Washington County, FL

99 public highway bridges

Washington County Bridge Snapshot

Washington County, Florida contains 99 public highway bridges in the FHWA National Bridge Inventory. Roughly 40.4% are rated “Good,” 40.4% “Fair,” 10.1% “Poor,” and 10.1% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in FL are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

99
Total Bridges
40.4%
Good
10.1%
Poor
10.1%
Structurally Deficient

Condition Distribution

Good
40.4% (40)
Fair
40.4% (40)
Poor
10.1% (10)
SD
10.1% (10)

All Bridges (99)

CR 279

Good

Over: Gum Creek

1.36Mi North of CR 280, Washington, FL

Built 1999 Load: 20.7 t ADT: 1,200

SR273

Good

Over: Helems Branch

0.6Mi East of SR77, Washington, FL

Built 1952 Load: 24.5 t ADT: 4,100

CR 278

Good

Over: Unnamed Branch

0.2Mi W of Orange Hill Rd, Washington, FL

Built 1951 Load: 26.3 t ADT: 900

CR 280

Good

Over: Holmes Creek

0.55 Mi W of CR 277, Washington, FL

Built 1992 Load: 26.5 t ADT: 750

CR 278

Good

Over: Reedy Creek

0.2 Mi West of SR 77, Washington, FL

Built 1958 Load: 27.2 t ADT: 900

SR77

Good

Over: Helems Branch

1.5Mi N. of US90 SR10, Washington, FL

Built 1992 Load: 30.8 t ADT: 3,800

SR79

Good

Over: Reedy Creek

4.1MI S. of CR284, Washington, FL

Built 2012 Load: 34.7 t ADT: 2,750

SR79

Good

Over: Cypress Creek

6.4 mi. South of SR8 I10, Washington, FL

Built 2015 Load: 34.9 t ADT: 3,400

SR79

Good

Over: Holmes Creek

0.1 Miles N. of CR277, Washington, FL

Built 2011 Load: 35.9 t ADT: 3,500

SR79

Good

Over: Holmes Creek

0.1 Miles N. of CR277, Washington, FL

Built 2012 Load: 35.9 t ADT: 3,500

Gainer Road

Good

Over: Flat Creek

0.2 Mi South of CR276, Washington, FL

Built 2014 Load: 35.9 t ADT: 100

CR 280

Good

Over: Open Creek

1.04 Mi W of SR 277, Washington, FL

Built 1995 Load: 36.3 t ADT: 800

SR79

Good

Over: Branch

1.1mi S of SR277, Washington, FL

Built 2019 Load: 37.2 t ADT: 5,672

SR79

Good

Over: Reedy Creek

4.1 Miles S. of CR284, Washington, FL

Built 2014 Load: 38.7 t ADT: 2,750

SR277

Good

Over: Stream

1.6 MI. North of SR79, Washington, FL

Built 1970 Load: 40.8 t ADT: 2,900

SR77

Good

Over: Hard Labor Creek

2.0MI N. OF Wausau, Washington, FL

Built 1992 Load: 40.8 t ADT: 5,444

CR278 (Pioneer Rd)

Good

Over: Piney Branch

0.3 Miles West of SR278, Washington, FL

Built 2021 Load: 40.8 t ADT: 1,000

CR 279

Good

Over: Cypress Creek

2 Mi N of State Rd 170, Washington, FL

Built 1960 Load: 41.7 t ADT: 1,700

SR 79

Good

Over: Branch

1.5mi. south of SR277, Washington, FL

Built 1984 Load: 41.7 t ADT: 6,500

SR79

Good

Over: Williams Branch

0.8 MI North of CR284, Washington, FL

Built 1962 Load: 41.8 t ADT: 4,800

Farrell Nelson Rd

Good

Over: Flat Creek

0.13 Mi S of Clayton Rd, Washington, FL

Built 2012 Load: 42.1 t ADT: 75

SR79

Good

Over: Cypress Creek

3.0mi. North of Vernon, Washington, FL

Built 1998 Load: 42.5 t ADT: 6,200

SR79

Good

Over: Open Creek

1.5 Miles S. of I10 SR8, Washington, FL

Built 2016 Load: 42.5 t ADT: 4,600

SR273

Good

Over: Alligator Creek

3.0MI NE of Chipley, Washington, FL

Built 1992 Load: 42.6 t ADT: 3,400

Merry Acres Dr.

Good

Over: Helms Branch

0.24Mi E of East Plum Ave, Washington, FL

Built 2015 Load: 42.8 t ADT: 60

SR77

Good

Over: Hard Labor Creek

2.0 Miles N. of Wausau, Washington, FL

Built 2020 Load: 43.5 t ADT: 8,900

SR77

Good

Over: Flat Creek

3.8Mi S of I10 SR8, Washington, FL

Built 2017 Load: 44.1 t ADT: 4,782

Duncan Cmty Road

Good

Over: Flat Creek

0.52 Mi South of CR 276, Washington, FL

Built 2013 Load: 44.5 t ADT: 50

River Road

Good

Over: Gum Creek

1.89 Mi South of CR 279, Washington, FL

Built 2013 Load: 44.5 t ADT: 900

Old Bonifay Rd

Good

Over: Holmes Creek

1.2 Mi West of Carr Road, Washington, FL

Built 2004 Load: 44.7 t ADT: 700

CR 173

Good

Over: Gum Creek

0.1 Mi North of Hwy 280, Washington, FL

Built 1964 Load: 48.1 t ADT: 650

SR79

Good

Over: Open Creek

1.5 Miles S. of I10 SR8, Washington, FL

Built 2008 Load: 48.1 t ADT: 6,400

CR 280

Good

Over: Pond Creek

1.46 Mi W of Pate Pond Rd, Washington, FL

Built 1999 Load: 48.1 t ADT: 600

Deltona Blvd

Good

Over: Godwin Branch

2.3 Mi S of Elkcam Blvd., Washington, FL

Built 2008 Load: 49.0 t ADT: 50

Deltona Blvd

Good

Over: Blakeny Branch

1.8Mi S of Elkcam Blvd, Washington, FL

Built 2008 Load: 49.0 t ADT: 50

Chain Lake Road

Good

Over: Pine Log Creek

3.59 MI W of SR 77, Washington, FL

Built 2011 Load: 50.8 t ADT: 68

US90 SR10

Good

Over: Cypress Slough

1.3 Miles E.of Countyline, Washington, FL

Built 2001 Load: 54.4 t ADT: 3,300

CR273 Orange Hill

Good

Over: Hard Labor Creek

1.46 Mi. S of CR 278, Washington, FL

Built 2023 Load: 57.2 t ADT: 3,200

Brown Street

Good

Over: Ditch

0.12 Mi S of E Jackson Av, Washington, FL

Built 1993 Load: 60.1 t ADT: 200

US90 SR10

Poor

Over: Holmes Creek

3.0Mi. West of SR277, Washington, FL

Built 1953 ADT: 4,381

Hard Labor Road

Poor

Over: Hard Labor Creek

1.37 Mi S of CR 267A, Washington, FL

Built 1990 Load: 3.7 t ADT: 60

CR278

Poor

Over: Hard Labor Creek

0.05 Mi S of Roland Rd, Washington, FL

Built 1958 Load: 14.9 t ADT: 850

CR 276A

Poor

Over: Holmes Creek

0.7 Mi West of CR 277, Washington, FL

Built 1971 Load: 30.8 t ADT: 1,000

CR 279

Poor

Over: Dram Branch

1.15 Mi South of I 10, Washington, FL

Built 1986 Load: 34.7 t ADT: 1,500

CR 278

Poor

Over: Branch of Holmes Creek

2.23 Mi East of SR277, Washington, FL

Built 1940 Load: 99.9 t ADT: 900

Williams Road

Structurally Deficient

Over: Alligator Creek

0.85 Mi West of Hwy 77, Washington, FL

Built 1979 Load: 11.8 t ADT: 50

CR 173

Structurally Deficient

Over: Gum Creek No. 2

0.5Mi N of Bess Nook Rd, Washington, FL

Built 1964 Load: 50.3 t ADT: 800

St Mary's Road

Structurally Deficient

Over: Little Dram Branch

0.1 Mi South of Clovis Rd, Washington, FL

Built 1993 Load: 60.1 t ADT: 100

CR 278

Structurally Deficient

Over: Unnamed Branch

0.25 Mi West of SR 77, Washington, FL

Built 1940 Load: 99.9 t ADT: 1,000

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial