State profile · Above national median SD

Puerto Rico bridge safety

Condition ratings, load ratings, and structural-deficiency data for every public highway bridge in Puerto Rico — drawn straight from the FHWA National Bridge Inventory.

2,387
Public bridges
14.1%
Good condition
12.0%
Poor condition
12.0%
Structurally deficient

Total Bridges

2,387

Public highway bridges in Puerto Rico

Good Condition

14.1%

336 bridges rated 7-9

-35.9pp vs 50% benchmark

Poor Condition

12.0%

286 bridges rated 0-4

Structurally Deficient

12.0%

286 bridges flagged for repair priority

5.0pp vs national avg 7.0%

Puerto Rico vs national bridge condition

Puerto Rico — Good condition share 14.1%
National avg

Share of bridges rated 7-9 on the FHWA 0-9 scale (deck, superstructure, substructure all good).

Puerto Rico — Structurally deficient share 39.9%
National avg

Lower is better. Bar maxes at 30% (worst-state ceiling). National average sits at 7.0%.

Puerto Rico vs nearby ranks

Adjacent states on the structurally deficient leaderboard (lower share = better)

States are ranked by share of bridges flagged structurally deficient — the FHWA classification for any span where deck, superstructure, or substructure carries a condition rating of 4 or below. Lower percentages indicate stronger maintenance funding and inspection follow-through. States here sit immediately above and below Puerto Rico on the same metric.

38

North Dakota

10.84% top marginal rate
Structure
Progressive
Burden @ $100K
$4,242

22

Louisiana

11.00% top marginal rate
Structure
Progressive
Burden @ $100K
$12,699
Selected

72

Puerto Rico

11.98% top marginal rate
Structure
Progressive
Burden @ $100K
$2,387

23

Maine

13.23% top marginal rate
Structure
Progressive
Burden @ $100K
$771

66

Guam

15.25% top marginal rate
Structure
Progressive
Burden @ $100K
$59

Bridges Needing Most Attention in Puerto Rico

Six lowest-condition bridges in Puerto Rico, ranked by composite NBI rating. Each is inspected at least every 24 months.

All Bridges in Puerto Rico

PR 686

Fair

Over: TORTUGUERO CHANNEL

5 KM NORTH EAST OF MANATI, Manatí, PR

Built 1961 Load: 19.5 t ADT: 3,600

OFF PR-716 AT 1.20

Fair

Over: CUYON RIVER

3.8 KM. SOUTH OF AIBONITO, Aibonito, PR

Built 2011 Load: 19.6 t ADT: 1,000

A STREET

Fair

Over: CHIQUITO RIVER

2 KM NORTH OF PONCE, Ponce, PR

Built 1960 Load: 19.6 t ADT: 1,000

CONSTITUCION AVE.

Fair

Over: CHANNEL

WEST OF COTTO HOUSING DEV, Arecibo, PR

Built 1963 Load: 19.8 t ADT: 14,100

OFF PR 173

Fair

Over: GRANDE CREEK

0.32KM NORTH OF PR 173, Aibonito, PR

Built 1977 Load: 19.9 t ADT: 150

PR 743

Fair

Over: WATERWAY

8 MILES N E OF CAYEY, Cayey, PR

Built 1969 Load: 19.9 t ADT: 2,900

PR 149

Fair

Over: GUANABANA CREEK

3 KM SOUTHWEST JUANA DIAZ, Juana Díaz, PR

Built 1924 Load: 19.9 t ADT: 18,500

PR 969

Fair

Over: CREEK

5 KM NORTHWEST OF NAGUABO, Naguabo, PR

Built 1960 Load: 19.9 t ADT: 1,400

PR 184

Fair

Over: GRANDE DE PATILLAS RIVER

10 KM N W OF PATILLAS, Patillas, PR

Built 1963 Load: 19.9 t ADT: 1,227

OFF PR 371 km 0.4

Fair

Over: UNKNOWN WATERWAY

2.4 KMS. NW. OF YAUCO, Yauco, PR

Built 1980 Load: 19.9 t ADT: 100

PR 102

Fair

Over: IRIZARRY CREEK

8 KM N W OF CABO ROJO, Cabo Rojo, PR

Built 1940 Load: 20.0 t ADT: 9,295

PR 528

Fair

Over: ZAMAS RIVER

2 KM SOUTH WEST OF JAYUYA, Jayuya, PR

Built 1957 Load: 20.0 t ADT: 1,000

PR 684

Fair

Over: BOCAS CHANNEL

1.6 MILE N OF BARCELONETA, Barceloneta, PR

Built 1957 Load: 20.1 t ADT: 1,600

PR 108

Fair

Over: CASEI RIVER

9 KM N E OF MAYAGUEZ, Las Marías, PR

Built 1958 Load: 20.3 t ADT: 2,600

PR 119

Fair

Over: NUEVE PASOS RIVER

7 KM NORTH OF SAN GERMAN, San Germán, PR

Built 1929 Load: 20.3 t ADT: 5,800

PR 156

Fair

Over: BARRANQUITAS RIVER

25 MT W INT PR156 & P, Barranquitas, PR

Built 1908 Load: 20.4 t ADT: 11,900

PR 3

Fair

Over: CANOVANILLAS RIVER

3 KM WEST OF CANOVANAS, Canóvanas, PR

Built 1955 Load: 20.4 t ADT: 43,400

PR 723

Fair

Over: AGUAS LARGAS CREEK

5.5 KM WEST OF AIBONITO, Coamo, PR

Built 1949 Load: 20.4 t ADT: 9,060

OFF PR 123 @ KM 52

Fair

Over: GRANDE DE ARECIBO RIVER

3 KM SOUTH WEST OF UTUADO, Utuado, PR

Built 1976 Load: 20.4 t ADT: 3,400

PR 921

Fair

Over: HUMACAO RIVER

0.5 MILE S OF LAS PIEDRAS, Las Piedras, PR

Built 1953 Load: 20.5 t ADT: 7,221

PR 725

Fair

Over: AIBONITO RIVER

0.3 KM NORTH OF AIBONITO, Aibonito, PR

Built 1940 Load: 20.6 t ADT: 12,400

PR 155

Fair

Over: DEPRESSION

12 KM NORTH WEST OF COAMO, Coamo, PR

Built 1941 Load: 20.6 t ADT: 1,400

PR 127

Fair

Over: TIDAL INLET

3 KM E S E OF GUAYANILLA, Guayanilla, PR

Built 1970 Load: 20.6 t ADT: 12,500

PR 924

Fair

Over: MABU CREEK

AT NORTH OF HUMACAO, Humacao, PR

Built 1967 Load: 20.6 t ADT: 7,500

OFF PR 3

Fair

Over: UNNAMED CREEK

0.5 KM NORTH OF BR 2094, Río Grande, PR

Built 1995 Load: 20.6 t ADT: 100

PR 712

Fair

Over: JAJOME CREEK

8 MILES N E OF SALINAS, Salinas, PR

Built 1965 Load: 20.6 t ADT: 3,442

PR 352

Fair

Over: CA%AS RIVER

4 MILES N E OF MAYAGUEZ, Mayagüez, PR

Built 1961 Load: 20.7 t ADT: 500

PR 391

Fair

Over: LOS JOBOS RIVER

BO. RUSIO OF PE¥UELA, Peñuelas, PR

Built 1955 Load: 20.7 t ADT: 7,200

OFF PR 182

Fair

Over: GUAYANES RIVER

12.5 KM NW. YABUCOA, Yabucoa, PR

Built 1997 Load: 20.7 t ADT: 100

PR 115

Fair

Over: MADRE VIEJA CHANNEL

3.8 KMS NE AGUADA'S H, Aguadilla, PR

Built 1951 Load: 20.8 t ADT: 17,200

PR 18

Fair

Over: PIEDRAS RIVER

0.3 KM N INT PR17 & P, San Juan, PR

Built 1967 Load: 20.8 t ADT: 261,000

PR 867 KM 0.8

Fair

Over: UNNAMED CREEK

1 KM EAST OF TOA BAJA, Toa Baja, PR

Built 2003 Load: 20.8 t ADT: 19,200

PR 123

Fair

Over: WATERWAY

WEST OF DOS BOCAS LAKE, Arecibo, PR

Built 1940 Load: 20.9 t ADT: 3,500

PR 7729

Fair

Over: CAÑA CREEK

6.5 KM SOUTHWEST OF CIDRA, Cayey, PR

Built 1969 Load: 20.9 t ADT: 500

CARRION MADURO ST.

Fair

Over: SANTO DOMINGO CREEK

CARRION MADURO ST. CAYEY, Cayey, PR

Built 1975 Load: 20.9 t ADT: 500

OFF PR 127

Fair

Over: CONSEJO CREEK

BO. QUEBRADA S. SOLARES, Guayanilla, PR

Built 1986 Load: 20.9 t ADT: 300

LOCAL ROAD

Fair

Over: SALIENTE RIVER

3KM South East of Jayuya, Jayuya, PR

Built 2006 Load: 20.9 t ADT: 7,500

SICILIA STREET

Fair

Over: JUAN MENDEZ CREEK

1 KM N E OF RIO PIEDRAS, San Juan, PR

Built 1977 Load: 20.9 t ADT: 15,200

PR 155

Fair

Over: HICOTEA CREEK

0.3 KM INT PR643 & PR, Vega Baja, PR

Built 1940 Load: 20.9 t ADT: 1,200

PR-30

Fair

Over: GRANDE DE LOIZA RIVER

2.7 KM. N.E. OF CAGUAS., Caguas, PR

Built 2000 Load: 21.0 t ADT: 78,200

PR-66

Fair

Over: ANGOLA CREEK

3.65 km. SW. OF R. GRANDE, Río Grande, PR

Built 2013 Load: 21.0 t ADT: 12,500

PR 149

Fair

Over: ACHIOTE CREEK

1.5 KM NORTH OF VILLALBA, Villalba, PR

Built 1921 Load: 21.1 t ADT: 1,400

PR 131

Fair

Over: UNNAMED STREAM

4 KM S W OF ADJUNTAS, Adjuntas, PR

Built 1942 Load: 21.2 t ADT: 100

PR 447

Fair

Over: GUATEMALA RIVER

6 KM N E OF SAN SEBASTIAN, San Sebastián, PR

Built 1957 Load: 21.2 t ADT: 1,900

PR 611

Fair

Over: VIVI RIVER

0.10 KM NORTH OF UTUADO, Utuado, PR

Built 1947 Load: 21.2 t ADT: 6,000

PR 1

Fair

Over: CA¥AS RIVER

0.35 KM S INT PR175 &, Caguas, PR

Built 1953 Load: 21.3 t ADT: 46,400

PR 738

Fair

Over: PRIETA CREEK

4 KM NORTH EAST OF CAYEY, Cayey, PR

Built 1937 Load: 21.3 t ADT: 7,900

PR 176

Fair

Over: NEGRITA CREEK

9.1 KM S W TRUJILLO ALTO, San Juan, PR

Built 1940 Load: 21.3 t ADT: 4,000

PR 171

Fair

Over: CREEK

1.5 KM NORTH OF CAYEY, Cayey, PR

Built 1965 Load: 21.4 t ADT: 8,300

PR 191

Fair

Over: CUBUY RIVER

15 KM N W OF NAGUABO, Naguabo, PR

Built 1937 Load: 21.4 t ADT: 1,000

Showing 851-900 of 2,387 bridges

Data sourced from the FHWA National Bridge Inventory (NBI), latest released cycle. See our methodology for details. Retrieved and formatted by PlainBridges Editorial.

Disclaimer: This information is provided for informational purposes only and does not constitute professional advice. Data is sourced from the FHWA National Bridge Inventory (NBI). A "structurally deficient" rating is a repair-priority signal, not a closure or unsafe-to-cross designation. Consult a qualified civil engineer before making decisions based on this data.