Indian River County, FL

120 public highway bridges

Indian River County Bridge Snapshot

Indian River County, Florida contains 120 public highway bridges in the FHWA National Bridge Inventory. Roughly 69.2% are rated “Good,” 23.3% “Fair,” 1.7% “Poor,” and 1.7% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in FL are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

120
Total Bridges
69.2%
Good
1.7%
Poor
1.7%
Structurally Deficient

Condition Distribution

Good
69.2% (83)
Fair
23.3% (28)
Poor
1.7% (2)
SD
1.7% (2)

All Bridges (120)

49th St Lindsey Rd

Good

Over: Lateral A Canal

At CR-615 (66th Ave), Indian River, FL

Built 2014 Load: 33.0 t ADT: 101

River Drive

Good

Over: Rio Mar Bay

100Ft. South of Bay Drive, Indian River, FL

Built 2010 Load: 33.3 t ADT: 600

CR-611 43RD AVE.

Good

Over: MAIN RELIEF CANAL

250ft North of SR-60, Indian River, FL

Built 1995 Load: 33.9 t ADT: 10,585

56th Place North

Good

Over: North Relief Canal

56th Place North, Indian River, FL

Built 2009 Load: 33.9 t

COUNTY RD 507

Good

Over: FELLSMERE CANAL

4.2MI N OF CR-512, Indian River, FL

Built 1975 Load: 34.0 t ADT: 2,059

SR-60 WB

Good

Over: C-52 Canal

2Mi West of CR-512, Indian River, FL

Built 2007 Load: 35.4 t ADT: 4,088

SR-60 EB

Good

Over: C-52 Canal

2Mi. West of CR-512, Indian River, FL

Built 2004 Load: 35.4 t ADT: 4,088

27TH STREET

Good

Over: LATERAL E DRAIN CANAL

0.2 MILE WEST OF US-1, Indian River, FL

Built 1990 Load: 35.9 t ADT: 3,025

VETERANS WALK

Good

Over: RIOMAR BAY

INSIDE RIVERSIDE PARK, Indian River, FL

Built 2023 Load: 35.9 t ADT: 10

57th Street

Good

Over: Lateral A Canal

At CR-615 (66th Ave.), Indian River, FL

Built 2011 Load: 36.3 t ADT: 1,000

16th St/College Ln

Good

Over: Lateral A Canal

Inter 66th Ave/College Ln, Indian River, FL

Built 2009 Load: 38.1 t ADT: 3,000

US-1 (SR-5)

Good

Over: South Relief Canal

1.30 mi. N of SR-607, Indian River, FL

Built 2010 Load: 38.2 t ADT: 18,750

COUNTRY CLUB DRIVE

Good

Over: MAIN CANAL

50FT. S OF 30TH STREET, Indian River, FL

Built 1987 Load: 38.2 t ADT: 428

20TH AVENUE

Good

Over: SOUTH RELIEF CANAL

2.6 MILES S OF SR-60, Indian River, FL

Built 1992 Load: 38.2 t ADT: 7,300

CR-606 Oslo Rd

Good

Over: Lateral B Canal

At CR-613, Indian River, FL

Built 2002 Load: 38.6 t ADT: 9,500

13th Street SW

Good

Over: Lateral B Canal

At CR-613 (58th Ave.), Indian River, FL

Built 2015 Load: 38.6 t ADT: 120

CR-512

Good

Over: PARK LATERAL CANAL

9.2MI N OF SR-60, Indian River, FL

Built 1999 Load: 39.9 t ADT: 1,500

SR-60 WB

Good

Over: Padgett Branch Marsh

6.4Mi. E of SR-91 (TPK), Indian River, FL

Built 2007 Load: 40.6 t ADT: 4,088

SR-60 EB

Good

Over: Padgett Branch Marsh

6.4Mi. E of SR-91 (TPK), Indian River, FL

Built 2007 Load: 40.6 t ADT: 4,088

66th Avenue

Good

Over: Main Relief Canal

0.7Mi South of SR-60, Indian River, FL

Built 2014 Load: 40.8 t ADT: 4,100

SR-60 WB

Good

Over: L-78 Borrow Canal

10.3Mi. E of SR-91 (TPK), Indian River, FL

Built 2007 Load: 40.9 t ADT: 4,088

SR-60 EB

Good

Over: L-78 Borrow Canal

10.3Mi. E of SR-91 (TPK), Indian River, FL

Built 2005 Load: 40.9 t ADT: 4,088

NW 27TH AVE.

Good

Over: MAIN CANAL

0.4Mi. North of SR-60, Indian River, FL

Built 1993 Load: 41.2 t ADT: 6,900

58TH AVENUE

Good

Over: NORTH RELIEF CANAL

0.4MI N OF 49TH ST., Indian River, FL

Built 2023 Load: 41.5 t ADT: 7,473

16th Street

Good

Over: Range Line Canal

At 74th Avenue, Indian River, FL

Built 2009 Load: 41.8 t ADT: 101

53RD STREET

Good

Over: LATERAL A CANAL

AT CR-615 (66TH AVE.), Indian River, FL

Built 2023 Load: 41.8 t ADT: 134

US-1 (SR-5) SB

Good

Over: North Relief Canal

4.3 Miles North of SR-60, Indian River, FL

Built 1961 Load: 42.5 t ADT: 12,000

US-1 (SR-5) NB

Good

Over: North Relief Canal

4.3 Miles North of SR-60, Indian River, FL

Built 1961 Load: 42.5 t ADT: 12,000

US-1 (SR-5)

Good

Over: MAIN CANAL VERO BEACH

0.75 Mile North of SR-60, Indian River, FL

Built 1980 Load: 42.6 t ADT: 22,000

CR-512

Good

Over: LATERAL U CANAL

7MI NORTH OF SR-60, Indian River, FL

Built 1999 Load: 43.0 t ADT: 910

CR-613 (58TH AVE.)

Good

Over: RELIEF CANAL

0.3MI S OF SR-60, Indian River, FL

Built 1999 Load: 43.2 t ADT: 18,400

16TH ST

Good

Over: LATERAL B CANAL

20ft. E of 58th Ave/CR613, Indian River, FL

Built 1999 Load: 43.5 t ADT: 3,800

CR-606 (Oslo Rd)

Good

Over: Lateral J Canal

0.6Mi W of US-1, Indian River, FL

Built 2007 Load: 43.5 t ADT: 14,400

26TH STREET

Good

Over: LATERAL CANAL A

AT CR-615 - 66TH AVE, Indian River, FL

Built 1998 Load: 43.9 t ADT: 1,000

27th Street

Good

Over: Main Relief Canal

130ft. S of Aviation Blvd, Indian River, FL

Built 2006 Load: 45.4 t ADT: 3,000

53rd Street

Good

Over: Lateral H Canal

1.6 Miles East of 58th Av, Indian River, FL

Built 2009 Load: 46.4 t

SR91 SB TPK 175.4

Good

Over: OUTFALL CANAL

9.3 mi S of Ft Drum Plz, Indian River, FL

Built 1963 Load: 46.7 t ADT: 18,350

SR91 NB TPK 175.4

Good

Over: OUTFALL CANAL

9.3 mi S of Ft Drum Plz, Indian River, FL

Built 1963 Load: 46.7 t ADT: 18,350

CR605 Old Dixie

Good

Over: South Relief Canal

1.3 Mi. North of CR-606, Indian River, FL

Built 2010 Load: 47.7 t ADT: 8,400

SR91 SB TPK 189.1

Good

Over: Padgett Branch

1.4 MI S OF OSCEOLA CNTY, Indian River, FL

Built 1962 Load: 48.0 t ADT: 18,350

SR91 NB TPK 189.1

Good

Over: Padgett Branch

1.4 MI S OF OSCEOLA CNTY, Indian River, FL

Built 1964 Load: 48.0 t ADT: 18,350

ENGLAR DRIVE

Good

Over: COLLIER WATERWAY

0.9MI W OF SCHUMANN RD, Indian River, FL

Built 1972 Load: 48.1 t ADT: 1,750

61ST / PECAN GROVE

Good

Over: LATERAL A CANAL

25Ft East of 66th Avenue, Indian River, FL

Built 2023 Load: 49.0 t ADT: 101

65TH ST

Good

Over: LATERAL A CANAL

25FT EAST OF 66TH AVE, Indian River, FL

Built 2024 Load: 49.0 t

SR510 Wabasso Road

Good

Over: Indian River Relief

0.5Mi East of US-1, Indian River, FL

Built 1967 Load: 49.1 t ADT: 14,500

CR-630 (41st St.)

Good

Over: Lateral A Canal

At CR-615 (66th Avenue), Indian River, FL

Built 2013 Load: 49.6 t ADT: 480

INDIAN RIV BLVD NB

Good

Over: NORTH CANAL

0.4MI. N OF SR-60, Indian River, FL

Built 1994 Load: 50.2 t ADT: 6,960

INDIAN RIV BLVD SB

Good

Over: NORTH CANAL

0.4MI N OF SR-60, Indian River, FL

Built 1994 Load: 50.2 t ADT: 6,960

SR-60 EB

Good

Over: MAIN CANAL

SR60, 1.6Miles W. of A1A, Indian River, FL

Built 1994 Load: 50.7 t ADT: 16,000

SR-60 WB

Good

Over: MAIN CANAL

SR-60 1.6MILES W. OF A1A, Indian River, FL

Built 1994 Load: 50.7 t ADT: 16,000

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial