State profile · Above national median SD

Puerto Rico bridge safety

Condition ratings, load ratings, and structural-deficiency data for every public highway bridge in Puerto Rico — drawn straight from the FHWA National Bridge Inventory.

2,387
Public bridges
14.1%
Good condition
12.0%
Poor condition
12.0%
Structurally deficient

Total Bridges

2,387

Public highway bridges in Puerto Rico

Good Condition

14.1%

336 bridges rated 7-9

-35.9pp vs 50% benchmark

Poor Condition

12.0%

286 bridges rated 0-4

Structurally Deficient

12.0%

286 bridges flagged for repair priority

5.0pp vs national avg 7.0%

Puerto Rico vs national bridge condition

Puerto Rico — Good condition share 14.1%
National avg

Share of bridges rated 7-9 on the FHWA 0-9 scale (deck, superstructure, substructure all good).

Puerto Rico — Structurally deficient share 39.9%
National avg

Lower is better. Bar maxes at 30% (worst-state ceiling). National average sits at 7.0%.

Puerto Rico vs nearby ranks

Adjacent states on the structurally deficient leaderboard (lower share = better)

States are ranked by share of bridges flagged structurally deficient — the FHWA classification for any span where deck, superstructure, or substructure carries a condition rating of 4 or below. Lower percentages indicate stronger maintenance funding and inspection follow-through. States here sit immediately above and below Puerto Rico on the same metric.

38

North Dakota

10.84% top marginal rate
Structure
Progressive
Burden @ $100K
$4,242

22

Louisiana

11.00% top marginal rate
Structure
Progressive
Burden @ $100K
$12,699
Selected

72

Puerto Rico

11.98% top marginal rate
Structure
Progressive
Burden @ $100K
$2,387

23

Maine

13.23% top marginal rate
Structure
Progressive
Burden @ $100K
$771

66

Guam

15.25% top marginal rate
Structure
Progressive
Burden @ $100K
$59

Bridges Needing Most Attention in Puerto Rico

Six lowest-condition bridges in Puerto Rico, ranked by composite NBI rating. Each is inspected at least every 24 months.

All Bridges in Puerto Rico

PR 2

Fair

Over: CATTLE PASS

4 KM SE OF SABANA GRANDE, Sabana Grande, PR

Built 1979 Load: 42.0 t ADT: 24,536

CAM LOS NUñEZ

Fair

Over: STREAM

250M FROM PR-852 KM 3.2, Trujillo Alto, PR

Built 1990 Load: 42.0 t ADT: 500

OFF PR 784

Fair

Over: CA¥ABONCITO RIVER

2 KM AT SW OF CAGUAS, Caguas, PR

Built 1998 Load: 42.1 t ADT: 100

PR 2

Fair

Over: LOCO RIVER

4 KM SOUTH WEST OF YAUCO, Guánica, PR

Built 1976 Load: 42.1 t ADT: 26,819

PR 199

Fair

Over: PIEDRAS RIVER

200 MTS FROM INT PR 52, San Juan, PR

Built 1987 Load: 42.1 t ADT: 33,100

PR-311 Km. 7.55

Fair

Over: QUEBRADA

CABO ROJO, Cabo Rojo, PR

Built 1901 Load: 42.2 t ADT: 2,700

ALHMBRA GRNDA BLV

Fair

Over: CREEK TO RIO TURBADO

NORTHSIDE 4 POINTS CASINO, Caguas, PR

Built 1901 Load: 42.3 t ADT: 500

PR 30R

Fair

Over: CATTLE PASS

2 KM NORTHWEST OF HUMACAO, Humacao, PR

Built 1976 Load: 42.4 t ADT: 28,868

PR 147

Fair

Over: GUADIANA RIVER

AT NORTH OF NARANJITO, Naranjito, PR

Built 1981 Load: 42.4 t ADT: 13,700

PR 52 NORTHBOUND

Fair

Over: NIGUA RIVER

0.5 KM NORTH OF SALINAS, Salinas, PR

Built 1971 Load: 42.4 t ADT: 37,800

PR 52 SOUTHBOUND

Fair

Over: NIGUA RIVER

0.5 KM NORTH OF SALINAS, Salinas, PR

Built 1971 Load: 42.4 t ADT: 16,400

PR 52 NORTHBOUND

Fair

Over: QUEBRADILLAS CREEK

7 km SOUTH OF CAGUAS, Caguas, PR

Built 1972 Load: 42.5 t ADT: 29,800

PR 52 SOUTHBOUND

Fair

Over: QUEBRADILLAS CREEK

7 KM SOUTH OF CAGUAS, Caguas, PR

Built 1972 Load: 42.5 t ADT: 29,800

URDIALES STREET

Fair

Over: JUAN MENDEZ CREEK

SAN JOSE, RIO PIEDRAS, San Juan, PR

Built 1960 Load: 42.6 t ADT: 3,000

CAMPO RICO AVENUE

Fair

Over: BLASINA CHANNEL

CLOSE TO INT R.C. AVENUE, Carolina, PR

Built 1968 Load: 42.8 t ADT: 29,279

PR 169

Fair

Over: CAMARONES CREEK

3 KM S E OF GUAYNABO, Guaynabo, PR

Built 1921 Load: 42.8 t ADT: 16,200

PR 52 NORTHBOUND

Fair

Over: INABON RIVER

3 KM S W OF JUANA DIAZ, Juana Díaz, PR

Built 1970 Load: 42.8 t ADT: 54,600

PR 690

Fair

Over: WATERWAY

2.3 KM N W OF VEGA ALTA, Vega Alta, PR

Built 1981 Load: 42.8 t ADT: 10,300

PR 375

Fair

Over: GRANDE CREEK

7 kMS OF NORTHEAST YAUCO, Yauco, PR

Built 2002 Load: 42.8 t ADT: 100

PR 116

Fair

Over: LOCO RIVER

3 KM NE OF GUANICA, Guánica, PR

Built 2000 Load: 42.9 t ADT: 16,800

PR 121

Fair

Over: GUANAJIBO RIVER

2 KM S E OF SABANA GRANDE, Sabana Grande, PR

Built 1978 Load: 42.9 t ADT: 8,000

PR 3

Fair

Over: INGENIO RIVER

3.5 KM N E OF YABUCOA, Yabucoa, PR

Built 1918 Load: 42.9 t ADT: 8,600

PR 52 SOUTHBOUND

Fair

Over: CATTLE PASS

6 KM SOUTH WEST OF CAYEY, Cayey, PR

Built 1974 Load: 43.0 t ADT: 16,450

PR 52 NORTHBOUND

Fair

Over: CATTLE PASS

6 KM SOUTH WEST OF CAYEY, Cayey, PR

Built 1974 Load: 43.0 t ADT: 16,450

OFF PR 182@14.2

Fair

Over: GUAYANES RIVER

BO. GUAYABOTAS, SANCHEZ, Yabucoa, PR

Built 1973 Load: 43.0 t ADT: 100

PR 1116

Fair

Over: LOCO RIVER

3 KM SW OF YAUCO, Yauco, PR

Built 2000 Load: 43.0 t ADT: 13,500

PR 731

Fair

Over: SANTO DOMINGO CREEK

1.5 KM NORTH OF CAYEY, Cayey, PR

Built 1975 Load: 43.1 t ADT: 1,700

OFF PR 1 AT 51.5

Fair

Over: Beatriz Creek

0.1km from PR 1 KM 51.5, Cidra, PR

Built 2012 Load: 43.1 t ADT: 19,700

PR 30R

Fair

Over: MARIANA CREEK

1 KM SOUTHWEST OF HUMACAO, Humacao, PR

Built 1976 Load: 43.1 t ADT: 32,200

PR 386

Fair

Over: HOYO FRIO CREEK

3.3 KM NORTH OF PE¥U, Peñuelas, PR

Built 1945 Load: 43.1 t ADT: 400

PR 501

Fair

Over: CA¥AS RIVER

8 KM N E OF PE¥UELAS, Ponce, PR

Built 1974 Load: 43.1 t ADT: 500

PR 10

Fair

Over: RIO BUCANA

3KMS EAST OF PONCE, Ponce, PR

Built 1997 Load: 43.1 t ADT: 16,000

PR 53 SOUTHBOUND

Fair

Over: FUTURE ROAD

2.5 KM SOUTH OF FAJARDO, Fajardo, PR

Built 1994 Load: 43.2 t ADT: 9,550

PR 53 NORTHBOUND

Fair

Over: FUTURE ROAD

2.5 KM SOUTH OF FAJARDO, Fajardo, PR

Built 1993 Load: 43.2 t ADT: 9,550

PR 3

Fair

Over: MATA DE PLATANO CREEK

0.5 KM N W OF LUQUILLO, Luquillo, PR

Built 1984 Load: 43.2 t ADT: 33,800

ECUADOR STREET

Fair

Over: CERRO GORDO CREEK

ECUADOR ST, VILLA CONTESA, Bayamón, PR

Built 1960 Load: 43.4 t ADT: 6,500

PR 108

Fair

Over: CA%AS RIVER

5 KM N E OF MAYAGUEZ, Mayagüez, PR

Built 1975 Load: 43.6 t ADT: 2,600

PR 181

Fair

Over: WATERWAY

2.5 KM SOUTH SAN LORENZO, San Lorenzo, PR

Built 1930 Load: 43.6 t ADT: 2,600

PR 824

Fair

Over: CRUZ CREEK

4 KM SOUTH OF TOA ALTA, Toa Alta, PR

Built 1942 Load: 43.6 t ADT: 6,500

PR 53 EASTBOUND

Fair

Over: DEPRESSION

3 KM NORTHWEST OF GUAYAMA, Guayama, PR

Built 1994 Load: 43.7 t ADT: 7,900

PR 53 WESTBOUND

Fair

Over: DEPRESION

3 KM N W OF GUAYAMA, Guayama, PR

Built 1994 Load: 43.7 t ADT: 7,900

PR 149

Fair

Over: ACHIOTE CREEK

NORTH OF VILLALBA, Villalba, PR

Built 1991 Load: 43.7 t ADT: 24,400

PR 3

Fair

Over: CORTADORA CREEK

5 KM NORTH OF YABUCOA, Yabucoa, PR

Built 1918 Load: 43.7 t ADT: 11,300

PR 17

Fair

Over: JUAN MENDEZ CREEK

0.5 KM W OF BARBOSA AVE., San Juan, PR

Built 1981 Load: 43.8 t ADT: 64,400

PR 146

Fair

Over: CIALITOS RIVER

0.5 KM NORTH OF CIALES, Ciales, PR

Built 1973 Load: 44.0 t ADT: 4,800

PR 17 WESTBOUND

Fair

Over: PIEDRAS RIVER

EAST INT PR 18 AND PR 17, San Juan, PR

Built 1950 Load: 44.0 t ADT: 31,250

PR 159

Fair

Over: CIBUCO RIVER

6 KM WEST OF COROZAL, Corozal, PR

Built 1921 Load: 44.2 t ADT: 5,400

PR 832

Fair

Over: BAYAMON RIVER

6 KM SOUTHWEST OF BAYAMON, Bayamón, PR

Built 1971 Load: 44.4 t ADT: 15,900

PR 22 WESTBOUND

Fair

Over: DEPRESSION

2.40 SE. OF VEGA BAJA, Vega Baja, PR

Built 1995 Load: 44.5 t ADT: 32,550

PR 22 EASTBOUND

Fair

Over: DEPRESION

2.5 KM S.E. VEGA BAJA, Vega Baja, PR

Built 1995 Load: 44.5 t ADT: 35,050

Showing 1,401-1,450 of 2,387 bridges

Data sourced from the FHWA National Bridge Inventory (NBI), latest released cycle. See our methodology for details. Retrieved and formatted by PlainBridges Editorial.

Disclaimer: This information is provided for informational purposes only and does not constitute professional advice. Data is sourced from the FHWA National Bridge Inventory (NBI). A "structurally deficient" rating is a repair-priority signal, not a closure or unsafe-to-cross designation. Consult a qualified civil engineer before making decisions based on this data.