t ADT: 700

WESTGATE PKWY.

Fair

Over: STREAM

.4 MI. W. US 431, Houston, AL

Built 1993 Load: 88.9 t ADT: 6,480

CO RD NO 22

Good

Over: HURRICANE CREEK

HENRY CO LINE TO AL52, Houston, AL

Built 1950 Load: 20.9 t ADT: 675

HICKORY GROVE RD

Good

Over: GUM SLOUGH BRANCH

AL 53 TO CO RD 81, Houston, AL

Built 1968 Load: 21.2 t ADT: 295

CO RD 33

Good

Over: CEDAR CREEK

ASHFORD TO COUNTY ROAD 75, Houston, AL

Built 1950 Load: 22.1 t ADT: 1,675

PREVATT RD

Good

Over: GOLF CREEK

CIRCLE TO CO RD 19, Houston, AL

Built 1967 Load: 22.1 t ADT: 810

US 84 MP 227.476

Good

Over: DRAINAGE AREA

0.21KM E.OF CO.RD.81, Houston, AL

Built 1998 Load: 22.3 t ADT: 6,920

CO RD 75

Good

Over: MEADOWS BRANCH

CO RD 33 TO CO RD 81, Houston, AL

Built 1966 Load: 23.5 t ADT: 383

HICKORY GROVE RD

Good

Over: GUY BRANCH

AL 53 TO CO RD 81, Houston, AL

Built 1966 Load: 23.7 t ADT: 320

SR 53 MP 1.627

Good

Over: COWARTS CREEK

1.6 MI. N. FLA. LINE, Houston, AL

Built 1985 Load: 25.1 t ADT: 1,980

PEACOCK ROAD

Good

Over: GOLF CREEK

NORTH OF OLD WEBB RD., Houston, AL

Built 1960 Load: 26.4 t ADT: 202

LAMP BRO. RD

Good

Over: JACKSON CREEK

CO RD 33 TO ALA 95, Houston, AL

Built 1948 Load: 26.5 t ADT: 10

SR 52 MP 80.875

Good

Over: OMUSSEE CREEK

.4 mi.e. co. rd. 95 south, Houston, AL

Built 1980 Load: 26.7 t ADT: 5,280

SR 109 MP 8.576

Good

Over: HARKIN BRANCH

1.3 MI. S. US 231, Houston, AL

Built 1983 Load: 27.6 t ADT: 4,120

CO.RD.95 MP 13.949

Good

Over: SMITH BRANCH

4.5 MI.N. US 84, Houston, AL

Built 1948 Load: 27.9 t ADT: 420

CO RD 33

Good

Over: MILL CREEK

US 84 TO CO RD 4, Houston, AL

Built 1960 Load: 27.9 t ADT: 415

SR 52 MP 58.126

Good

Over: PINHOOK CREEK

.5 MI.E.HOUSTON 59, Houston, AL

Built 2000 Load: 28.2 t ADT: 9,150

HICKORY GROVE RD

Good

Over: COWARTS CREEK

AL 53 TO CO RD 81, Houston, AL

Built 1971 Load: 28.9 t ADT: 340

HICKORY GROVE RD

Good

Over: COWARTS CREEK

AL 53 TO CO RD 81, Houston, AL

Built 1971 Load: 28.9 t ADT: 365

CO RD 77

Good

Over: GUM SLOUGH

US 84 TO COTTONWOOD, Houston, AL

Built 1958 Load: 29.8 t ADT: 260

FORTNER SREET

Good

Over: BEAVER CREEK

CIRCLE TO PILGRAM REST CH, Houston, AL

Built 2010 Load: 30.4 t ADT: 1,150

CO RD 55

Good

Over: BOGGY CREEK

COTTONWOOD TO HENRY CO, Houston, AL

Built 1986 Load: 30.8 t ADT: 1,220

CO RD 63

Good

Over: CEDAR SPRING CREEK

CO RD 22 TO CO RD 33, Houston, AL

Built 1995 Load: 30.8 t ADT: 360

CREEK CHURCH RD

Good

Over: ROCKEY CREEK

US 84 TO COTTONWOOD, Houston, AL

Built 1998 Load: 30.8 t ADT: 100

HARVEY HICKS RD

Good

Over: ROCKY CREEK

CO RD 69 TO CO RD 77, Houston, AL

Built 2000 Load: 30.8 t ADT: 90

FLYNN ROAD

Good

Over: L. CHOCTAWHATCHEE RIVER

0.7 MI. E. NAPIER F. ROAD, Houston, AL

Built 1964 Load: 31.3 t ADT: 4,095

SO CO RD 33

Good

Over: DOUBLE BRIDGE CREEK

STATE RD 53 TO D.HODGE RD, Houston, AL

Built 2000 Load: 31.5 t ADT: 300

SR 52 MP 76.216

Good

Over: CEDAR SPRINGS CREEK

1.8 MI.E.HOUSTON #55, Houston, AL

Built 1980 Load: 31.6 t ADT: 4,390

SR 109 MP 5.820

Good

Over: BIG CREEK

4.9 MI. S. U.S. 231, Houston, AL

Built 1988 Load: 31.7 t ADT: 3,930

SR 52 MP 62.025

Good

Over: FOLKES BRANCH

1.2 MI. E OF SR 210, Houston, AL

Built 1927 Load: 32.0 t ADT: 4,180

COUNTY ROAD 203

Good

Over: LIMESTONE CREEK

DOTHAN TO FLA LINE, Houston, AL

Built 1991 Load: 32.7 t ADT: 810

GILLEY MILL RD

Good

Over: OMUSSEE CREEK

CO RD 57 TO CO RD 22, Houston, AL

Built 2003 Load: 33.0 t ADT: 230

LUCY GRADE RD

Good

Over: WEBB CREEK

WILSON MILL TO STATE PARK, Houston, AL

Built 2002 Load: 33.0 t ADT: 333

EDGAR SMITH RD

Good

Over: COWARTS CREEK

CO RD 20 TO CO RD 34, Houston, AL

Built 2002 Load: 33.0 t ADT: 245

BROOKSIDE DRIVE

Good

Over: QUAIL CREEK

CITY OF DOTHAN, Houston, AL

Built 2019 Load: 34.1 t ADT: 700

SR 52 MP 60.593

Good

Over: BEAVER CREEK

.2 MI. W. SR 210, Houston, AL

Built 1983 Load: 34.9 t ADT: 13,050

Denton rd

Good

Over: Rock creek

Denton rd, Houston, AL

Built 2017 Load: 37.6 t ADT: 10,457

CO RD 75

Good

Over: TOLAR BRANCH

CO RD 33 TO CO RD 81, Houston, AL

Built 1967 Load: 39.6 t ADT: 515

SUNSET DRIVE

Good

Over: STREAM

DOTHAN, Houston, AL

Built 2005 Load: 40.0 t ADT: 590

JOHN D ODOM ROAD

Good

Over: LITTLE CHOCTAWHATCHEE RI

1.2 MI N JCT US 84, Houston, AL

Built 2004 Load: 42.0 t ADT: 3,725

EAST COOK ROAD

Good

Over: CEDAR CREEK

US84 TO COUNTYRD.75, Houston, AL

Built 2009 Load: 42.5 t ADT: 36

PILGRIM CH. RD.

Good

Over: BRYANS CREEK

FLA. LINE TO CO. RD. 8, Houston, AL

Built 2009 Load: 42.6 t ADT: 9

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial