State profile · Above national median SD

Puerto Rico bridge safety

Condition ratings, load ratings, and structural-deficiency data for every public highway bridge in Puerto Rico — drawn straight from the FHWA National Bridge Inventory.

2,387
Public bridges
14.1%
Good condition
12.0%
Poor condition
12.0%
Structurally deficient

Total Bridges

2,387

Public highway bridges in Puerto Rico

Good Condition

14.1%

336 bridges rated 7-9

-35.9pp vs 50% benchmark

Poor Condition

12.0%

286 bridges rated 0-4

Structurally Deficient

12.0%

286 bridges flagged for repair priority

5.0pp vs national avg 7.0%

Puerto Rico vs national bridge condition

Puerto Rico — Good condition share 14.1%
National avg

Share of bridges rated 7-9 on the FHWA 0-9 scale (deck, superstructure, substructure all good).

Puerto Rico — Structurally deficient share 39.9%
National avg

Lower is better. Bar maxes at 30% (worst-state ceiling). National average sits at 7.0%.

Puerto Rico vs nearby ranks

Adjacent states on the structurally deficient leaderboard (lower share = better)

States are ranked by share of bridges flagged structurally deficient — the FHWA classification for any span where deck, superstructure, or substructure carries a condition rating of 4 or below. Lower percentages indicate stronger maintenance funding and inspection follow-through. States here sit immediately above and below Puerto Rico on the same metric.

38

North Dakota

10.84% top marginal rate
Structure
Progressive
Burden @ $100K
$4,242

22

Louisiana

11.00% top marginal rate
Structure
Progressive
Burden @ $100K
$12,699
Selected

72

Puerto Rico

11.98% top marginal rate
Structure
Progressive
Burden @ $100K
$2,387

23

Maine

13.23% top marginal rate
Structure
Progressive
Burden @ $100K
$771

66

Guam

15.25% top marginal rate
Structure
Progressive
Burden @ $100K
$59

Bridges Needing Most Attention in Puerto Rico

Six lowest-condition bridges in Puerto Rico, ranked by composite NBI rating. Each is inspected at least every 24 months.

All Bridges in Puerto Rico

PR 128

Fair

Over: BLANCO RIVER

7 KM SOUTH OF LARES, Lares, PR

Built 1920 Load: 50.9 t ADT: 700

PR 368

Fair

Over: GUANAJIBO RIVER

0.5 KM N E SABANA GRANDE, Sabana Grande, PR

Built 1987 Load: 50.9 t ADT: 6,300

10 STREET

Fair

Over: BUENA VISTA CREEK

VILLA NEVAREZ RIO PIEDRAS, San Juan, PR

Built 1950 Load: 50.9 t ADT: 1,250

LOCAL ROAD

Fair

Over: EMAJAGUA RIVER

100 MTS OFF PR 745, San Lorenzo, PR

Built 1964 Load: 50.9 t ADT: 1,400

PR 10

Fair

Over: PORTUGUES RIVER

3 KM NORTH OF PONCE, Ponce, PR

Built 1993 Load: 51.0 t ADT: 9,600

PR 504

Fair

Over: CHIQUITO RIVER

3 KM NORTH EAST OF PONCE, Ponce, PR

Built 1960 Load: 51.3 t ADT: 1,000

PR 940

Fair

Over: JUAN MARTIN RIVER

4 KM WEST OF FAJARDO, Luquillo, PR

Built 1916 Load: 51.4 t ADT: 4,000

PR 194

Fair

Over: FAJARDO CREEK

2.5 KM WEST OF FAJARDO, Fajardo, PR

Built 1984 Load: 51.5 t ADT: 15,400

PR 132

Fair

Over: CA¥AS RIVER

2 KM WEST OF PONCE, Ponce, PR

Built 1974 Load: 51.6 t ADT: 20,700

PR 375

Fair

Over: WATERWAY

7 KMS N.E. OF YAUCO, Yauco, PR

Built 2007 Load: 51.6 t ADT: 1,000

PR-138 KM 1.6

Fair

Over: DIRT ROAD

3 KM EAST OF COAMO, Coamo, PR

Built 2005 Load: 51.7 t ADT: 9,400

PR 3 KM 132.0

Fair

Over: NIGUA RIVER

1 KM EAST PR-178 & PR, Arroyo, PR

Built 2005 Load: 51.9 t ADT: 17,600

PR 165R

Fair

Over: LA PLATA RIVER

0.10 KM EAST OF DORADO, Dorado, PR

Built 1997 Load: 51.9 t ADT: 5,550

PR 52 SOUTHBOUND

Fair

Over: FUTURE ROAD(DIRT ROAD)

8 KM N W OF SANTA ISABEL, Juana Díaz, PR

Built 1970 Load: 51.9 t ADT: 27,900

PR 52 NORTHBOUND

Fair

Over: FUTURE ROAD(DIRT ROAD)

8 KM N W OF SANTA ISABEL, Juana Díaz, PR

Built 1970 Load: 51.9 t ADT: 14,100

PR 102

Fair

Over: MENDOZA CREEK

1 KM N W OF CABO ROJO, Cabo Rojo, PR

Built 1914 Load: 52.1 t ADT: 7,300

PR 808

Fair

Over: MAVILLA RIVER

1.4 KM WEST OF INT PR 811, Corozal, PR

Built 1981 Load: 52.2 t ADT: 600

PR 375

Fair

Over: YAUCO RIVER

3.5 KMS NORTH OF YAUCO, Yauco, PR

Built 1997 Load: 52.2 t ADT: 1,000

PR 3

Fair

Over: CATTLE PASS

7 KM EAST OF RIO GRANDE, Río Grande, PR

Built 1978 Load: 52.5 t ADT: 43,600

PR-1

Fair

Over: SAN ANTONIO CHANNEL

3.8 KM SOUTH OF SAN JUAN, San Juan, PR

Built 2003 Load: 52.5 t ADT: 45,400

PUERTO VIEJO ST.

Fair

Over: CHANNEL

2.5 KM S.E.PONCE CENTER, Ponce, PR

Built 1999 Load: 52.6 t ADT: 200

PR 3

Fair

Over: ANGELA CREEK

3 KM WEST OF RIO GRANDE, Río Grande, PR

Built 1956 Load: 52.6 t ADT: 36,700

PR 3

Fair

Over: HERRERA RIVER

5 KM EAST OF CANOVANAS, Río Grande, PR

Built 1956 Load: 52.6 t ADT: 36,700

PR 2

Fair

Over: DIRT ROAD

6 KM NORTHWEST OF GUANICA, Guánica, PR

Built 1979 Load: 52.7 t ADT: 24,400

PR 513

Fair

Over: INDALECIA CREEK

8 KM NW OF JUANA DIAZ, Juana Díaz, PR

Built 1993 Load: 52.8 t ADT: 600

PR 156

Fair

Over: CAGUITAS RIVER

3 KM EAST OF AGUAS BUENAS, Aguas Buenas, PR

Built 1999 Load: 52.9 t ADT: 14,300

SONIA STREET

Fair

Over: CATALINA CREEK

BETWEEN F & EDMEE STREET, Bayamón, PR

Built 1960 Load: 52.9 t ADT: 700

PR 2

Fair

Over: RAMPS TO PR 2

11.35 KMS SW OF PONCE, Ponce, PR

Built 2008 Load: 52.9 t ADT: 42,200

PR 966

Fair

Over: ESPIRITU SANTO RIVER

3 KMS S E OF RIO GRANDE, Río Grande, PR

Built 1993 Load: 52.9 t ADT: 1,200

OFF PR 788

Fair

Over: UNKNOWN CREEK

6.3 WEST OF SAN LORENZO, San Lorenzo, PR

Built 1999 Load: 52.9 t ADT: 150

CRISTOBAL COLON ST

Fair

Over: WATERWAY

BETWEEN DEGETAU AVENUE, Caguas, PR

Built 1950 Load: 53.0 t ADT: 3,700

PR 52 NORTHBOUND

Fair

Over: GRAVEL ROAD

WEST SALINAS TOLL GATE, Salinas, PR

Built 1971 Load: 53.1 t ADT: 14,700

PR 52 SOUTHBOUND

Fair

Over: GRAVEL ROAD

WEST SALINAS TOLL GATE, Salinas, PR

Built 1971 Load: 53.1 t ADT: 17,042

PR 52 SOUTHBOUND

Fair

Over: DIRT ROAD

1 KM NORTH OF SALINAS, Salinas, PR

Built 1971 Load: 53.1 t ADT: 14,700

PR 52 NORTHBOUND

Fair

Over: DIRT ROAD

3 KM NORTHEAST OF SALINAS, Salinas, PR

Built 1972 Load: 53.1 t ADT: 17,300

PR 52 SOUTHBOUND

Fair

Over: DIRT ROAD

3 KM NORTHEAST OF SALINAS, Salinas, PR

Built 1972 Load: 53.1 t ADT: 17,300

Cam. Carrasco Km.

Fair

Over: Waterway

4.48Km. SW S.Lorenzo Town, San Lorenzo, PR

Built 2002 Load: 53.1 t ADT: 500

PR 165

Fair

Over: BAYAMON & HONDO RIVE

4 KM. N.W. OF CATAÑO, Cataño, PR

Built 2004 Load: 53.2 t ADT: 47,700

PR 3

Fair

Over: PITAHAYA RIVER

2.4 KM S E OF LUQUILLO, Luquillo, PR

Built 1985 Load: 53.2 t ADT: 28,800

PR 17 EASTBOUND

Fair

Over: PIEDRAS RIVER

EAST INT PR 18 AND PR 17, San Juan, PR

Built 1967 Load: 53.2 t ADT: 44,600

PR 135

Fair

Over: LIMANI (BLANCO) RIVER

8 KM N W OF ADJUNTAS, Adjuntas, PR

Built 1996 Load: 53.5 t ADT: 1,000

CASILLAS STREET

Fair

Over: LOS MUERTOS CREEK

AT NORTH OF HUMACAO CITY, Humacao, PR

Built 1975 Load: 53.5 t ADT: 650

PR 348

Fair

Over: ROSARIO RIVER

AT INT OF PR 348 & PR, Mayagüez, PR

Built 1978 Load: 53.5 t ADT: 3,500

OFF SOL STREET

Fair

Over: SANTA CATALINA CREEK

2 KM WEST OF JAYUYA, Jayuya, PR

Built 1990 Load: 53.6 t ADT: 100

OFF PR 329 KM 2.0

Fair

Over: RIO GUANAJIBO

5.1 KM AL SE SAN GERMAN, San Germán, PR

Built 2005 Load: 53.6 t ADT: 100

PR 861

Fair

Over: WATERWAY

4.67 KM. S.E. OF TOA ALTA, Toa Alta, PR

Built 2012 Load: 53.7 t ADT: 21,000

PR 186 KM 3.0

Fair

Over: GARCIA CREEK

10 KM SOUTH OF CANOVANAS, Canóvanas, PR

Built 1941 Load: 53.8 t ADT: 3,500

PR 568

Fair

Over: CREEK

9.5 KM SOUTH OF COROZAL, Corozal, PR

Built 1935 Load: 53.8 t ADT: 1,100

PR 14

Fair

Over: INABON RIVER

6 KM WEST OF JUANA DIAZ, Ponce, PR

Built 1991 Load: 53.8 t ADT: 19,700

RAMP PR 1 TO PR 22

Fair

Over: DEPRESSION

5 KM S E OF SAN JUAN, San Juan, PR

Built 1979 Load: 53.9 t ADT: 7,000

Showing 1,551-1,600 of 2,387 bridges

Data sourced from the FHWA National Bridge Inventory (NBI), latest released cycle. See our methodology for details. Retrieved and formatted by PlainBridges Editorial.

Disclaimer: This information is provided for informational purposes only and does not constitute professional advice. Data is sourced from the FHWA National Bridge Inventory (NBI). A "structurally deficient" rating is a repair-priority signal, not a closure or unsafe-to-cross designation. Consult a qualified civil engineer before making decisions based on this data.