State profile · Above national median SD

Puerto Rico bridge safety

Condition ratings, load ratings, and structural-deficiency data for every public highway bridge in Puerto Rico — drawn straight from the FHWA National Bridge Inventory.

2,387
Public bridges
14.1%
Good condition
12.0%
Poor condition
12.0%
Structurally deficient

Total Bridges

2,387

Public highway bridges in Puerto Rico

Good Condition

14.1%

336 bridges rated 7-9

-35.9pp vs 50% benchmark

Poor Condition

12.0%

286 bridges rated 0-4

Structurally Deficient

12.0%

286 bridges flagged for repair priority

5.0pp vs national avg 7.0%

Puerto Rico vs national bridge condition

Puerto Rico — Good condition share 14.1%
National avg

Share of bridges rated 7-9 on the FHWA 0-9 scale (deck, superstructure, substructure all good).

Puerto Rico — Structurally deficient share 39.9%
National avg

Lower is better. Bar maxes at 30% (worst-state ceiling). National average sits at 7.0%.

Puerto Rico vs nearby ranks

Adjacent states on the structurally deficient leaderboard (lower share = better)

States are ranked by share of bridges flagged structurally deficient — the FHWA classification for any span where deck, superstructure, or substructure carries a condition rating of 4 or below. Lower percentages indicate stronger maintenance funding and inspection follow-through. States here sit immediately above and below Puerto Rico on the same metric.

38

North Dakota

10.84% top marginal rate
Structure
Progressive
Burden @ $100K
$4,242

22

Louisiana

11.00% top marginal rate
Structure
Progressive
Burden @ $100K
$12,699
Selected

72

Puerto Rico

11.98% top marginal rate
Structure
Progressive
Burden @ $100K
$2,387

23

Maine

13.23% top marginal rate
Structure
Progressive
Burden @ $100K
$771

66

Guam

15.25% top marginal rate
Structure
Progressive
Burden @ $100K
$59

Bridges Needing Most Attention in Puerto Rico

Six lowest-condition bridges in Puerto Rico, ranked by composite NBI rating. Each is inspected at least every 24 months.

All Bridges in Puerto Rico

MARGINAL 17

Good

Over: PONNOCK CREEK

100M E MALL ENTRANCE, San Juan, PR

Built 2014 Load: 20.5 t ADT: 40,000

OFF PR 184

Good

Over: GRANDE DE PATILLAS RIVER

6 km NW OF PATILLAS, Patillas, PR

Built 1991 Load: 20.8 t ADT: 100

PR 613

Good

Over: WATERWAY

12 KM NORTH OF JAYUYA, Jayuya, PR

Built 1972 Load: 20.9 t ADT: 500

PR 156

Good

Over: HONDO RIVER

2 kms West of Comerio, Comerío, PR

Built 2001 Load: 21.4 t ADT: 1,200

PR 20

Good

Over: FRAILES CREEK

4.40 KM NW OF GUAYNABO, Guaynabo, PR

Built 2012 Load: 21.9 t ADT: 85,400

PR 204

Good

Over: CEIBA NORTE CREEK

2.59 KM. SW. LAS PIEDRAS, Las Piedras, PR

Built 2011 Load: 21.9 t ADT: 10,800

PR-52

Good

Over: ACCESS ROAD

PR-52 KM 12.5, Caguas, PR

Built 2020 Load: 22.0 t ADT: 51,000

RURAL LOCAL ROAD

Good

Over: CULEBRA CREEK

4.5 KM EAST RIO GRANDE, Río Grande, PR

Built 2005 Load: 22.2 t ADT: 100

PR 9901

Good

Over: CAMINO NUEVO CREEK

7.15 Km NW OF YABUCOA, Yabucoa, PR

Built 2013 Load: 22.9 t ADT: 7,135

OFF PR 185 AT 4.5

Good

Over: WATERWAY

4 KMS STH OF CANOVANAS, Canóvanas, PR

Built 2009 Load: 23.7 t ADT: 100

OFF PR 179 AT K1.5

Good

Over: GUAMANI RIVER

2 KM. NORTH OF GUAYAMA, Guayama, PR

Built 1996 Load: 23.8 t ADT: 550

PR-66

Good

Over: Las Lajas River

3 Km SW Rio Grande, Río Grande, PR

Built 2012 Load: 24.2 t ADT: 22,863

OFF PR957 KM. 0.15

Good

Over: UNKNOWN CREEK

4.54 KM. SE. OF CANOVANAS, Canóvanas, PR

Built 2011 Load: 24.5 t ADT: 100

PR 188

Good

Over: GALLARDO CHANNEL

2 KM SOUTH OF LOIZA, Loíza, PR

Built 1961 Load: 24.5 t ADT: 10,300

PR 2

Good

Over: IRRIGATION DITCH

2.2 KM WEST OF AÑASC, Añasco, PR

Built 1960 Load: 24.7 t ADT: 34,600

PR 18

Good

Over: LOS MUERTOS CREEK

RAMP FROM HATO REY TO S J, San Juan, PR

Built 1975 Load: 25.5 t ADT: 187,900

OFF PR 997 AT 3.15

Good

Over: UNNAMED CREEK

5.0 KM SOUTH VIEQUES, Vieques, PR

Built 2014 Load: 25.9 t ADT: 250

PR 165R

Good

Over: WATERWAY PLUVIAL CONTROL

1.5 KM N W OF TOA ALTA, Dorado, PR

Built 1995 Load: 26.1 t ADT: 8,200

PR 778

Good

Over: WATERWAY

1.2 KMS S.W. OF COMERIO, Comerío, PR

Built 2010 Load: 26.6 t ADT: 1,000

PR 10

Good

Over: UNNAMED CREEK

3.20 KM. SW. OF UTUADO., Utuado, PR

Built 2012 Load: 27.0 t ADT: 7,600

PR 10

Good

Over: DIRT ROAD

3.4 KMS. SW. OF UTUADO, Utuado, PR

Built 2009 Load: 27.0 t ADT: 7,600

PR 509

Good

Over: INABON RIVER

3 KMS SWEST OF J DIAZ, Juana Díaz, PR

Built 2004 Load: 27.4 t ADT: 2,000

Aldea Vazquez St.

Good

Over: Los Negros River

_, Corozal, PR

Built 2015 Load: 27.5 t ADT: 3,900

OFF PR 132 KM 14.2

Good

Over: TALLABOA RIVER

2 KMS. EAST PENUELAS, Peñuelas, PR

Built 2005 Load: 27.8 t ADT: 16,900

CAMPOS STREET

Good

Over: PORTUGUES RIVER

AT PONCE CITY, Ponce, PR

Built 1986 Load: 27.8 t ADT: 200

PR 52

Good

Over: CALLE TULIP

PR 52 KM 2.8, San Juan, PR

Built 2020 Load: 28.0 t ADT: 120,300

Route 10

Good

Over: Unnamed Drainage

0.5 MI E OF RTE 997, Vieques, PR

Built 2009 Load: 28.1 t ADT: 100

OFF PR 368 AT 12.0

Good

Over: UNKNOWN CREEK

2 KM WEST OF YAUCO, Yauco, PR

Built 2000 Load: 28.1 t ADT: 100

PR 2

Good

Over: ACESS TO PR 2

0.48 KM. NE. OF AGUADILLA, Aguadilla, PR

Built 2012 Load: 28.2 t ADT: 43,000

OFF PR 149

Good

Over: JACAGUAS RIVER

1 KM. S.W. OF VILLALBA, Villalba, PR

Built 1999 Load: 28.4 t ADT: 100

PR 901

Good

Over: ARENAS CREEK

1 MILE S.E. OF MAUNABO, Maunabo, PR

Built 2000 Load: 28.5 t ADT: 13,442

PR 3336

Good

Over: RIO GUAYANILLA

SOUTH PR 2 KM 207, Guayanilla, PR

Built 2016 Load: 28.7 t ADT: 500

PR 111

Good

Over: GUATEMALA RIVER

1 KM N W OF SAN SEBASTIAN, San Sebastián, PR

Built 1978 Load: 28.8 t ADT: 19,100

PR 194

Good

Over: FAJARDO RIVER

0.8 KM NORTH OF INT PR 3, Fajardo, PR

Built 2005 Load: 29.0 t ADT: 22,200

STREET A

Good

Over: CREEK

OFF PR 14 AT KM 58.8, Cayey, PR

Built 2000 Load: 29.1 t ADT: 1,500

LOCAL ROAD

Good

Over: GUATEMALA RIVER

OFF PR 446 @ KM 1.5, San Sebastián, PR

Built 2009 Load: 29.1 t ADT: 200

PR 2

Good

Over: DITCH

3 KM NORTH OF MAYAGUEZ, Mayagüez, PR

Built 1960 Load: 29.2 t ADT: 43,400

PR-66

Good

Over: ANGOLA CREEK

3.65 KM. SW. OF R. GRANDE, Río Grande, PR

Built 2013 Load: 29.4 t ADT: 10,500

PR-615

Good

Over: RIO TURO NEGRO

PR-615 KM 3.6, Ciales, PR

Built 2020 Load: 29.5 t ADT: 1,400

PR 144

Good

Over: SANTA CATALINA CREEK

2 KM WEST OF JAYUYA, Jayuya, PR

Built 1991 Load: 29.7 t ADT: 7,200

OFF PR 335

Good

Over: YAUCO RIVER

_, Yauco, PR

Built 2011 Load: 29.7 t ADT: 100

PR 103

Good

Over: LAS TUNAS CREEK

0.4 KM NE INT PR307 &, Cabo Rojo, PR

Built 1983 Load: 29.8 t ADT: 5,000

OFF PR 149

Good

Over: LAS BRUJAS CREEK

0.1 K. FROM PR149 AT 63.6, Juana Díaz, PR

Built 2008 Load: 30.0 t ADT: 31,600

LOCAL ROAD

Good

Over: GRANDE DE MANATI RIVER

7.5 KM S W OF NARANJITO, Corozal, PR

Built 2006 Load: 30.4 t ADT: 100

PR 54

Good

Over: UNKNOWN CREEK

PR-54 INT. PR-744 KM 0.5, Guayama, PR

Built 1993 Load: 30.4 t ADT: 22,300

PR-18

Good

Over: PR-52 RAMP PR-18

PR-18, San Juan, PR

Built 2020 Load: 30.7 t ADT: 169,100

OFF PR 380

Good

Over: HONDO RIVER

3.8 KMS. SE. OF MAYAGUEZ, Mayagüez, PR

Built 1995 Load: 31.0 t ADT: 100

OFF PR 852

Good

Over: UNKNOWN CREEK

8KM SE OF TRUJILLO ALTO, Trujillo Alto, PR

Built 2003 Load: 31.4 t ADT: 100

PR 301

Good

Over: WATERWAY

11 KM SOUTH WEST OF LAJAS, Cabo Rojo, PR

Built 1981 Load: 31.6 t ADT: 5,500

PR 123

Good

Over: GRANDE DE ARECIBO RIVER

AT UTUADO TOWN, Utuado, PR

Built 1980 Load: 31.6 t ADT: 8,300

Showing 1,801-1,850 of 2,387 bridges

Data sourced from the FHWA National Bridge Inventory (NBI), latest released cycle. See our methodology for details. Retrieved and formatted by PlainBridges Editorial.

Disclaimer: This information is provided for informational purposes only and does not constitute professional advice. Data is sourced from the FHWA National Bridge Inventory (NBI). A "structurally deficient" rating is a repair-priority signal, not a closure or unsafe-to-cross designation. Consult a qualified civil engineer before making decisions based on this data.