El Dorado County, CA

196 public highway bridges

El Dorado County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, El Dorado County, California contains 196 public highway bridges. Roughly 39.3% are rated “Good,” 39.3% “Fair,” and 5.1% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

196
Total Bridges
39.3%
Good
39.3%
Fair
5.1%
Poor Condition

Condition Distribution

Good
39.3% (77)
Fair
39.3% (77)
Poor
5.1% (10)

All Bridges (196)

WHITE ROCK ROAD

Good

Over: CARSON CREEK TRIBUTARY

0.8 MI W OF LATROBE ROAD, El Dorado, CA

Built 2005 Load: 32.4 t ADT: 10,100

SERRANO PKWAY EAST

Good

Over: ALLEGHENY CREEK

EAST OF ED HILLS BLVD., El Dorado, CA

Built 1998 Load: 32.4 t ADT: 6,200

MARTIN AVENUE

Good

Over: TROUT CREEK

0.1 MI WEST OF BLACK BART, El Dorado, CA

Built 1998 Load: 32.4 t ADT: 4,220

PLACERVILLE DRIVE

Good

Over: HANGTOWN CREEK

20 M SOUTH OF HWY50, El Dorado, CA

Built 2007 Load: 32.4 t ADT: 8,000

BEDFORD AVE

Good

Over: HANGTOWN CREEK

50' SOUTH OF US 50, El Dorado, CA

Built 2009 Load: 32.4 t ADT: 10,000

RUBICON TRAIL

Good

Over: ELLIS CREEK

N OF LOON LAKE @RD 14N05, El Dorado, CA

Built 2013 Load: 32.4 t ADT: 100

WENTWORTH SPRGS RD

Good

Over: GERLE CREEK

W LOON LAKE,1 MI S 14N07, El Dorado, CA

Built 2013 Load: 32.4 t ADT: 100

HANKS EXCHANGE RD

Good

Over: SQUAW HOLLOW CREEK

0.4 MI S PLEASANT VALY RD, El Dorado, CA

Built 2020 Load: 32.4 t ADT: 1,245

CLEAR CREEK ROAD

Good

Over: CLEAR CREEK

0.25 MI E OF SLY PARK RD, El Dorado, CA

Built 2020 Load: 32.4 t ADT: 500

CLEAR CREEK ROAD

Good

Over: CLEAR CREEK

1.8 MI E OF SLY PARK RD, El Dorado, CA

Built 2020 Load: 32.4 t ADT: 400

GREENSTONE ROAD

Good

Over: SLATE CREEK

0.6 MI N OF MOTHERLODE DR, El Dorado, CA

Built 2020 Load: 32.4 t ADT: 1,284

GREEN VALLEY ROAD

Good

Over: TENNESSEE CREEK

N OF PEACEFUL GARDEN WAY, El Dorado, CA

Built 2012 Load: 32.4 t ADT: 15,010

BLAIRS LANE

Good

Over: HANGTOWN CREEK

SOUTH OF BROADWAY, El Dorado, CA

Built 2017 Load: 32.4 t ADT: 2,000

HAZEL VALLEY ROAD

Good

Over: E.I.D. CANAL

0.9 MI SE OF RTE 50, El Dorado, CA

Built 2019 Load: 32.4 t ADT: 15

WHITE ROCK ROAD

Good

Over: BUCKS RAVINE CREEK

0.9 MI E/O LATROBE ROAD, El Dorado, CA

Built 2014 Load: 32.4 t ADT: 9,442

TONG ROAD

Good

Over: CARSON CREEK

0.2 MI E/O SILVA VLY PKWY, El Dorado, CA

Built 2014 Load: 32.4 t ADT: 400

SLY PARK ROAD

Good

Over: CLEAR CREEK

BY JCT OF CLEAR CREEK RD, El Dorado, CA

Built 2020 Load: 32.4 t ADT: 3,600

BASSI ROAD

Good

Over: GRANITE CREEK

0.2 MILES N/W OF LOTUS RD, El Dorado, CA

Built 2020 Load: 32.4 t ADT: 1,542

FORT JIM RD

Good

Over: SOUTH FORK WEBER CREEK

JUST SW OF NEWTOWN RD, El Dorado, CA

Built 2018 Load: 32.4 t ADT: 396

LAKE TAHOE BLVD

Good

Over: ANGORA CREEK

NE OF MT RAINER DR, El Dorado, CA

Built 2010 Load: 32.4 t ADT: 3,000

MORMON EMIGRANT TR

Good

Over: JENKINSON LAKE SPILLWAY

0.9 MI E SLY PARK RD, El Dorado, CA

Built 1954 Load: 32.7 t ADT: 962

NO DATA ENTERED

Good

Over: TALLAC CREEK

NO DATA ENTERED, El Dorado, CA

Built 2009 Load: 32.7 t ADT: 50

STATE ROUTE 49

Good

Over: WEBER CREEK

03-ED-049-12.81, El Dorado, CA

Built 1967 Load: 33.4 t ADT: 9,600

STATE ROUTE 49

Good

Over: GREENWOOD CREEK

03-ED-049-26.82, El Dorado, CA

Built 1962 Load: 36.3 t ADT: 3,500

STATE ROUTE 89

Good

Over: TAYLOR CREEK

03-ED-089-12.03, El Dorado, CA

Built 1995 Load: 41.1 t ADT: 3,800

STATE ROUTE 89

Good

Over: CASCADE CREEK

03-ED-089-14.81, El Dorado, CA

Built 1995 Load: 41.1 t ADT: 2,034

NO DATA ENTERED

Good

Over: NO DATA ENTERED

NO DATA ENTERED, El Dorado, CA

Built 2004 Load: 41.8 t ADT: 50

WINDING ROAD

Good

Over: SOUTH FORK RUBICON

NO DATA ENTERED, El Dorado, CA

Built 1970 Load: 43.4 t ADT: 50

WINDING ROAD

Good

Over: GLEN ALPINE CREEK

NO DATA ENTERED, El Dorado, CA

Built 1988 Load: 46.0 t ADT: 50

NO DATA ENTERED

Good

Over: LYONS CREEK

NO DATA ENTERED, El Dorado, CA

Built 2010 Load: 46.7 t ADT: 50

11N26

Good

Over: SOUTH FORK SILVER CREEK

NO DATA ENTERED, El Dorado, CA

Built 2011 Load: 46.7 t ADT: 50

11N10

Good

Over: SOUTH FORK AMERICAN

NO DATA ENTERED, El Dorado, CA

Built 2010 Load: 46.7 t ADT: 50

HARRISON AVE

Good

Over: BOAT RAMP

1/8 MI E OF US 50, El Dorado, CA

Built 1975 Load: 50.5 t ADT: 2,095

U.S. HIGHWAY 50

Good

Over: P G AND E CANAL

03-ED-050-33.69, El Dorado, CA

Built 1946 Load: 52.8 t ADT: 12,700

WENTWORTH SPRGS RD

Good

Over: LAKE EDSON SPILLWAY

STUMPY MEADOWS RESERVOIR, El Dorado, CA

Built 1961 Load: 53.5 t ADT: 455

MT AUKUM RD

Good

Over: SPANISH CREEK

9.4 MI S PLEASANT VALY RD, El Dorado, CA

Built 1977 Load: 70.0 t ADT: 1,746

CONSUMNES MINE RD

Poor

Over: NORTH FK COSUMNES RIVER

4.0 MI N/O GRIZZILY FT RD, El Dorado, CA

Built 1958 ADT: 950

MOSQUITO RD

Poor

Over: SOUTH FK AMERICAN RIVER

5.7 MI NORTH OF US 50, El Dorado, CA

Built 1939 Load: 5.2 t ADT: 1,055

BREEDLOVE ROAD

Poor

Over: CANYON CREEK

1.0 MI N/O WENTWORTH S RD, El Dorado, CA

Built 1940 Load: 5.5 t ADT: 250

18023: MELSONS COR

Poor

Over: Perry Creek

10 mi SE of Placerville, El Dorado, CA

Built 1955 Load: 7.5 t ADT: 5

GRIZZLY FLAT ROAD

Poor

Over: STEELY FK COSUMNES RIVER

7.0 MI E OF MT AUKUM RD, El Dorado, CA

Built 1936 Load: 10.4 t ADT: 2,080

GREEN VALLEY ROAD

Poor

Over: MOUND SPRINGS CREEK

0.8 MI W MISSOURI FLAT R, El Dorado, CA

Built 1935 Load: 16.2 t ADT: 4,351

GARDEN VALLEY RD

Poor

Over: JOHNTOWN CREEK

3.5 MI NE OF S.R. 193, El Dorado, CA

Built 1928 Load: 16.8 t ADT: 1,391

GREENWOOD ROAD

Poor

Over: NORTH BRNCH GREENWOOD CR

0.3 MI S OF S.R. 193, El Dorado, CA

Built 1927 Load: 17.2 t ADT: 962

U.S. HIGHWAY 50

Poor

Over: SNOW ROAD

03-ED-050-25.26, El Dorado, CA

Built 1957 Load: 18.5 t ADT: 20,300

U.S. HIGHWAY 50

Poor

Over: SOUTH FORK AMERICAN RIV

03-ED-050-R44.12, El Dorado, CA

Built 1990 Load: 32.4 t ADT: 13,100
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.