Baker County, FL

93 public highway bridges

Baker County Bridge Snapshot

Baker County, Florida contains 93 public highway bridges in the FHWA National Bridge Inventory. Roughly 20.4% are rated “Good,” 59.1% “Fair,” 8.6% “Poor,” and 8.6% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in FL are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

93
Total Bridges
20.4%
Good
8.6%
Poor
8.6%
Structurally Deficient

Condition Distribution

Good
20.4% (19)
Fair
59.1% (55)
Poor
8.6% (8)
SD
8.6% (8)

All Bridges (93)

US-90 (SR-10)

Fair

Over: CSXRR

0.6 MI. E. OF SANDERSON, Baker, FL

Built 1936 Load: 37.3 t ADT: 6,000

I-10 WB SR-8

Fair

Over: CSXRR REMOVED

I-10/CSXRR REMOVED, Baker, FL

Built 1960 Load: 37.6 t ADT: 20,000

I-10 EB SR-8

Fair

Over: CSXRR REMOVED

I-10/CSXRR REMOVED, Baker, FL

Built 1960 Load: 37.6 t ADT: 20,000

Forest Road 6

Fair

Over: Lake Holes Branch

John Bethea State Forest, Baker, FL

Built 2018 Load: 37.6 t ADT: 11

CR 127

Fair

Over: CALKINS CREEK

6.5 MI NORTH US 90, Baker, FL

Built 1955 Load: 40.4 t ADT: 2,200

I-10 SR-8

Fair

Over: HELLS BAY

2.5 MI. E. OF CR-229, Baker, FL

Built 1961 Load: 41.5 t ADT: 27,500

MID PRONG ST MARYS

Fair

Over: MID PRONG ST MARYS RV

NATIONAL FOREST, Baker, FL

Built 1979 Load: 41.8 t ADT: 20

CR 250

Fair

Over: OSCEOLA CREEK

2.9 MI WEST OF CR 229, Baker, FL

Built 1955 Load: 41.9 t ADT: 200

SR-121

Fair

Over: S.PRONG ST.MARY'S R. O/F

1.2 MI. N. OF CR-23C, Baker, FL

Built 1962 Load: 47.1 t ADT: 2,967

SR-121

Fair

Over: S. PRONG ST.MARY'S RIVER

1.3 MI. N. OF CR-23C, Baker, FL

Built 1962 Load: 47.1 t ADT: 2,967

I-10 (SR-8)

Fair

Over: PRONG OF ST.MARY'S RIVER

1.2 MI. W OF SR-121, Baker, FL

Built 1961 Load: 50.6 t ADT: 33,000

MOCCASIN CREEK CIR

Fair

Over: MOCCASIN CREEK

0.1 MI E OF CR 127, Baker, FL

Built 2000 Load: 52.3 t ADT: 51

235

Fair

Over: NO DATA ENTERED

NO DATA ENTERED, Baker, FL

Built 1999 Load: 56.1 t ADT: 20

CR 229 & I-10 RAMP

Fair

Over: TWIN OAKS CREEK

0.16 MI SOUTH OF I-10, Baker, FL

Built 1962 Load: 58.6 t ADT: 1,900

SR-121

Fair

Over: ST.MARY'S CRK. TRIBUTARY

3.7 MI. S. OF I-10, Baker, FL

Built 1940 Load: 61.4 t ADT: 8,800

CREWS ROAD

Fair

Over: DAUGHERTY BRANCH

800 FT. EAST OF CR 125, Baker, FL

Built 1997 Load: 99.9 t ADT: 251

L.E. HARVEY ROAD

Good

Over: OAK BRANCH

0.9 MI SOUTH OF CR 130, Baker, FL

Built 2002 Load: 24.0 t ADT: 101

SR-121

Good

Over: OAK BRANCH

3.3 MI. N. OF UNION CO., Baker, FL

Built 1940 Load: 27.1 t ADT: 8,800

CR 23A

Good

Over: BARBER BAY SLOUGH

1.1 MI NORTH OF US 90, Baker, FL

Built 1999 Load: 28.1 t ADT: 1,851

CR 125

Good

Over: S PRONG ST MARYS RIV

1.5 MI NORTH OF CR 121, Baker, FL

Built 1949 Load: 29.4 t ADT: 650

I-10 EB SR-8

Good

Over: CSX RR

0.1 MI. W OF US-90, Baker, FL

Built 1962 Load: 29.5 t ADT: 12,622

CR 127

Good

Over: MID-PRONG ST MARYS RIVER

4.0 MI NORTH OF CR 125, Baker, FL

Built 1992 Load: 33.3 t ADT: 2,200

CR 127

Good

Over: CEDAR CREEK

3 MI. NORTH OF US 90, Baker, FL

Built 2014 Load: 33.3 t ADT: 2,200

CR 23A

Good

Over: BARBER BAY SLOUGH

2.9 MI NORTH OF US 90, Baker, FL

Built 1999 Load: 33.6 t ADT: 2,881

SR-121

Good

Over: HOSPITAL CREEK

2.4 MI. S. OF I-10, Baker, FL

Built 1952 Load: 34.5 t ADT: 8,800

ROAD 4

Good

Over: UNKNOWN CREEK

0.3 MILES N OF RD 26, Baker, FL

Built 2007 Load: 34.7 t ADT: 1

I-10 WB SR-8

Good

Over: CSX RR

0.1 MI. W. OF US-90, Baker, FL

Built 1962 Load: 34.7 t ADT: 12,622

CR 125

Good

Over: ST. MARY'S RIVER S PRONG

0.5 MILE S OF I-10, Baker, FL

Built 2012 Load: 38.2 t ADT: 550

CR 250

Good

Over: BRUSHY BRANCH

4.8 MI WEST OF CR 229, Baker, FL

Built 1955 Load: 39.5 t ADT: 200

SR-121

Good

Over: TURKEY CREEK

0.7 MI. N. OF I-10, Baker, FL

Built 1970 Load: 39.6 t ADT: 11,100

US-90 (SR-10)

Good

Over: LITTLE ST. MARY RIVER

1.3 MI. W. OF SR-121, Baker, FL

Built 1998 Load: 44.5 t ADT: 13,000

CR 127 EXT

Good

Over: MOCCASIN CREEK

3.6 MI NORTH OF SR 2, Baker, FL

Built 2005 Load: 46.2 t ADT: 21

I-10 (SR-8)

Good

Over: CYPRESS BRANCH

0.5MI. W OF EB REST AREA, Baker, FL

Built 1962 Load: 48.6 t ADT: 25,243

CR 229

Good

Over: S. PRONG ST. MARY'S RIVE

2.6 MI SOUTH OF I-10, Baker, FL

Built 2013 Load: 59.1 t ADT: 1,600

CREWS ROAD

Good

Over: BLUFF CREEK

1.4 MI S OF CR 127, Baker, FL

Built 1999 Load: 99.9 t ADT: 101

NO DATA ENTERED

Poor

Over: LITTLE SUWANEE CREEK

NO DATA ENTERED, Baker, FL

Built 1990 Load: 2.6 t ADT: 50

CLET HARVEY ROAD

Poor

Over: MUD LAKE SWAMP

2.6 MI EAST OF CR 229, Baker, FL

Built 1941 Load: 8.9 t ADT: 206

FSR 200

Poor

Over: UNNAMED STREAM

1.75 MI WEST OF STATE 250, Baker, FL

Built 1976 Load: 12.6 t ADT: 50

CROSS STREET

Poor

Over: CROSS BRANCH

2.2 MI EAST OF CR 127, Baker, FL

Built 1941 Load: 14.3 t ADT: 21

RICHARDSON RD

Poor

Over: S PRONG ST MARYS

0.75MI SOUTH OF CR 130, Baker, FL

Built 1960 Load: 16.0 t ADT: 201

CR 229

Poor

Over: CEDAR CREEK

2.2 MI NORTH US 90, Baker, FL

Built 1948 Load: 23.9 t ADT: 1,500

CR 125

Poor

Over: DAUGHERTY BRANCH

1.2 MI SOUTH OF CR 127, Baker, FL

Built 1951 Load: 34.9 t ADT: 6,600

CR 120

Structurally Deficient

Over: N PRONG ST MARYS RIVER

1.4 MI EAST OF CR 127, Baker, FL

Built 1970 ADT: 151

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial