Polk County, OR

161 public highway bridges

Polk County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Polk County, Oregon contains 161 public highway bridges. Roughly 28% are rated “Good,” 58.4% “Fair,” and 6.8% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

161
Total Bridges
28%
Good
58.4%
Fair
6.8%
Poor Condition

Condition Distribution

Good
28% (45)
Fair
58.4% (94)
Poor
6.8% (11)

All Bridges (161)

OR 223 (Hwy 191)

Fair

Over: McTimmonds Creek

006 MI N PEDEE, Polk, OR

Built 1967 Load: 23.7 t ADT: 735

HELMICK ROAD

Fair

Over: LUCKIAMUTE RIVER OVERFLO

004 S HELMICK STATE PARK, Polk, OR

Built 1974 Load: 23.7 t ADT: 550

OR 99W (HWY 91)

Fair

Over: South Fork Ash Creek

006 MI S MONMOUTH, Polk, OR

Built 1957 Load: 24.0 t ADT: 8,500

Hwy 194

Fair

Over: South Fork Ash Creek

002 MI W MONMOUTH, Polk, OR

Built 1966 Load: 24.0 t ADT: 1,317

HARMONY ROAD

Fair

Over: MILL CREEK

015 N OF BUELL, Polk, OR

Built 1966 Load: 24.0 t ADT: 624

TALMADGE ROAD

Fair

Over: S FORK ASH CREEK

010 S OF STATE HWY 51, Polk, OR

Built 1973 Load: 24.5 t ADT: 375

BALSTON ROAD

Fair

Over: TRIB OF S YAMHILL RIVER

030 SE SHERIDAN, Polk, OR

Built 1965 Load: 25.6 t ADT: 624

GREENWOOD ROAD

Fair

Over: OAK POINT CREEK

006 N STATE HWY 51, Polk, OR

Built 1966 Load: 25.9 t ADT: 428

16TH ST

Fair

Over: CREEK

0.6 MI N OF OR 51, Polk, OR

Built 2002 Load: 26.9 t ADT: 520

PLEASANT HILL ROAD

Fair

Over: TRIB OF S YAMHILL RIVER

.5 WSW OF BALLSTON, Polk, OR

Built 1965 Load: 27.2 t ADT: 80

OR 99W (Hwy 91)

Fair

Over: Luckiamute River Oflow

050 MI S MONMOUTH, Polk, OR

Built 1958 Load: 27.9 t ADT: 7,736

ELKINS ROAD

Fair

Over: LITTLE LUCKIAMUTE O/FLOW

03.3 W OF CO RD 9599, Polk, OR

Built 1975 Load: 28.5 t ADT: 885

SOCIALIST VALLEY

Fair

Over: LITTLE LUCKIAMUTE RIVER

030 W OF FALLS CITY, Polk, OR

Built 2001 Load: 29.2 t ADT: 26

AIRLIE ROAD

Fair

Over: LUCKIAMUTE RIVER

001 SE OF MAPLE GROVE, Polk, OR

Built 2006 Load: 29.5 t ADT: 803

GREENWOOD ROAD

Fair

Over: RICKREALL CREEK

004 S STATE HWY 22, Polk, OR

Built 2005 Load: 30.5 t ADT: 645

HARMONY ROAD

Fair

Over: GOOSE CREEK

004 N OF BUELL, Polk, OR

Built 1964 Load: 30.8 t ADT: 748

OR 223 (Hwy 191)

Fair

Over: Ritner Creek

035 MI. S PEDEE, Polk, OR

Built 1976 Load: 31.4 t ADT: 514

Hwy 194

Fair

Over: Fern Creek

062 MI W MONMOUTH, Polk, OR

Built 1966 Load: 31.4 t ADT: 826

FIRE HALL ROAD

Fair

Over: ROCK CREEK

001 S OF STATE HWY 18, Polk, OR

Built 2006 Load: 31.4 t ADT: 294

OR 18 (Hwy 39)

Fair

Over: South Yamhill River

00.4 MI E GRAND RONDE, Polk, OR

Built 1931 Load: 32.7 t ADT: 12,806

OR 18 (Hwy 39)

Fair

Over: Creek

012 MI E HWY 30 JCT, Polk, OR

Built 1957 Load: 32.7 t ADT: 6,097

PERRYDALE ROAD

Fair

Over: E FORK SALT CREEK

001 N STATE HWY 22, Polk, OR

Built 1965 Load: 34.0 t ADT: 1,125

SAVAGE ROAD

Fair

Over: TRIB OF S YAMHILL RIVER

020 SE OF WILLAMINA, Polk, OR

Built 1960 Load: 34.3 t ADT: 58

OR 99W (HWY 91)

Fair

Over: Middle Creek Ash Creek

IN MONMOUTH, Polk, OR

Built 1954 Load: 34.5 t ADT: 11,999

HELMICK ROAD

Fair

Over: SOUTH FORK ASH CREEK

005 S OF MONMOUTH, Polk, OR

Built 1955 Load: 35.4 t ADT: 489

OR 221 (HWY 150)

Fair

Over: Spring Valley Creek

016 MI S OF POLK CO LINE, Polk, OR

Built 1989 Load: 36.0 t ADT: 5,930

OAK KNOLL ROAD

Fair

Over: SPRING VALLEY CREEK

008 W STATE HWY 221, Polk, OR

Built 1966 Load: 37.2 t ADT: 109

GUN CLUB ROAD

Fair

Over: NORTH FORK ASH CREEK

003 MI N OF STATE HWY 51, Polk, OR

Built 1983 Load: 38.1 t ADT: 2,247

BUENA VISTA RD

Fair

Over: SMALL CREEK

001 E MARKET ROAD 9, Polk, OR

Built 1971 Load: 38.1 t ADT: 1,404

STARR ROAD

Fair

Over: WEST FORK SALT CREEK

001 NE OF STATE HWY 22, Polk, OR

Built 1991 Load: 38.6 t ADT: 104

GRAND RONDE ROAD

Fair

Over: SOUTH YAMHILL RIVER

003 N STATE HWY 18, Polk, OR

Built 1970 Load: 38.9 t ADT: 2,809

GOLD CREEK ROAD

Fair

Over: GOLD CREEK

031 SW OF WALLACE BRIDGE, Polk, OR

Built 1991 Load: 38.9 t ADT: 218

GARDNER ROAD

Fair

Over: TEAL CREEK

040 SE FALLS CITY, Polk, OR

Built 1964 Load: 39.0 t ADT: 261

GOOSENECK ROAD

Fair

Over: GOOSENECK CREEK

042 SW STATE HWY 22, Polk, OR

Built 1965 Load: 39.0 t ADT: 310

MORROW ROAD

Fair

Over: RICKREALL CREEK

0005 S OF COUNTY RD 7426, Polk, OR

Built 1960 Load: 39.9 t ADT: 389

GOOSENECK ROAD

Fair

Over: GOOSENECK CREEK

028 S OF STATE HWY 22, Polk, OR

Built 1982 Load: 40.5 t ADT: 354

SMITH ROAD

Fair

Over: LITTLE LUCKIAMUTE RIVER

003 MI NORTH OF CO RD 15, Polk, OR

Built 1981 Load: 41.7 t ADT: 67

GOLD CREEK ROAD

Fair

Over: GOLD CREEK

025 SW OF WALLACE BRIDGE, Polk, OR

Built 1991 Load: 42.6 t ADT: 218

MILL CR RD

Fair

Over: MILL CREEK

025 S OF STATE HWY 22, Polk, OR

Built 1981 Load: 44.7 t ADT: 284

BROWN ROAD

Fair

Over: WEST FORK SALT CREEK

0013 SW OF STATE HWY 22, Polk, OR

Built 1988 Load: 45.0 t ADT: 261

WIGRICH ROAD

Fair

Over: WILLAMETTE RIVER OVERFLO

REPLACED BRIDGE # 53C113, Polk, OR

Built 2004 Load: 45.4 t ADT: 107

DE ARMOND ROAD

Fair

Over: BERRY CREEK

030 SW OF SUVER, Polk, OR

Built 1978 Load: 45.4 t ADT: 65

FALLS CITY ROAD

Fair

Over: FERN CREEK

003 W STATE HWY 223, Polk, OR

Built 1964 Load: 49.0 t ADT: 2,893

STARR ROAD

Fair

Over: W FORK SALT CREEK

008 NE OF STATE HWY 22, Polk, OR

Built 1991 Load: 50.8 t ADT: 73

VAN WELL ROAD

Fair

Over: E FORK SALT CREEK

001 N OF STATE HWY 22, Polk, OR

Built 1965 Load: 51.7 t ADT: 114

OR 51 (Hwy 193)

Fair

Over: Ash Creek

INDEPENDENCE, Polk, OR

Built 1981 Load: 52.2 t ADT: 7,202

BROWN ROAD

Fair

Over: WEST FORK SALT CREEK

0072 SW OF STATE HWY 22, Polk, OR

Built 1988 Load: 52.2 t ADT: 208

GAGE ROAD

Fair

Over: SHEYTHE CREEK

017 W OF STATE HWY 223, Polk, OR

Built 1993 Load: 54.8 t ADT: 219

OR 51 (Hwy 43)

Fair

Over: South Fork Ash Creek

In Independence, Polk, OR

Built 1950 Load: 55.3 t ADT: 7,522

Hanna Road

Fair

Over: Drainage Ditch

Hanna Road, Polk, OR

Built 1993 Load: 64.5 t ADT: 248
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.