State profile · Above national median SD

Puerto Rico bridge safety

Condition ratings, load ratings, and structural-deficiency data for every public highway bridge in Puerto Rico — drawn straight from the FHWA National Bridge Inventory.

2,387
Public bridges
14.1%
Good condition
12.0%
Poor condition
12.0%
Structurally deficient

Total Bridges

2,387

Public highway bridges in Puerto Rico

Good Condition

14.1%

336 bridges rated 7-9

-35.9pp vs 50% benchmark

Poor Condition

12.0%

286 bridges rated 0-4

Structurally Deficient

12.0%

286 bridges flagged for repair priority

5.0pp vs national avg 7.0%

Puerto Rico vs national bridge condition

Puerto Rico — Good condition share 14.1%
National avg

Share of bridges rated 7-9 on the FHWA 0-9 scale (deck, superstructure, substructure all good).

Puerto Rico — Structurally deficient share 39.9%
National avg

Lower is better. Bar maxes at 30% (worst-state ceiling). National average sits at 7.0%.

Puerto Rico vs nearby ranks

Adjacent states on the structurally deficient leaderboard (lower share = better)

States are ranked by share of bridges flagged structurally deficient — the FHWA classification for any span where deck, superstructure, or substructure carries a condition rating of 4 or below. Lower percentages indicate stronger maintenance funding and inspection follow-through. States here sit immediately above and below Puerto Rico on the same metric.

38

North Dakota

10.84% top marginal rate
Structure
Progressive
Burden @ $100K
$4,242

22

Louisiana

11.00% top marginal rate
Structure
Progressive
Burden @ $100K
$12,699
Selected

72

Puerto Rico

11.98% top marginal rate
Structure
Progressive
Burden @ $100K
$2,387

23

Maine

13.23% top marginal rate
Structure
Progressive
Burden @ $100K
$771

66

Guam

15.25% top marginal rate
Structure
Progressive
Burden @ $100K
$59

Bridges Needing Most Attention in Puerto Rico

Six lowest-condition bridges in Puerto Rico, ranked by composite NBI rating. Each is inspected at least every 24 months.

All Bridges in Puerto Rico

PR 5555

Good

Over: Orocovis River

0.71 KM NORTHEAST OROCOVI, Orocovis, PR

Built 2015 Load: 37.6 t ADT: 5,000

OFF AVE M.HIEDRA

Good

Over: PIEDRAS RIVER

4 KMS EAST OF GUAYNABO, San Juan, PR

Built 2005 Load: 37.9 t ADT: 150

OFF PR 376

Good

Over: BARRANCHIN CREEK

0.5 NORTHWEST OF YAUCO, Yauco, PR

Built 1988 Load: 37.9 t ADT: 320

PR 173

Good

Over: LA PLATA RIVER

5 KM. NE OF AIBONITO, Aibonito, PR

Built 1998 Load: 38.1 t ADT: 13,800

PR 357

Good

Over: MARICAO RIVER

1 MILE NORTH OF MARICAO, Maricao, PR

Built 1980 Load: 38.2 t ADT: 1,600

RAMP PR 18 TO PR21

Good

Over: RAMP PR 21 CENTRO MEDICO

RAMP 18 SB 21 WB, San Juan, PR

Built 2018 Load: 38.5 t ADT: 239,000

ISABEL SEGUNDA ST

Good

Over: HONDO RIVER

14 MT. NORTH OF CITY HALL, Bayamón, PR

Built 1994 Load: 38.9 t ADT: 400

PR 5513 AT 0.45 KM

Good

Over: Creek

Off PR 513 at 1.80, Villalba, PR

Built 2006 Load: 38.9 t ADT: 250

PR 178

Good

Over: NIGUA RIVER

0.8 KM INT PR 3 & PR, Arroyo, PR

Built 1988 Load: 39.0 t ADT: 7,500

PR 5

Good

Over: BUCHANNAN CHANNEL

3.5 KM SOUTH OF CATANO, Cataño, PR

Built 1943 Load: 39.2 t ADT: 48,500

PR 923

Good

Over: HUMACAO RIVER

3 KM SOUTHEAST OF HUMACAO, Humacao, PR

Built 1990 Load: 39.2 t ADT: 3,900

PR 181

Good

Over: IRRIGATION CHANNEL

PR 181 AT KM. 34.10, Patillas, PR

Built 2009 Load: 39.2 t ADT: 11,900

PR 114

Good

Over: GUANAJIBO RIVER

2 KM WEST OF HORMIGUEROS, Hormigueros, PR

Built 1989 Load: 39.4 t ADT: 10,100

PR 905

Good

Over: LOS SUSPIROS DITCH

3.2 KM NORTH OF YABUCOA, Yabucoa, PR

Built 1991 Load: 39.4 t ADT: 1,900

PR 905

Good

Over: DITCH

2 KM NORTH FROM YABUCOA, Yabucoa, PR

Built 1991 Load: 39.4 t ADT: 1,400

PR-52

Good

Over: LOCAL STREET RIO CA&

PR-52 KM 12.1, Caguas, PR

Built 2020 Load: 39.5 t ADT: 51,000

PR 936

Good

Over: BOQUERON CREEK

5.45 KM SE OF LAS PIEDRAS, Las Piedras, PR

Built 2009 Load: 39.5 t ADT: 5,100

PR-4494

Good

Over: WATERWAY

2.53 KM. S. OF ISABELA T., Isabela, PR

Built 2009 Load: 39.8 t ADT: 600

URBAN LOCAL ROAD

Good

Over: MABU CREEK

ROUTE TO HUMACAO, Humacao, PR

Built 2005 Load: 40.0 t ADT: 2,000

PR 511

Good

Over: INABON RIVER

10 KM N.W. OF JUANA DIAZ, Ponce, PR

Built 2003 Load: 40.0 t ADT: 1,900

PR 617

Good

Over: MOROVIS RIVER

0.2 KM. S.W. OF MOROVIS, Morovis, PR

Built 2005 Load: 40.3 t ADT: 4,600

PR 5557

Good

Over: CUYON RIVER

0.6 KM FROM PR 556 K1.3, Coamo, PR

Built 2006 Load: 40.5 t ADT: 1,000

BARAMAYA STREET

Good

Over: DEL AGUA CREEK

1 KM SOUTHWEST OF PONCE, Ponce, PR

Built 1996 Load: 40.5 t ADT: 21,100

PR 2

Good

Over: CONNECTOR TO PR-591

5.68 KMS. SW. OF PONCE, Ponce, PR

Built 2010 Load: 40.6 t ADT: 27,200

RAMP S PR 53 PR970

Good

Over: MAIZALES CREEK

3.5 KMS WEST OF NAGUABO, Naguabo, PR

Built 1998 Load: 41.2 t ADT: 10,000

OFF PR 562 KM 0.10

Good

Over: JACAGUAS RIVER

OFF PR 151 3.1 KM, Villalba, PR

Built 2018 Load: 41.3 t ADT: 200

OFF PR 203

Good

Over: GRANDE DE LOIZA RIVER

4.5 kM OF NW SAN LORENZO, San Lorenzo, PR

Built 2003 Load: 41.5 t

RTE. 010

Good

Over: LA CHIVA LAGOON

BLUE BEACH RD 9 EAST END, Vieques, PR

Built 2012 Load: 41.7 t ADT: 100

RAMP PR 9 W PR 123

Good

Over: Dirt Road

NB BRIDGE TO PR 10, Ponce, PR

Built 2018 Load: 42.0 t ADT: 15,500

PR 183

Good

Over: LAS BAMBUAS CREEK

2 KM EAST OF CAGUAS, Caguas, PR

Built 1999 Load: 42.4 t ADT: 25,100

OFF PR 913 KM 1.51

Good

Over: GRANDE DE PATILLAS RIVER

6.8 KMS SW SAN LORENZO, San Lorenzo, PR

Built 2012 Load: 42.6 t ADT: 100

PR 53

Good

Over: FRONTERAS CREEK

0.1 KM EAST HUMACAO, Humacao, PR

Built 1997 Load: 42.8 t ADT: 17,800

PR 203

Good

Over: NAVARRO CREEK

4.5 KM N.W. OF S. LORENZO, Gurabo, PR

Built 1998 Load: 42.9 t ADT: 17,900

PR-9920 Km.4.30

Good

Over: Waterway Unname Creek

10.66Km. S. San Lorenzo, San Lorenzo, PR

Built 2000 Load: 43.1 t ADT: 800

PR-66 EASTBOUND

Good

Over: Cambalache River

PR-66 AT KM. 14.30, Canóvanas, PR

Built 2012 Load: 43.8 t ADT: 22,863

PR-66 WESTBOUND

Good

Over: CAMBALACHE RIVER

PR-66, KM. 14.30, Canóvanas, PR

Built 2013 Load: 43.8 t ADT: 22,863

GUADALUPE ST.

Good

Over: PORTUGUES RIVER

AT PONCE TOWN (NORTH), Ponce, PR

Built 1994 Load: 43.8 t ADT: 7,500

OFF PR 5139 AT 2.1

Good

Over: CERRILLO RIVER

KM 0.1, Ponce, PR

Built 2009 Load: 43.8 t ADT: 100

PR 52

Good

Over: UNKNOWN CREEK

SOUTHWEST OF PONCE, Ponce, PR

Built 1996 Load: 44.1 t ADT: 18,800

PR 540

Good

Over: Cañas River

5.2 km NE JUANA DIAZ, Juana Díaz, PR

Built 2013 Load: 44.4 t ADT: 500

PR-66

Good

Over: Dirt Road

PR-66 Km.17.5, Río Grande, PR

Built 2013 Load: 44.5 t ADT: 10,500

PR-18

Good

Over: PR-21

PR18 KM 4.2, San Juan, PR

Built 2020 Load: 44.5 t ADT: 239,000

PR 2

Good

Over: CARRETERA HACIA EL TUQUE

AHEAD OVER EL TUQUE ROAD, Ponce, PR

Built 2020 Load: 45.0 t ADT: 49,800

PR-3

Good

Over: GUAMANI RIVER

3.50 KMS .S.W. OF GUAYAMA, Guayama, PR

Built 2012 Load: 46.0 t ADT: 14,100

OFF PR 184 @ 11.6

Good

Over: GRANDE DE PATILLAS RIVER

10 KM NW Patillas, Patillas, PR

Built 2012 Load: 46.1 t ADT: 100

PR-14

Good

Over: QUEBRADA TOITA

PR-14 65.3KM, Cayey, PR

Built 2020 Load: 46.2 t ADT: 5,400

PR 857

Good

Over: LAJAS CREEK

4.9 KM FROM PR 3, Carolina, PR

Built 2000 Load: 46.3 t ADT: 3,200

PR 3

Good

Over: LAS LAJAS CREEK

4.7 KMS EAST OF CANOVANAS, Río Grande, PR

Built 1998 Load: 46.3 t ADT: 36,700

PR 5155

Good

Over: OROCOVIS RIVER

0.5 KM SE OF OROCOVIS, Orocovis, PR

Built 2001 Load: 47.0 t ADT: 3,100

PR 2

Good

Over: HONDO RIVER

5 KM SOUTH OF MAYAGUEZ, Mayagüez, PR

Built 1961 Load: 47.3 t ADT: 55,800

Showing 1,901-1,950 of 2,387 bridges

Data sourced from the FHWA National Bridge Inventory (NBI), latest released cycle. See our methodology for details. Retrieved and formatted by PlainBridges Editorial.

Disclaimer: This information is provided for informational purposes only and does not constitute professional advice. Data is sourced from the FHWA National Bridge Inventory (NBI). A "structurally deficient" rating is a repair-priority signal, not a closure or unsafe-to-cross designation. Consult a qualified civil engineer before making decisions based on this data.