State profile · Above national median SD

Puerto Rico bridge safety

Condition ratings, load ratings, and structural-deficiency data for every public highway bridge in Puerto Rico — drawn straight from the FHWA National Bridge Inventory.

2,387
Public bridges
14.1%
Good condition
12.0%
Poor condition
12.0%
Structurally deficient

Total Bridges

2,387

Public highway bridges in Puerto Rico

Good Condition

14.1%

336 bridges rated 7-9

-35.9pp vs 50% benchmark

Poor Condition

12.0%

286 bridges rated 0-4

Structurally Deficient

12.0%

286 bridges flagged for repair priority

5.0pp vs national avg 7.0%

Puerto Rico vs national bridge condition

Puerto Rico — Good condition share 14.1%
National avg

Share of bridges rated 7-9 on the FHWA 0-9 scale (deck, superstructure, substructure all good).

Puerto Rico — Structurally deficient share 39.9%
National avg

Lower is better. Bar maxes at 30% (worst-state ceiling). National average sits at 7.0%.

Puerto Rico vs nearby ranks

Adjacent states on the structurally deficient leaderboard (lower share = better)

States are ranked by share of bridges flagged structurally deficient — the FHWA classification for any span where deck, superstructure, or substructure carries a condition rating of 4 or below. Lower percentages indicate stronger maintenance funding and inspection follow-through. States here sit immediately above and below Puerto Rico on the same metric.

38

North Dakota

10.84% top marginal rate
Structure
Progressive
Burden @ $100K
$4,242

22

Louisiana

11.00% top marginal rate
Structure
Progressive
Burden @ $100K
$12,699
Selected

72

Puerto Rico

11.98% top marginal rate
Structure
Progressive
Burden @ $100K
$2,387

23

Maine

13.23% top marginal rate
Structure
Progressive
Burden @ $100K
$771

66

Guam

15.25% top marginal rate
Structure
Progressive
Burden @ $100K
$59

Bridges Needing Most Attention in Puerto Rico

Six lowest-condition bridges in Puerto Rico, ranked by composite NBI rating. Each is inspected at least every 24 months.

All Bridges in Puerto Rico

OFF PR 106 KM 2.2

Structurally Deficient

Over: YAGUEZ RIVER

3 KM EAST OF MAYAGUEZ, Mayagüez, PR

Built 1976 Load: 15.0 t ADT: 450

PR 5556

Structurally Deficient

Over: CUYON RIVER

1 KM EAST OF COAMO, Coamo, PR

Built 1992 Load: 15.6 t ADT: 5,100

OFF PR 110

Structurally Deficient

Over: CREEK

1.5 KM SOUTHEAST OF MOCA, Moca, PR

Built 1965 Load: 16.0 t ADT: 200

PR 7731

Structurally Deficient

Over: LA PLATA RIVER

2.6 KM NORTH OF CAYEY, Cayey, PR

Built 1935 Load: 17.3 t ADT: 500

LOS DOMINICOS AVE.

Structurally Deficient

Over: LEVITTOWN CHANNEL

5.6 KM WEST OF CATA¥, Toa Baja, PR

Built 1972 Load: 17.4 t ADT: 13,850

PR 348

Structurally Deficient

Over: NUEVE PASOS RIVER

5 KM N W OF SAN GERMAN, San Germán, PR

Built 1959 Load: 18.0 t ADT: 600

PR 2

Structurally Deficient

Over: ROSARIO RIVER

4 KM EAST OF HORMIGUEROS, Hormigueros, PR

Built 1964 Load: 19.1 t ADT: 35,000

PR 115

Structurally Deficient

Over: UNKNOWN CREEK

3 KMS WEST OF A¥ASCO, Añasco, PR

Built 1976 Load: 22.2 t ADT: 7,900

PR 765

Structurally Deficient

Over: BEATRIZ CREEK

5 KM SOUTH OF CAGUAS, Caguas, PR

Built 1961 Load: 22.2 t ADT: 12,500

PR 165

Structurally Deficient

Over: COCAL RIVER

7 KM EAST OF TOA BAJA, Toa Baja, PR

Built 1959 Load: 22.9 t ADT: 18,900

PR 867

Structurally Deficient

Over: CHANNEL

4.6 KM EAST OF TOA BAJA, Toa Baja, PR

Built 1980 Load: 23.0 t ADT: 19,200

PR 250

Structurally Deficient

Over: ENSENADA CHANNEL

SECTOR FULLADOSA, CULEBRA, Culebra, PR

Built 1979 Load: 25.1 t ADT: 4,500

PR 163 EASTBOUND

Structurally Deficient

Over: PORTUGUES RIVER

IN PONCE EAST INT PR 10, Ponce, PR

Built 1969 Load: 25.5 t ADT: 20,400

PR 646

Structurally Deficient

Over: INDIO RIVER

4 MILES SOUTH VEGA BAJA, Vega Baja, PR

Built 1968 Load: 27.0 t ADT: 800

PR 378

Structurally Deficient

Over: GUAYANILLA RIVER

9 KM NORTH OF GUAYANILLA, Guayanilla, PR

Built 1958 Load: 27.4 t ADT: 400

QUEBRADA CEIBA ST.

Structurally Deficient

Over: GUAYANES RIVER

3 KM NORTH OF PE¥UEL, Peñuelas, PR

Built 1976 Load: 27.4 t ADT: 900

LOCAL ROAD

Structurally Deficient

Over: DESCALABRADO RIVER

OFF PR 150, Coamo, PR

Built 1970 Load: 28.3 t ADT: 100

PR 951

Structurally Deficient

Over: ZEQUEIRA CHANNEL

3 KM SOUTH WEST OF LOIZA, Loíza, PR

Built 1924 Load: 29.1 t ADT: 4,100

PR 9929

Structurally Deficient

Over: CREEK

OFF PR 980 AT KM 10.6, San Lorenzo, PR

Built 1930 Load: 30.3 t ADT: 600

OFF PR 378 KM 3.8

Structurally Deficient

Over: GUAYANILLA RIVER

6 KM NORTH OF GUAYANILLA, Guayanilla, PR

Built 1977 Load: 31.0 t ADT: 150

OFF PR 377

Structurally Deficient

Over: CONSEJO CREEK

2 KM N W OF GUAYANILLA, Guayanilla, PR

Built 1984 Load: 31.7 t ADT: 100

PR 303

Structurally Deficient

Over: PLANTINA CREEK

6 KM SOUTH EAST OF LAJAS, Lajas, PR

Built 1960 Load: 34.1 t ADT: 3,700

PR 3

Structurally Deficient

Over: AGUACATE CREEK

5.5 KM N E OF YABUCOA, Yabucoa, PR

Built 1920 Load: 35.6 t ADT: 8,800

PR 111

Structurally Deficient

Over: UTUADO CREEK

BY PASS TO UTUADO TOWN, Utuado, PR

Built 1965 Load: 37.0 t ADT: 9,000

PR 920

Structurally Deficient

Over: WATERWAY

5.5 KM N W OF YABUCOA, Yabucoa, PR

Built 1973 Load: 39.1 t ADT: 2,000

LOCAL ROAD

Structurally Deficient

Over: MAJAGUAL CREEK

3 KM NORTH OF ARROYO, Arroyo, PR

Built 1955 Load: 42.4 t ADT: 400

OFF PR 190 KM 0

Structurally Deficient

Over: SUAREZ CHANNEL

OFF PR 26 AT KM 11.0, Carolina, PR

Built 1960 Load: 42.4 t ADT: 24,800

NOTRE DAME STREET

Structurally Deficient

Over: PIEDRAS RIVER

6 KM SOUTH OF SAN JUAN, San Juan, PR

Built 1965 Load: 43.4 t ADT: 11,200

PR 759

Structurally Deficient

Over: DE LOS CHINOS CREEK

2 MILES WEST OF MAUNABO, Maunabo, PR

Built 1945 Load: 45.4 t ADT: 5,800

PR 52

Structurally Deficient

Over: DIRT ROAD

2.5KM S E OF PONCE, Ponce, PR

Built 1995 Load: 46.4 t ADT: 50,800

PR 558

Structurally Deficient

Over: USABON RIVER

0.20 KM INT PR162 & P, Barranquitas, PR

Built 1968 Load: 47.1 t ADT: 400

2ND STREET

Structurally Deficient

Over: STREAM

FORMER 834 KM 4.8, Guaynabo, PR

Built 2001 Load: 47.3 t ADT: 100

PR 3

Structurally Deficient

Over: CEIBA CREEK

1.5 KM NORTH OF CEIBA, Ceiba, PR

Built 1918 Load: 49.8 t ADT: 4,900

PR 53

Structurally Deficient

Over: GRANDE DE PATILLAS RIVER

2.5 KM S.E. OF PATILLAS, Patillas, PR

Built 1994 Load: 55.3 t ADT: 5,800

PR 30 WESTBOUND

Structurally Deficient

Over: HUMACAO RIVER

1.2 KM S.W. LAS PIEDRAS, Las Piedras, PR

Built 1965 Load: 56.5 t ADT: 30,350

PR 108

Structurally Deficient

Over: GRANDE DE A¥ASCO RI

0.1 KM INT PR108 & PR, Añasco, PR

Built 1980 Load: 60.0 t ADT: 3,100

LAS LOZAS STREET

Structurally Deficient

Over: CAMUY RIVER

14.30 km. N.W. OF UTUADO, Utuado, PR

Built 2010 Load: 67.7 t ADT: 300

Showing 2,351-2,387 of 2,387 bridges

Data sourced from the FHWA National Bridge Inventory (NBI), latest released cycle. See our methodology for details. Retrieved and formatted by PlainBridges Editorial.

Disclaimer: This information is provided for informational purposes only and does not constitute professional advice. Data is sourced from the FHWA National Bridge Inventory (NBI). A "structurally deficient" rating is a repair-priority signal, not a closure or unsafe-to-cross designation. Consult a qualified civil engineer before making decisions based on this data.