Pecos County, TX
470 public highway bridges
Pecos County Bridge Snapshot
According to the Federal Highway Administration's 2024 National Bridge Inventory, Pecos County, Texas contains 470 public highway bridges. Roughly 60% are rated “Good,” 33% “Fair,” and 0.4% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.
Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.
Source: FHWA National Bridge Inventory. See methodology for full definitions.
Condition Distribution
All Bridges (470)
IH 10
GoodOver: DRAW
2.95 MI W OF SH 349, Pecos, TX
IH 10
GoodOver: DRAW
2.65 MI W OF SH 349, Pecos, TX
IH 10
GoodOver: DRAW
2.50 MI W OF SH 349, Pecos, TX
IH 10
GoodOver: DRAW
0.70 MI NW OF SH 349, Pecos, TX
IH 10
GoodOver: DRAW
0.15 MI E OF SH 349, Pecos, TX
IH 10
GoodOver: DRAW
1.50 MI SE OF SH 349, Pecos, TX
IH 10
GoodOver: DRAW
1.70 MI SE OF SH 349, Pecos, TX
SPUR 194
GoodOver: DRAW
0.80 MI SW OF US 385, Pecos, TX
SPUR 194
GoodOver: DRAW
0.40 MI SW OF US 385, Pecos, TX
SPUR 293
GoodOver: DRAW
0.2 MI W OF FM 11, Pecos, TX
SPUR 293
GoodOver: DRAW
0.60 MI E OF FM 11, Pecos, TX
Spur 293
GoodOver: Draw
1.20 Mi E of FM 11, Pecos, TX
US 190
GoodOver: Draw
0.40 Mi N of IH 10, Pecos, TX
SH 18
GoodOver: DRAW
1.05 MI S OF WARD C/L, Pecos, TX
SH 18
GoodOver: DRAW
2.10 MI S OF WARD C/L, Pecos, TX
SH 18
GoodOver: DRAW
3.70 MI S OF WARD C/L, Pecos, TX
SH 18
GoodOver: DRAW
1.40 MI S OF FM 1450, Pecos, TX
SH 18
GoodOver: COURTNEY CREEK
2.90 MI S OF FM 1450, Pecos, TX
SH 18
GoodOver: DRAW
8.60 MI S OF WARD C/L, Pecos, TX
SH 18
GoodOver: DRAW
10.00 MI S OF WARD C/L, Pecos, TX
SH 18
GoodOver: DRAW
12.55 MI N OF IH 10, Pecos, TX
SH 18
GoodOver: DRAW
9.85 MI N OF IH 10, Pecos, TX
SH 18
GoodOver: DRAW
0.25 MI N OF IH 10, Pecos, TX
US 285
GoodOver: DRAW
5.40 MI SE OF IH 10 BUS, Pecos, TX
US 285
GoodOver: DRAW
7.65 MI SE OF IH 10 BUS, Pecos, TX
US 285
GoodOver: DRAW
8.21 MI SE OF IH 10 BUS, Pecos, TX
US 285
GoodOver: DRAW
8.89 MI SE OF IH 10 BUS, Pecos, TX
US 285
GoodOver: DRAW
9.13 MI SE OF IH 10 BUS, Pecos, TX
US 285
GoodOver: DRAW
9.38 MI SE OF IH 10 BUS, Pecos, TX
US 285
GoodOver: DRAW
17.85 MI SE OF IH 10 BUS, Pecos, TX
US 285
GoodOver: DRAW
3.70 MI SE OF IH 10 BUS, Pecos, TX
US 285
GoodOver: DRAW
6.20 MI SE OF IH 10 BUS, Pecos, TX
US 285
GoodOver: Monument Draw
25.7 Mi SE of BI 10, Pecos, TX
US 285
GoodOver: DRAW
28.46 MI SE OF IH 10 BUS, Pecos, TX
US 285
GoodOver: DRAW
30.12 MI SE OF IH 10 BUS, Pecos, TX
US 285
GoodOver: DRAW
38.74 MI SE OF IH 10 BUS, Pecos, TX
US 285
GoodOver: Draw
13.0 Mi N of US 90, Pecos, TX
US 285
GoodOver: DRAW
1.70 MI N OF TERRELL C/L, Pecos, TX
IH 10 ML
GoodOver: DRAINAGE DITCH
9.10 MI E OF REEVES C/L, Pecos, TX
IH 10
GoodOver: DRAINAGE DITCH
10.60 MI E OF REEVES C/L, Pecos, TX
IH 10 N FR
GoodOver: DRAINAGE DITCH
0.45 MI E OF US 67, Pecos, TX
IH 10 WB
GoodOver: DRAIN
4.45 MI E OF REEVES C/L, Pecos, TX
IH 10
GoodOver: DRAIN
10.71 MI E OF REEVES C/L, Pecos, TX
IH 10 EB
GoodOver: DRAIN
5.57 MI E OF REEVES C/L, Pecos, TX
IH 10
GoodOver: DRAIN
6.28 MI E OF REEVES C/L, Pecos, TX
IH 10 WB
GoodOver: COYANOSA DRAW EAST REL
14.67 MI E OF REEVES C/L, Pecos, TX
IH 10 WB
GoodOver: DRAW
15.41 MI E OF REEVES C/L, Pecos, TX
IH 10 EB
GoodOver: DRAW
15.41 MI E OF REEVES C/L, Pecos, TX
IH 10 WB
GoodOver: DRAW
15.73 MI E OF REEVES C/L, Pecos, TX
IH 10 EB
GoodOver: DRAW
15.73 MI E OF REEVES C/L, Pecos, TX
Read our methodology - how this data is sourced, computed, and verified.
Related
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.