McClain County, OK

239 public highway bridges

McClain County Bridge Snapshot

McClain County, Oklahoma contains 239 public highway bridges in the FHWA National Bridge Inventory. Roughly 36.4% are rated “Good,” 44.4% “Fair,” 3.8% “Poor,” and 3.8% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in OK are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

239
Total Bridges
36.4%
Good
3.8%
Poor
3.8%
Structurally Deficient

Condition Distribution

Good
36.4% (87)
Fair
44.4% (106)
Poor
3.8% (9)
SD
3.8% (9)

All Bridges (239)

E1420

Fair

Over: COLBERT CREEK

4W 1S .1W OF CRINER, McClain, OK

Built 1985 Load: 32.8 t ADT: 100

E1360

Fair

Over: CREEK

.5N .5E OF DIBBLE, McClain, OK

Built 1985 Load: 32.9 t ADT: 100

S.H. 59

Fair

Over: CREEK

0.5 MI. E. JCT. SH74, McClain, OK

Built 1999 Load: 33.6 t ADT: 730

E1490

Fair

Over: WASHINGTON CREEK

2N 3.4E OF PAOLI, McClain, OK

Built 2001 Load: 33.6 t ADT: 100

E1460

Fair

Over: CREEK

2S .1W OF STEALY, McClain, OK

Built 2006 Load: 33.8 t ADT: 100

E1330

Fair

Over: CREEK

.5E 3.5S 1.1E BLANCHARD, McClain, OK

Built 2009 Load: 33.8 t ADT: 100

S.H. 74

Fair

Over: CREEK

1.4 MI. S. JCT. I35, McClain, OK

Built 1949 Load: 34.2 t ADT: 5,400

NE 1ST ST

Fair

Over: CREEK

1.1 E NEWCASTLE, McClain, OK

Built 1985 Load: 34.2 t ADT: 100

S.H. 59

Fair

Over: CANADIAN SANDY CREEK

4.7 MI.W.OF BYARS, McClain, OK

Built 1931 Load: 34.9 t ADT: 1,200

I-35 FRONTAGE RD.

Fair

Over: CREEK

8.5 MI N GARVIN C/L, McClain, OK

Built 1967 Load: 35.2 t ADT: 100

I-35

Fair

Over: S. CANADIAN O'FLOW

.3 MI S CLEV. C/L, McClain, OK

Built 1988 Load: 36.3 t ADT: 28,100

U.S. 62

Fair

Over: N. FORK WALNUT CR. O'FLO

4.3 MI.NE. GRADY CL, McClain, OK

Built 1995 Load: 36.3 t ADT: 6,000

U.S. 62

Fair

Over: N. FORK WALNUT CR. O'FLO

4.3 MI.NE. GRADY CL, McClain, OK

Built 1995 Load: 36.3 t ADT: 6,100

I-35 SB RAMP S.H.9

Fair

Over: S. CANADIAN O'FLOW

S. OF NORMAN, McClain, OK

Built 2006 Load: 38.0 t ADT: 6,650

E1440

Fair

Over: PANTHER CREEK

3S 1.5W OF CRINER, McClain, OK

Built 1991 Load: 39.5 t ADT: 100

I-35

Fair

Over: WALNUT CREEK O'FLOW

.6 MI N JCT SH 39, McClain, OK

Built 1967 Load: 40.8 t ADT: 15,100

E1370

Fair

Over: SANDY CREEK

3W 1N .5W OF WOODY CHAPEL, McClain, OK

Built 1991 Load: 42.2 t ADT: 100

E1410

Fair

Over: FINN CREEK

3.9E OF CRINER, McClain, OK

Built 1996 Load: 42.6 t ADT: 50

E1450

Fair

Over: TOMIKE CREEK

1.2E .3S OF ROSEDALE, McClain, OK

Built 1987 Load: 43.4 t ADT: 100

U.S. 62

Fair

Over: NORTH FORK WALNUT CREEK

4.2 MI.NE. GRADY CL, McClain, OK

Built 1995 Load: 43.5 t ADT: 6,100

I-44

Fair

Over: S. CANADIAN RIVER

MC CLAIN&CLEVELAND CL, McClain, OK

Built 2000 Load: 43.5 t ADT: 45,900

S.H. 76

Fair

Over: CREEK

5.8 MI.N. JCT. US62, McClain, OK

Built 1958 Load: 43.7 t ADT: 6,100

E1440

Fair

Over: CREEK

.9E OF STEALY, McClain, OK

Built 2005 Load: 44.4 t ADT: 100

E1440

Fair

Over: CREEK

.5W OF STEALY, McClain, OK

Built 2011 Load: 44.5 t ADT: 100

N2990

Fair

Over: WALNUT CREEK

.5E1.5S1W.3S OF BLANCHARD, McClain, OK

Built 1990 Load: 45.0 t ADT: 100

E1440

Fair

Over: CREEK

1E OF STEALY, McClain, OK

Built 2005 Load: 45.3 t ADT: 100

N3400

Fair

Over: CREEK

1S; .7W OF CHISM, McClain, OK

Built 2007 Load: 45.7 t ADT: 100

E1440

Fair

Over: WOLF CREEK

.1E;1.5N 1.5W OF PAYNE, McClain, OK

Built 2009 Load: 48.4 t ADT: 100

E1460

Fair

Over: CREEK

2S .4W OF STEALY, McClain, OK

Built 2006 Load: 48.8 t ADT: 100

E1440

Fair

Over: CREEK

1N; 2.4E OF SH 59 / US 77, McClain, OK

Built 2009 Load: 49.5 t ADT: 90

E1480

Fair

Over: CREEK

.4S 2.9E OF BYARS, McClain, OK

Built 1999 Load: 54.7 t ADT: 100

E1440

Fair

Over: SECOND CREEK

2.6W OF STEALY, McClain, OK

Built 2001 Load: 56.2 t ADT: 100

NE 16TH ST

Fair

Over: POND CREEK

1.0 N; 0.4 E NEWCASTLE, McClain, OK

Built 2013 Load: 56.4 t ADT: 100

N3020

Fair

Over: DIBBLE CREEK

.5S .5E .3N OF DIBBLE, McClain, OK

Built 2020 Load: 58.5 t ADT: 100

E1350

Fair

Over: WALNUT CREEK BRANCH

2E OF WASHINGTON, McClain, OK

Built 2012 Load: 59.4 t ADT: 100

E1300

Fair

Over: CREEK

.3E .5S .2E OF BLANCHARD, McClain, OK

Built 1990 Load: 61.8 t ADT: 100

I-35

Fair

Over: CREEK

5.2 MI S CLEV. C/L, McClain, OK

Built 1959 Load: 62.1 t ADT: 36,300

I-35

Fair

Over: CREEK

4.4 MI S CLEV. C/L, McClain, OK

Built 1959 Load: 62.1 t ADT: 36,300

E1460

Fair

Over: TOMIKE CREEK

.5E 1.3S .3E OF ROSEDALE, McClain, OK

Built 2002 Load: 65.3 t ADT: 50

E1380

Fair

Over: CREEK

1.1S2.3W1N .1W OF PURCELL, McClain, OK

Built 1989 Load: 68.7 t ADT: 100

E1440

Fair

Over: CREEK

3.3E .6N OF WAYNE, McClain, OK

Built 2009 Load: 69.5 t ADT: 100

E1330

Fair

Over: CREEK

2.6W; 1S OF COLE, McClain, OK

Built 2009 Load: 83.2 t ADT: 100

N3050

Fair

Over: SANDY CREEK

4W .7N OF WOODY CHAPEL, McClain, OK

Built 1985 Load: 90.5 t ADT: 100

N3220

Good

Over: CREEK

.6N 2.8E OF WAYNE, McClain, OK

Built 1986 Load: 16.6 t ADT: 100

N3090

Good

Over: CREEK

4E .2S OF CRINER, McClain, OK

Built 1939 Load: 19.6 t ADT: 100

N3090

Good

Over: CREEK

4E 1.7S OF CRINER, McClain, OK

Built 1939 Load: 19.6 t ADT: 100

N3160

Good

Over: CREEK

3.S OF PURCELL, McClain, OK

Built 1939 Load: 22.5 t ADT: 100

E1460

Good

Over: CREEK

2S OF STEALY, McClain, OK

Built 1950 Load: 22.5 t ADT: 100

E1340

Good

Over: CREEK

1N .2E OF WASHINGTON, McClain, OK

Built 1984 Load: 22.5 t ADT: 100

S.H. 74

Good

Over: CREEK

2.7 MI. S. JCT. SH 59, McClain, OK

Built 1950 Load: 25.3 t ADT: 2,300