State profile · Above national median SD

Puerto Rico bridge safety

Condition ratings, load ratings, and structural-deficiency data for every public highway bridge in Puerto Rico — drawn straight from the FHWA National Bridge Inventory.

2,387
Public bridges
14.1%
Good condition
12.0%
Poor condition
12.0%
Structurally deficient

Total Bridges

2,387

Public highway bridges in Puerto Rico

Good Condition

14.1%

336 bridges rated 7-9

-35.9pp vs 50% benchmark

Poor Condition

12.0%

286 bridges rated 0-4

Structurally Deficient

12.0%

286 bridges flagged for repair priority

5.0pp vs national avg 7.0%

Puerto Rico vs national bridge condition

Puerto Rico — Good condition share 14.1%
National avg

Share of bridges rated 7-9 on the FHWA 0-9 scale (deck, superstructure, substructure all good).

Puerto Rico — Structurally deficient share 39.9%
National avg

Lower is better. Bar maxes at 30% (worst-state ceiling). National average sits at 7.0%.

Puerto Rico vs nearby ranks

Adjacent states on the structurally deficient leaderboard (lower share = better)

States are ranked by share of bridges flagged structurally deficient — the FHWA classification for any span where deck, superstructure, or substructure carries a condition rating of 4 or below. Lower percentages indicate stronger maintenance funding and inspection follow-through. States here sit immediately above and below Puerto Rico on the same metric.

38

North Dakota

10.84% top marginal rate
Structure
Progressive
Burden @ $100K
$4,242

22

Louisiana

11.00% top marginal rate
Structure
Progressive
Burden @ $100K
$12,699
Selected

72

Puerto Rico

11.98% top marginal rate
Structure
Progressive
Burden @ $100K
$2,387

23

Maine

13.23% top marginal rate
Structure
Progressive
Burden @ $100K
$771

66

Guam

15.25% top marginal rate
Structure
Progressive
Burden @ $100K
$59

Bridges Needing Most Attention in Puerto Rico

Six lowest-condition bridges in Puerto Rico, ranked by composite NBI rating. Each is inspected at least every 24 months.

All Bridges in Puerto Rico

PR 149R

Fair

Over: JACAGUAS RIVER

1.5 KM S W OF VILLALBA, Villalba, PR

Built 1966 Load: 23.5 t ADT: 300

OFF PR 149

Fair

Over: JAGUEYES CREEK

2.5 KM S W OF VILLALBA, Villalba, PR

Built 1955 Load: 23.5 t ADT: 250

PR 901

Fair

Over: LAJA CREEK

4 KM EAST OF YABUCOA, Yabucoa, PR

Built 1955 Load: 23.5 t ADT: 4,500

PR 902

Fair

Over: LIMONES RIVER

5 KM NORTHWEST OF YABUCOA, Yabucoa, PR

Built 1962 Load: 23.5 t ADT: 900

PR 2

Fair

Over: HONDO RIVER

0.5 KM BAYAMON DOWNTOWN, Bayamón, PR

Built 1942 Load: 23.6 t ADT: 39,500

PR 3

Fair

Over: CANOVANAS RIVER

AT SOUTH SIDE CANOVANAS, Canóvanas, PR

Built 1956 Load: 23.6 t ADT: 45,200

PR 165

Fair

Over: COCAL RIVER

1.1 KM S E OF DORADO, Dorado, PR

Built 1958 Load: 23.6 t ADT: 15,800

PR 9921

Fair

Over: HUMACAO RIVER

3.5 KM SOUTH LAS PIEDRAS, Las Piedras, PR

Built 1969 Load: 23.6 t ADT: 1,400

Rt 109

Fair

Over: UNNAMED DRAINAGE

LAGUNA PLAYA GRANDE, Vieques, PR

Built 2009 Load: 23.6 t ADT: 1

PR 102 AT KM 5.7

Fair

Over: W Way Corazones River

3.65 km S.West May Town, Mayagüez, PR

Built 2015 Load: 23.7 t ADT: 10,977

PR 165

Fair

Over: COCAL RIVER

5 KM EAST OF DORADO, Toa Baja, PR

Built 1959 Load: 23.7 t ADT: 20,300

OFF PR 131 KM 2

Fair

Over: GUILARTE RIVER

OFF PR 131 AT KM 1.6, Adjuntas, PR

Built 1983 Load: 23.8 t ADT: 300

PR 183

Fair

Over: VALENCIANO RIVER

INTERSECTION PR 917, Las Piedras, PR

Built 1947 Load: 23.8 t ADT: 12,700

PR 105

Fair

Over: CARICOSA CREEK

3 KM EAST OF MAYAGUEZ, Mayagüez, PR

Built 1921 Load: 24.0 t ADT: 2,600

PR 157

Fair

Over: MATRULLAS RIVER

10 KM WEST OF OROCOVIS, Orocovis, PR

Built 1959 Load: 24.0 t ADT: 2,279

OFF PR 330

Fair

Over: DUEY RIVER

6 KMS.EAST OF HORMIGUEROS, Hormigueros, PR

Built 1999 Load: 24.1 t ADT: 100

OFF PR 135 KM 75.4

Fair

Over: GUILARTE RIVER

2.9 KM E INT PR 129 &, Adjuntas, PR

Built 1978 Load: 24.2 t ADT: 200

OFF PR 730 KM 3.9

Fair

Over: MATON RIVER

4 KM NORTHWEST CAYEY, Cayey, PR

Built 2004 Load: 24.2 t ADT: 100

PR 102

Fair

Over: MAJAGUAL CHANNEL

ON MAYAGUEZ BAY, Mayagüez, PR

Built 1952 Load: 24.2 t ADT: 10,500

PR 9973

Fair

Over: UNKNOWN CREEK

5 MILES N E OF NAGUABO, Naguabo, PR

Built 1972 Load: 24.2 t ADT: 4,200

PR 184

Fair

Over: IRRIGATION CHANNEL

2.5 KM N W OF PATILLAS, Patillas, PR

Built 1939 Load: 24.2 t ADT: 1,700

PR 109

Fair

Over: UNNAMED CREEK

8 KM EAST OF A¥ASCO, Añasco, PR

Built 1950 Load: 24.4 t ADT: 3,600

PR 971

Fair

Over: SANTIAGO RIVER

3.5 KM NORTH OF NAGUABO, Naguabo, PR

Built 1954 Load: 24.4 t ADT: 3,600

PR 165

Fair

Over: LA MALARIA CHANNEL

2 KM WEST OF CATA¥O, Cataño, PR

Built 1972 Load: 24.5 t ADT: 33,900

PR 116

Fair

Over: CHANNEL

LAJAS FINCA RICETEC, Lajas, PR

Built 1966 Load: 24.5 t ADT: 5,900

PR 867

Fair

Over: CHANNEL

1 KM EAST OF TOA BAJA, Toa Baja, PR

Built 1980 Load: 24.5 t ADT: 19,200

PR 123

Fair

Over: WATERWAY

15 KM S E OF ARECIBO, Utuado, PR

Built 1940 Load: 24.7 t ADT: 488

PR 156

Fair

Over: LA PLATA RIVER

2.3 KM N E OF COMERIO, Comerío, PR

Built 1991 Load: 24.8 t ADT: 3,600

PR 742

Fair

Over: FARALLON RIVER

8 KM SOUTH EAST OF CAYEY, Guayama, PR

Built 1975 Load: 24.8 t ADT: 1,400

PR 2 EASTBOUND

Fair

Over: WATERWAY

3.5 KM S E OF GUAYANILLA, Guayanilla, PR

Built 1968 Load: 24.8 t ADT: 16,650

PR 2 WESTBOUND

Fair

Over: WATERWAY

3.5 KM S E OF GUAYANILLA, Ponce, PR

Built 1968 Load: 24.8 t ADT: 16,650

PR 500

Fair

Over: PASTILLO RIVER

2.1 KM WEST OF PONCE, Ponce, PR

Built 1993 Load: 24.8 t ADT: 20,400

PR 14

Fair

Over: DITCH

NORTH EAST OF PONCE, Ponce, PR

Built 2006 Load: 24.8 t ADT: 17,500

DE DIEGO AVENUE

Fair

Over: DO%A ANA CREEK

REPARTO METROPOLITANO RP, San Juan, PR

Built 1955 Load: 24.8 t ADT: 20,199

OFF PR 125

Fair

Over: CULEBRINAS RIVER

0.5 KM S OF SAN SEBASTIAN, San Sebastián, PR

Built 1979 Load: 24.8 t ADT: 12,000

PR 181

Fair

Over: EMAJAGUA CREEK

12 KM SOUTH SAN LORENZO, San Lorenzo, PR

Built 1939 Load: 24.9 t ADT: 6,300

PR 182

Fair

Over: AGUAS LARGAS CREEK

1.7 KM WEST OF YABUCOA, Yabucoa, PR

Built 1946 Load: 25.0 t ADT: 7,300

OFF PR 381@ K1.15

Fair

Over: HONDA CREEK

6 KM North Guayanilla, Guayanilla, PR

Built 2003 Load: 25.1 t ADT: 100

29 STREET S.E.

Fair

Over: DO¥A ANA CREEK

0.05KM OF A. MIRANDA AVE., San Juan, PR

Built 1955 Load: 25.1 t ADT: 8,500

PR 5553

Fair

Over: CAONILLAS RIVER

5.5 KMS.N.E. OF VILLALBA, Villalba, PR

Built 1998 Load: 25.1 t ADT: 300

PR 102

Fair

Over: LAGUNA CHANNEL

5 KM N W OF CABO ROJO, Cabo Rojo, PR

Built 2003 Load: 25.2 t ADT: 5,900

PR 164

Fair

Over: ANONES CREEK

2 KM EAST OF NARANJITO, Naranjito, PR

Built 1913 Load: 25.2 t ADT: 2,400

PR 2

Fair

Over: DUEY RIVER

4 KM NOREAST OF S GERMAN, San Germán, PR

Built 2010 Load: 25.2 t ADT: 35,000

PR 109

Fair

Over: UNNAMED WATERWAY

8.7 KM EAST OF A¥ASC, Añasco, PR

Built 1939 Load: 25.3 t ADT: 3,600

PR 186

Fair

Over: GRANDE RIVER

10 KM SOUTH OF INT PR 3, Río Grande, PR

Built 1941 Load: 25.3 t ADT: 200

PR 14

Fair

Over: SANTO DOMINGO CREEK

AT BALDORIOTY STREET, Cayey, PR

Built 1965 Load: 25.5 t ADT: 7,400

ALMENDRO STREET

Fair

Over: LAJAS RIVER

250 MTS OFF PR 677, Dorado, PR

Built 1977 Load: 25.5 t ADT: 300

PR 173

Fair

Over: GUAYNABO RIVER

6 KM NORTH AGUAS BUENAS, Guaynabo, PR

Built 1939 Load: 25.5 t ADT: 7,500

PR 504

Fair

Over: PORTUGUES RIVER

1.3 KM NORTHWEST OF PONCE, Ponce, PR

Built 1991 Load: 25.5 t ADT: 9,400

PR 368

Fair

Over: MACHUCHAL CREEK

4 KM S E OF SABANA GRANDE, Sabana Grande, PR

Built 1969 Load: 25.5 t ADT: 2,500

Showing 951-1,000 of 2,387 bridges

Data sourced from the FHWA National Bridge Inventory (NBI), latest released cycle. See our methodology for details. Retrieved and formatted by PlainBridges Editorial.

Disclaimer: This information is provided for informational purposes only and does not constitute professional advice. Data is sourced from the FHWA National Bridge Inventory (NBI). A "structurally deficient" rating is a repair-priority signal, not a closure or unsafe-to-cross designation. Consult a qualified civil engineer before making decisions based on this data.