El Dorado County, CA

196 public highway bridges

El Dorado County Bridge Snapshot

El Dorado County, California contains 196 public highway bridges in the FHWA National Bridge Inventory. Roughly 39.3% are rated “Good,” 39.3% “Fair,” 5.1% “Poor,” and 5.1% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in CA are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

196
Total Bridges
39.3%
Good
5.1%
Poor
5.1%
Structurally Deficient

Condition Distribution

Good
39.3% (77)
Fair
39.3% (77)
Poor
5.1% (10)
SD
5.1% (10)

All Bridges (196)

NO DATA ENTERED

Fair

Over: CAMP CREEK

NO DATA ENTERED, El Dorado, CA

Built 1958 Load: 34.3 t ADT: 50

WINDING ROAD

Fair

Over: N.FORK COSUMNES

NO DATA ENTERED, El Dorado, CA

Built 1981 Load: 34.3 t ADT: 50

ICE HOUSE RD

Fair

Over: JONES FK SILVER CREEK

12.8 MI N OF US 50, El Dorado, CA

Built 1961 Load: 37.9 t ADT: 1,500

MT AUKUM RD

Fair

Over: CLEAR CREEK

.2 MI S/O PLEASANT VALY R, El Dorado, CA

Built 1967 Load: 38.9 t ADT: 2,959

SILVER FORK RD

Fair

Over: SOUTH FK AMERICAN RIVER

0.1 MI SE OF US 50, El Dorado, CA

Built 1953 Load: 39.5 t ADT: 285

SALMON FALLS RD

Fair

Over: NEW YORK CREEK

1.2 MI N GREEN VALLEY RD, El Dorado, CA

Built 1975 Load: 51.8 t ADT: 2,239

NEWTOWN RD

Fair

Over: SOUTH FORK WEBER CREEK

0.7 MI W OF SNOWS RD, El Dorado, CA

Built 1929 Load: 73.5 t ADT: 2,667

CAMP SACRAMENTO RD

Fair

Over: SOUTH FK AMERICAN RIVER

0.1 MI S/O U.S. 50, El Dorado, CA

Built 1988 Load: 78.1 t ADT: 80

BIG CUT RD

Fair

Over: WEBER CREEK

1.2 MI N/O PLEASANT V RD, El Dorado, CA

Built 1922 Load: 96.6 t ADT: 857

NO DATA ENTERED

Good

Over: PLUM CREEK

NO DATA ENTERED, El Dorado, CA

Built 2009 ADT: 50

WINDING ROAD

Good

Over: SLAB CREEK

NO DATA ENTERED, El Dorado, CA

Built 1972 ADT: 50

NO DATA ENTERED

Good

Over: WINDING ROAD

NO DATA ENTERED, El Dorado, CA

Built 1974 ADT: 50

WINDING ROAD

Good

Over: AMERICAN RIVER

NO DATA ENTERED, El Dorado, CA

Built 1938 ADT: 50

11N74

Good

Over: SOUTH FORK AMERICAN

NO DATA ENTERED, El Dorado, CA

Built 2004 ADT: 10

WINDING ROAD

Good

Over: SOUTH FORK AMERICAN RIVE

NO DATA ENTERED, El Dorado, CA

Built 2000 ADT: 10

PLUM CREEK RD

Good

Over: MILL CREEK

HWY 50 E TO 10N40 RD, El Dorado, CA

Built 2013 ADT: 75

FOUNTAIN PLACE RD

Good

Over: NO DATA ENTERED

NO DATA ENTERED, El Dorado, CA

Built 2018 ADT: 50

NO DATA ENTERED

Good

Over: NO DATA ENTERED

NO DATA ENTERED, El Dorado, CA

Built 2005 ADT: 50

NO DATA ENTERED

Good

Over: NO DATA ENTERED

NO DATA ENTERED, El Dorado, CA

Built 2005 ADT: 50

NO DATA ENTERED

Good

Over: NO DATA ENTERED

NO DATA ENTERED, El Dorado, CA

Built 2005 ADT: 50

WINDING ROAD

Good

Over: GERLE CREEK

NO DATA ENTERED, El Dorado, CA

Built 1969 Load: 10.0 t ADT: 50

ICE HOUSE RD

Good

Over: BIG SILVER CREEK

16.5 MI N OF US 50, El Dorado, CA

Built 1962 Load: 13.9 t ADT: 1,500

TRAVERSE CREEK RD

Good

Over: LOWER TRAVERSE CREEK

2.54 MI E OF S.R. 193, El Dorado, CA

Built 1930 Load: 15.2 t ADT: 500

CRYSTAL SPRINGS RD

Good

Over: E.I.D. CANAL

CARSON ROAD, El Dorado, CA

Built 1945 Load: 15.6 t ADT: 780

OAK HILL ROAD

Good

Over: SQUAW HOLLOW CREEK

0.6 MI S PLEASANT VALY RD, El Dorado, CA

Built 1945 Load: 17.2 t ADT: 1,985

WINDING ROAD

Good

Over: CAMP CREEK

NO DATA ENTERED, El Dorado, CA

Built 1976 Load: 18.5 t ADT: 50

11N46

Good

Over: SO. FORK AMER. RIVER

NO DATA ENTERED, El Dorado, CA

Built 1960 Load: 20.4 t ADT: 50

VENICE DR

Good

Over: VENICE BRIDGE (WIER)

0.1 MI EST OF CHRISTIE DR, El Dorado, CA

Built 1967 Load: 21.4 t ADT: 2,350

NORTH SOUTH ROAD

Good

Over: MIDDLE FORK CONSUMNES

NO DATA ENTERED, El Dorado, CA

Built 1998 Load: 22.4 t ADT: 50

U.S. HIGHWAY 50

Good

Over: CARSON CREEK

03-ED-050-R1.90L, El Dorado, CA

Built 1939 Load: 24.3 t ADT: 72,000

U.S. HIGHWAY 50

Good

Over: UPPER TRUCKEE RIVER

03-ED-050-70.31, El Dorado, CA

Built 1941 Load: 25.9 t ADT: 11,000

WINDING ROAD

Good

Over: STEELY FORK COSUMNES

NO DATA ENTERED, El Dorado, CA

Built 1975 Load: 25.9 t ADT: 50

U.S. HIGHWAY 50 WB

Good

Over: BASS LAKE ROAD

03-ED-050-R3.24, El Dorado, CA

Built 1966 Load: 26.9 t ADT: 60,000

WINDING ROAD

Good

Over: SILVER FORK AMER. RIVER

NO DATA ENTERED, El Dorado, CA

Built 1969 Load: 30.5 t ADT: 10

STATE ROUTE 49

Good

Over: HASTINGS CREEK

03-ED-049-28.19, El Dorado, CA

Built 1962 Load: 30.8 t ADT: 3,500

MOUNT AUKUM ROAD

Good

Over: NORTH FK COSUMNES RIVER

2.6 MI S PLEASANT VALY RD, El Dorado, CA

Built 1960 Load: 30.8 t ADT: 1,746

U.S. HIGHWAY 50

Good

Over: SOUTH FORK AMERICAN RIV

03-ED-050-39.68, El Dorado, CA

Built 1987 Load: 32.4 t ADT: 12,700

US HIGHWAY 50

Good

Over: UPPER TRUCKEE RIVER

03-ED-050-76.41-SLTO, El Dorado, CA

Built 1995 Load: 32.4 t ADT: 13,600

US HIGHWAY 50

Good

Over: TROUT CREEK

03-ED-050-77.33-SLTO, El Dorado, CA

Built 1995 Load: 32.4 t ADT: 13,600

US HIGHWAY 50

Good

Over: UPPER TRUCKEE RIVER

03-ED-050-72.66, El Dorado, CA

Built 1995 Load: 32.4 t ADT: 13,600

STATE ROUTE 193

Good

Over: S FK AMERICAN RIVER

03-ED-193-R24.65, El Dorado, CA

Built 1994 Load: 32.4 t ADT: 2,350

STATE ROUTE 49

Good

Over: HANGTOWN CREEK

03-ED-049-14.84-PLCR, El Dorado, CA

Built 1955 Load: 32.4 t ADT: 9,600

STATE ROUTE 89

Good

Over: HILLSIDE

03-ED-089-R17.53, El Dorado, CA

Built 1991 Load: 32.4 t ADT: 4,550

WB 50 OFF-RAMP

Good

Over: CARSON CREEK

03-ED-050-R1.90L, El Dorado, CA

Built 2015 Load: 32.4 t ADT: 4,000

U.S. HIGHWAY 50

Good

Over: MOUNTAINSIDE

03-ED-050-67.30, El Dorado, CA

Built 2020 Load: 32.4 t ADT: 8,900

U.S. HIGHWAY 50

Good

Over: RIDGEWAY DRIVE

03-ED-050-R28.84-PLKP, El Dorado, CA

Built 2021 Load: 32.4 t ADT: 18,700

U.S. HIGHWAY 50

Good

Over: PONDORADO ROAD

03-ED-050-23.51-CMNO, El Dorado, CA

Built 2022 Load: 32.4 t ADT: 27,000

Wildwood Way

Good

Over: S FORK AMERICAN RIVER

0.1MI EAST OF US 50, El Dorado, CA

Built 1997 Load: 32.4 t ADT: 30

GARDEN VALLEY ROAD

Good

Over: IRISH CREEK

1.5 MI NW OF S.R. 193., El Dorado, CA

Built 1997 Load: 32.4 t ADT: 485

SAND RIDGE RD

Good

Over: NORTH FK COSUMNES RIVER

0.1 MI E/O SR 49, El Dorado, CA

Built 1985 Load: 32.4 t ADT: 500

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial