Champaign County, IL

743 public highway bridges

Champaign County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Champaign County, Illinois contains 743 public highway bridges. Roughly 55.3% are rated “Good,” 26.4% “Fair,” and 6.9% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

743
Total Bridges
55.3%
Good
26.4%
Fair
6.9%
Poor Condition

Condition Distribution

Good
55.3% (411)
Fair
26.4% (196)
Poor
6.9% (51)

All Bridges (743)

CRESCENT DR/ PED B

Fair

Over: PHINNEY BRANCH

.7MI SE KIRBY/DUNCAN, Champaign, IL

Built 2004 Load: 39.9 t ADT: 450

US 150(FAP 808)

Fair

Over: BONEYARD CREEK

JUST E FIVE POINTS, Champaign, IL

Built 1970 Load: 40.2 t ADT: 12,000

I-57

Fair

Over: STREAM

1 MI S OF THOMABORO, Champaign, IL

Built 1968 Load: 40.2 t ADT: 22,500

I-57(NB)

Fair

Over: Norfolk Southern Railway

SW OF TOLONO, Champaign, IL

Built 1963 Load: 40.8 t ADT: 11,550

I-74(EB)

Fair

Over: SALT FORK RIVER

W EDGE OF ST JOSEPH, Champaign, IL

Built 1959 Load: 41.5 t ADT: 14,150

I-74(WB)

Fair

Over: SALT FORK RIVER

W EDGE OF ST JOSEPH, Champaign, IL

Built 1959 Load: 41.5 t ADT: 14,150

CH 15(FAS 512)

Fair

Over: BRANCH OF SALT FORK

W SIDE OF SIDNEY, Champaign, IL

Built 1982 Load: 42.1 t ADT: 3,100

FAS 512 (CH 15)

Fair

Over: UP RR

0.5 MI E OF SIDNEY, Champaign, IL

Built 1953 Load: 42.4 t ADT: 1,700

CH 16(FAS 526)

Fair

Over: E BR EMBARRAS RIVER

2 MI E OF BONGARD, Champaign, IL

Built 1982 Load: 42.8 t ADT: 525

CH 12(FAS 516)

Fair

Over: SALT FORK RIVER

1 MI N ST JOSEPH, Champaign, IL

Built 1971 Load: 43.1 t ADT: 1,950

DUNCAN RD(FAU 7155

Fair

Over: PHINNEY BRANCH

S. of StonyBrook Dr., Champaign, IL

Built 1969 Load: 43.4 t ADT: 7,500

CH 20(FAS 502)

Fair

Over: SALINE BRANCH DITCH

E OF LEVERETT, Champaign, IL

Built 1980 Load: 44.7 t ADT: 2,250

I-74(WB)

Fair

Over: W FORK SALINE BRANCH

N OF URBANA, Champaign, IL

Built 1956 Load: 45.0 t ADT: 20,950

I-74(EB)

Fair

Over: W FORK SALINE BRANCH

N OF URBANA, Champaign, IL

Built 1956 Load: 45.0 t ADT: 20,950

I-57(SB)

Fair

Over: COPPER SLOUGH

SW OF CHAMPAIGN, Champaign, IL

Built 1963 Load: 45.4 t ADT: 12,900

I-57(NB)

Fair

Over: COPPER SLOUGH

SW OF CHAMPAIGN, Champaign, IL

Built 1963 Load: 45.4 t ADT: 12,900

I-74(EB)

Fair

Over: Union Pacific Railroad

1.5 MI E ST JOSEPH, Champaign, IL

Built 1959 Load: 46.3 t ADT: 13,200

I-74(WB)

Fair

Over: Union Pacific Railroad

1.5 MI E ST JOSEPH, Champaign, IL

Built 1959 Load: 46.3 t ADT: 13,200

I-57

Fair

Over: STREAM

MARKET ST, Champaign, IL

Built 1966 Load: 46.7 t ADT: 22,500

I57 RAMP #13.41

Fair

Over: DITCH

SW OF CHAMPAIGN, Champaign, IL

Built 2006 Load: 48.9 t ADT: 1,150

MATTIS AVE(FAU 715

Fair

Over: PHINNEY BRANCH

0.75 MI S KIRBY AVE, Champaign, IL

Built 1977 Load: 49.6 t ADT: 5,500

I-57(NB)

Fair

Over: Canadian National Railwa

.75 MI N OF US 136, Champaign, IL

Built 1968 Load: 50.9 t ADT: 10,550

I-57(SB)

Fair

Over: Canadian National Railwa

.75 MI N OF US 136, Champaign, IL

Built 1968 Load: 50.9 t ADT: 10,550

FAS 533

Fair

Over: STREAM

MARKET ST N CHMPGN, Champaign, IL

Built 1968 Load: 52.8 t ADT: 3,750

FAP 326 (IL 47)

Fair

Over: STREAM

4.5 MI N MAHOMET, Champaign, IL

Built 1982 Load: 54.1 t ADT: 3,600

I-57

Fair

Over: BIG DITCH

1.75 MI N OF US 136, Champaign, IL

Built 1970 Load: 57.3 t ADT: 21,100

ILL 49(FAP 836)

Fair

Over: STREAM

4.5 MI S OF HOMER, Champaign, IL

Built 1978 Load: 58.6 t ADT: 1,350

I-57(SB)

Fair

Over: PHINNEY BRANCH

SW OF CHAMPAIGN, Champaign, IL

Built 1963 Load: 59.9 t ADT: 12,900

I-57(NB)

Fair

Over: PHINNEY BRANCH

SW OF CHAMPAIGN, Champaign, IL

Built 1963 Load: 59.9 t ADT: 12,900

CH 22(FAS 515)

Fair

Over: STREAM

2 MI N OF PENFIELD, Champaign, IL

Built 1934 Load: 73.2 t ADT: 175

FAP 804(US 45)

Fair

Over: STREAM

NEIL & WINDSOR CHAMP, Champaign, IL

Built 1989 Load: 89.1 t ADT: 19,500

FAI7196 HIGHCROSS

Good

Over: SALINE BRANCH

NE EDGE OF URBANA, Champaign, IL

Built 2022 ADT: 1,800

FAU 7202/SCOTTSDAL

Good

Over: PHINNEY BRANCH

0.3 S KIRBY AVE, Champaign, IL

Built 1900 Load: 17.5 t ADT: 900

TR 181 A

Good

Over: STREAM

1 MI NE OGDEN, Champaign, IL

Built 1970 Load: 19.4 t ADT: 150

TR 28 A

Good

Over: STREAM

6.0 MI SW FISHER, Champaign, IL

Built 1954 Load: 21.1 t ADT: 50

FAS-517 (CH-11)

Good

Over: Upper SaltFork Drain

1.5 MI W FLATVILLE, Champaign, IL

Built 1977 Load: 21.4 t ADT: 1,100

TR 272

Good

Over: FLATVILLE DRAIN DIT

1.5 MI N FLATVILLE, Champaign, IL

Built 1970 Load: 21.7 t ADT: 325

TR 69 C

Good

Over: UPPER SALT FORK DIT

1.5 MI SE RANTOUL, Champaign, IL

Built 1980 Load: 23.3 t ADT: 50

TR 30 C

Good

Over: STREAM

3.5 MI NW MAHOMET, Champaign, IL

Built 1976 Load: 23.7 t ADT: 50

E VICTORY ST(MS290

Good

Over: STREAM

SIDNEY, Champaign, IL

Built 1968 Load: 24.0 t ADT: 200

FAS 516(CH 9)

Good

Over: UPPER SALT CREEK

LUDLOW RD OVER I-57, Champaign, IL

Built 1969 Load: 24.3 t ADT: 175

TR 121

Good

Over: BEAVER LAKE DRAINAGE

1.3 MI NW LEVERETT, Champaign, IL

Built 1968 Load: 24.3 t ADT: 50

TR 247 A

Good

Over: STREAM

3 MI N SADORUS, Champaign, IL

Built 1975 Load: 24.3 t ADT: 25

TR 228

Good

Over: UPPER SALT CREEK

0.5 MI W LUDLOW, Champaign, IL

Built 1968 Load: 24.3 t ADT: 50

TR 228 A

Good

Over: UPPER SALT CREEK

SW CORNER LUDLOW, Champaign, IL

Built 1968 Load: 24.3 t ADT: 75

TR 197

Good

Over: SALT FORK VERM RIV

2 MI SW ST JOSEPH, Champaign, IL

Built 1972 Load: 24.9 t ADT: 225

US 150(FAS 1512)

Good

Over: Salt Fork River

1 MI W ST JOSEPH, Champaign, IL

Built 1939 Load: 25.3 t ADT: 5,550

TR 307

Good

Over: HAYES BRANCH

2.4 MI SW PESOTUM, Champaign, IL

Built 1972 Load: 26.6 t ADT: 75

TR 37 B

Good

Over: UPPER SALT CREEK

2.2 MI NE RANTOUL, Champaign, IL

Built 1973 Load: 26.9 t ADT: 150

TR 249 A

Good

Over: STREAM

1.0 MI SW SIDNEY, Champaign, IL

Built 1975 Load: 27.2 t ADT: 375
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.