State profile · Above national median SD

Puerto Rico bridge safety

Condition ratings, load ratings, and structural-deficiency data for every public highway bridge in Puerto Rico — drawn straight from the FHWA National Bridge Inventory.

2,387
Public bridges
14.1%
Good condition
12.0%
Poor condition
12.0%
Structurally deficient

Total Bridges

2,387

Public highway bridges in Puerto Rico

Good Condition

14.1%

336 bridges rated 7-9

-35.9pp vs 50% benchmark

Poor Condition

12.0%

286 bridges rated 0-4

Structurally Deficient

12.0%

286 bridges flagged for repair priority

5.0pp vs national avg 7.0%

Puerto Rico vs national bridge condition

Puerto Rico — Good condition share 14.1%
National avg

Share of bridges rated 7-9 on the FHWA 0-9 scale (deck, superstructure, substructure all good).

Puerto Rico — Structurally deficient share 39.9%
National avg

Lower is better. Bar maxes at 30% (worst-state ceiling). National average sits at 7.0%.

Puerto Rico vs nearby ranks

Adjacent states on the structurally deficient leaderboard (lower share = better)

States are ranked by share of bridges flagged structurally deficient — the FHWA classification for any span where deck, superstructure, or substructure carries a condition rating of 4 or below. Lower percentages indicate stronger maintenance funding and inspection follow-through. States here sit immediately above and below Puerto Rico on the same metric.

38

North Dakota

10.84% top marginal rate
Structure
Progressive
Burden @ $100K
$4,242

22

Louisiana

11.00% top marginal rate
Structure
Progressive
Burden @ $100K
$12,699
Selected

72

Puerto Rico

11.98% top marginal rate
Structure
Progressive
Burden @ $100K
$2,387

23

Maine

13.23% top marginal rate
Structure
Progressive
Burden @ $100K
$771

66

Guam

15.25% top marginal rate
Structure
Progressive
Burden @ $100K
$59

Bridges Needing Most Attention in Puerto Rico

Six lowest-condition bridges in Puerto Rico, ranked by composite NBI rating. Each is inspected at least every 24 months.

All Bridges in Puerto Rico

PR 3306

Fair

Over: PARIS CREEK

3 MILES WEST OF LAJAS, Lajas, PR

Built 1958 Load: 27.9 t ADT: 800

PR 164

Fair

Over: CA%AS RIVER

3 KM N W OF NARANJITO, Naranjito, PR

Built 1925 Load: 27.9 t ADT: 3,900

PR 119

Fair

Over: CAMUY RIVER

2 KM EAST OF CAMUY, Camuy, PR

Built 1991 Load: 28.0 t ADT: 12,900

PR 556

Fair

Over: COAMO RIVER

0.71km North East Coamo, Coamo, PR

Built 1948 Load: 28.0 t ADT: 2,600

PR 31

Fair

Over: LA MINA CREEK

1 KM NORTH EAST OF JUNCOS, Juncos, PR

Built 1926 Load: 28.0 t ADT: 12,200

PR 181

Fair

Over: COQUI NO 2 CREEK

4 KM NORTH OF PATILLAS, Patillas, PR

Built 1940 Load: 28.0 t ADT: 600

PR 7757

Fair

Over: LOS POLLOS CREEK

1 MILE EAST OF PATILLAS, Patillas, PR

Built 1938 Load: 28.0 t ADT: 200

PR 608

Fair

Over: CIALITOS RIVER

16.5 KM S W OF CIALES, Ciales, PR

Built 1980 Load: 28.1 t ADT: 100

PR 836

Fair

Over: GUAYNABO RIVER

4 KMS. SOUTH OF GUAYNABO, Guaynabo, PR

Built 1954 Load: 28.1 t ADT: 10,000

PR 14

Fair

Over: JACAGUAS RIVER

1 KM NORTH OF JUANA DIAZ, Juana Díaz, PR

Built 1970 Load: 28.1 t ADT: 6,300

PR 854

Fair

Over: COCAL RIVER

BETWEEN DORADO & TOA, Toa Baja, PR

Built 1945 Load: 28.2 t ADT: 700

PR 510

Fair

Over: JACAGUAS RIVER

2.5 KM SOUTH JUANA DIAZ, Juana Díaz, PR

Built 1973 Load: 28.3 t ADT: 7,100

PR 386

Fair

Over: GUAYANES RIVER

1.5 KM NORTH OF PE¥U, Peñuelas, PR

Built 1969 Load: 28.4 t ADT: 3,820

BELMONTE STREET

Fair

Over: JUAN MENDEZ CREEK

ARANGES AND FERRAL STREET, San Juan, PR

Built 1951 Load: 28.4 t ADT: 3,200

PR 181

Fair

Over: LAJAS CREEK

11 KM SOUTH SAN LORENZO, San Lorenzo, PR

Built 1939 Load: 28.4 t ADT: 6,300

PR 1

Fair

Over: BAIROA RIVER

2.5 KM NORTH OF CAGUAS, Caguas, PR

Built 1947 Load: 28.5 t ADT: 33,100

PR 125

Fair

Over: GRANDE CREEK

1.7 KM SOUTH EAST OF MOCA, Moca, PR

Built 1921 Load: 28.5 t ADT: 4,800

VERGEL STREET

Fair

Over: JUAN MENDEZ CREEK

BLANES AND BISBAL STREET, San Juan, PR

Built 1950 Load: 28.5 t ADT: 1,000

PR 111R

Fair

Over: MATADERO CREEK

1 KM EAST OF UTUADO, Utuado, PR

Built 1925 Load: 28.5 t ADT: 28,500

PR 1

Fair

Over: MATON RIVER

2 KM SOUTH WEST OF CAYEY, Cayey, PR

Built 1927 Load: 28.6 t ADT: 10,100

PR 131

Fair

Over: GUILARTE RIVER

1.2 KM SOUTH INT PR 135, Adjuntas, PR

Built 1983 Load: 28.7 t ADT: 500

PR 924

Fair

Over: MAMBICHE BLANCO CREEK

3 MILES NORTH OF HUMACAO, Humacao, PR

Built 1971 Load: 28.8 t ADT: 7,600

PR 176

Fair

Over: CARRAIZO CREEK

9 KM S E OF TRUJILLO ALTO, San Juan, PR

Built 1940 Load: 28.8 t ADT: 4,000

PR 172

Fair

Over: NARANJITO CREEK

3 KM NORTHEAST OF COMERIO, Comerío, PR

Built 1920 Load: 29.1 t ADT: 1,500

PR 348

Fair

Over: GRANDE CREEK

1 KM S E OF MAYAGUEZ, Mayagüez, PR

Built 1970 Load: 29.1 t ADT: 8,500

PR 380

Fair

Over: HONDO RIVER

4 KM S E OF MAYAGUEZ, Mayagüez, PR

Built 1988 Load: 29.1 t ADT: 2,900

PR 504

Fair

Over: PORTUGUES RIVER

1 KM NORTH OF PONCE, Ponce, PR

Built 1992 Load: 29.1 t ADT: 1,000

JOSE DE DIEGO AVE.

Fair

Over: GUARALCANAL CREEK

50 MTS OF PR845 AT KM 1.5, San Juan, PR

Built 1990 Load: 29.1 t ADT: 5,800

PR 9910

Fair

Over: SANTIAGO CHANNEL

1 KM NORTH OF YABUCOA, Yabucoa, PR

Built 1919 Load: 29.1 t ADT: 6,600

PR 2

Fair

Over: FLORES RIVER

1.2 KM S W SABANA GRANDE, Sabana Grande, PR

Built 1972 Load: 29.3 t ADT: 24,600

PR 9905

Fair

Over: LIMONES RIVER

6.5 KM N.W. OF YABUCOA, Yabucoa, PR

Built 1981 Load: 29.3 t ADT: 1,500

PR 156

Fair

Over: ARROYATA RIVER

2.5 KM N E OF COMERIO, Comerío, PR

Built 1991 Load: 29.4 t ADT: 5,200

PR 3

Fair

Over: MAMEYES CREEK

6.2 KM WEST OF LUQUILLO, Luquillo, PR

Built 1978 Load: 29.4 t ADT: 36,100

PR 712

Fair

Over: MAJADA RIVER

5 KM EAST OF INT PR 1, Salinas, PR

Built 1984 Load: 29.4 t ADT: 3,442

PR 111

Fair

Over: CREEK

5.5 KM S E OF UTUADO, Utuado, PR

Built 1975 Load: 29.4 t ADT: 4,573

PR 200R

Fair

Over: WATERWAY

IN ISABEL II, VIEQUES, Vieques, PR

Built 1930 Load: 29.4 t ADT: 10,300

CONSTITUCION AVE.

Fair

Over: CHANNEL

AT MARTELL HOUSING DEV, Arecibo, PR

Built 1955 Load: 29.5 t ADT: 14,100

PR 147

Fair

Over: GUADIANA RIVER

3 KM N E OF NARANJITO, Naranjito, PR

Built 1998 Load: 29.6 t ADT: 14,000

PR 823

Fair

Over: UNNAMED CREEK

5 KM S W OF TOA ALTA, Toa Alta, PR

Built 1945 Load: 29.6 t ADT: 600

PR 123

Fair

Over: GRANDE DE ARECIBO RIVER

13.3 KM S E OF ARECIBO, Arecibo, PR

Built 1994 Load: 29.7 t ADT: 1,100

PR 857

Fair

Over: CANOVANILLAS RIVER

5 MILES SOUTH OF CAROLINA, Carolina, PR

Built 1963 Load: 29.7 t ADT: 2,700

CENTRAL AVENUE

Fair

Over: UNNAMED CREEK

ON CAYEY TOWN, Cayey, PR

Built 1994 Load: 29.7 t ADT: 8,500

PR 991

Fair

Over: SABANA RIVER

1.7 KM SOUTH OF LUQUILLO, Luquillo, PR

Built 1950 Load: 29.7 t ADT: 4,900

PR 133

Fair

Over: PORTUGUES RIVER

1.2 KM W OF INT PR1 &, Ponce, PR

Built 1986 Load: 29.7 t ADT: 12,600

PR 9959

Fair

Over: CANOVANAS RIVER

0.1 KM INT PR 3 & PR, Canóvanas, PR

Built 1989 Load: 29.8 t ADT: 14,400

CONNECT PR123 @518

Fair

Over: CIDRA RIVER

0.2 KM S.E. ADJUNTAS, Adjuntas, PR

Built 2000 Load: 29.9 t ADT: 10,800

LOCAL ROAD

Fair

Over: SAN ANTONIO RIVER

5 KM WEST OF MARICAO, Maricao, PR

Built 1960 Load: 29.9 t ADT: 400

OFF PR 128 KM 31.7

Fair

Over: UNNAMED CREEK

10.33 KM. S.E. OF MARICAO, Maricao, PR

Built 2013 Load: 29.9 t ADT: 100

PR 160

Fair

Over: MUERE SOLO CREEK

7 KM SOUTH OF VEGA BAJA, Vega Baja, PR

Built 1924 Load: 29.9 t ADT: 5,500

PR 818

Fair

Over: CIBUCO RIVER

2 KM NORTHWEST OF COROZAL, Corozal, PR

Built 1949 Load: 30.0 t ADT: 8,491

Showing 1,051-1,100 of 2,387 bridges

Data sourced from the FHWA National Bridge Inventory (NBI), latest released cycle. See our methodology for details. Retrieved and formatted by PlainBridges Editorial.

Disclaimer: This information is provided for informational purposes only and does not constitute professional advice. Data is sourced from the FHWA National Bridge Inventory (NBI). A "structurally deficient" rating is a repair-priority signal, not a closure or unsafe-to-cross designation. Consult a qualified civil engineer before making decisions based on this data.