State profile · Above national median SD

Puerto Rico bridge safety

Condition ratings, load ratings, and structural-deficiency data for every public highway bridge in Puerto Rico — drawn straight from the FHWA National Bridge Inventory.

2,387
Public bridges
14.1%
Good condition
12.0%
Poor condition
12.0%
Structurally deficient

Total Bridges

2,387

Public highway bridges in Puerto Rico

Good Condition

14.1%

336 bridges rated 7-9

-35.9pp vs 50% benchmark

Poor Condition

12.0%

286 bridges rated 0-4

Structurally Deficient

12.0%

286 bridges flagged for repair priority

5.0pp vs national avg 7.0%

Puerto Rico vs national bridge condition

Puerto Rico — Good condition share 14.1%
National avg

Share of bridges rated 7-9 on the FHWA 0-9 scale (deck, superstructure, substructure all good).

Puerto Rico — Structurally deficient share 39.9%
National avg

Lower is better. Bar maxes at 30% (worst-state ceiling). National average sits at 7.0%.

Puerto Rico vs nearby ranks

Adjacent states on the structurally deficient leaderboard (lower share = better)

States are ranked by share of bridges flagged structurally deficient — the FHWA classification for any span where deck, superstructure, or substructure carries a condition rating of 4 or below. Lower percentages indicate stronger maintenance funding and inspection follow-through. States here sit immediately above and below Puerto Rico on the same metric.

38

North Dakota

10.84% top marginal rate
Structure
Progressive
Burden @ $100K
$4,242

22

Louisiana

11.00% top marginal rate
Structure
Progressive
Burden @ $100K
$12,699
Selected

72

Puerto Rico

11.98% top marginal rate
Structure
Progressive
Burden @ $100K
$2,387

23

Maine

13.23% top marginal rate
Structure
Progressive
Burden @ $100K
$771

66

Guam

15.25% top marginal rate
Structure
Progressive
Burden @ $100K
$59

Bridges Needing Most Attention in Puerto Rico

Six lowest-condition bridges in Puerto Rico, ranked by composite NBI rating. Each is inspected at least every 24 months.

All Bridges in Puerto Rico

PR 853

Good

Over: MARACUTO CREEK

.30 KM S INT PR 858 &, Carolina, PR

Built 2000 Load: 59.0 t ADT: 8,100

PR-52

Good

Over: PR-796

pr-52 km 13.8, Caguas, PR

Built 2020 Load: 59.1 t ADT: 51,000

PR 9905

Good

Over: SAN INGENIO RIVER

5.5 KM NORTH OF YABUCOA, Yabucoa, PR

Built 1960 Load: 59.4 t ADT: 1,200

MONSERRATE AVENUE

Good

Over: BLASINA CHANNEL

VILLA CAROLINA HOUSING, Carolina, PR

Built 1988 Load: 60.4 t ADT: 21,676

PR 8860

Good

Over: CREEK

6 KM S W OF CAROLINA, Trujillo Alto, PR

Built 1993 Load: 61.1 t ADT: 25,900

PR 431

Good

Over: BLANCO RIVER

4.1 KM FROM INT PR 128, Lares, PR

Built 1963 Load: 61.2 t ADT: 800

PR 916

Good

Over: QUEBRADA GRANDE CREEK

2.5 KM. S. OF SAN LORENZO, San Lorenzo, PR

Built 2003 Load: 61.5 t ADT: 9,200

PR 840

Good

Over: CERRO GORDO CREEK

0.10 KM INT PR840 & P, Bayamón, PR

Built 1986 Load: 61.7 t ADT: 9,380

PR 906

Good

Over: CANDELERO RIVER

AT 6 KMS.SOUTH OF HUMACAO, Humacao, PR

Built 1996 Load: 61.9 t ADT: 7,546

PR 53

Good

Over: MAIZALES CREEK

3.5 KMS. WEST OF NAGUABO, Naguabo, PR

Built 1998 Load: 62.0 t ADT: 5,000

PR 330

Good

Over: UNKNOWN CREEK

7 KM S E OF HORMIGUEROS, San Germán, PR

Built 1960 Load: 62.0 t ADT: 1,800

PR-128

Good

Over: WATERWAY

0.25 KM SOUTH OF LARES, Lares, PR

Built 2010 Load: 62.3 t ADT: 500

PR 5139

Good

Over: CERILLO RIVER

NE OF PONCE, Ponce, PR

Built 2008 Load: 62.7 t ADT: 4,600

PR 203 Km. 1.10

Good

Over: Local Road Km. 0.01

2.42 Km SW Gurabo, Gurabo, PR

Built 2008 Load: 63.0 t ADT: 20,700

PR 5561 km 0.10

Good

Over: Jacaguax River

1.5 Kms.South of Villalba, Villalba, PR

Built 2006 Load: 63.3 t ADT: 3,500

PR 880

Good

Over: RAILROAD

0.6 MT FROM PR 2 AT 7.5, Guaynabo, PR

Built 2000 Load: 64.0 t ADT: 5,300

PR 183

Good

Over: LOS PUERCOS CREEK

11.4 KM SOUTH SAN LORENZO, San Lorenzo, PR

Built 2000 Load: 64.0 t ADT: 17,080

PR 21

Good

Over: BUENA VISTA CREEK

0.56 KM. NE. PR-18 PR 21, San Juan, PR

Built 2013 Load: 64.1 t ADT: 40,000

PR 569

Good

Over: WATERWAY

3.75 MILES SE OF OROCOVIS, Orocovis, PR

Built 2001 Load: 65.6 t ADT: 3,600

PR-688

Good

Over: CIBUCO RIVER

2 KM NE. OF VEGA BAJA, Vega Baja, PR

Built 2003 Load: 65.7 t ADT: 8,500

PR 827

Good

Over: PINAS CREEK

3 KM SE OF TOA ALTA, Toa Alta, PR

Built 1998 Load: 65.9 t ADT: 2,700

PR 2

Good

Over: Drain Channel Collector

5.83 KM SW Ponce, Ponce, PR

Built 2010 Load: 66.1 t ADT: 27,200

PR 171

Good

Over: LA PLATA RIVER

6 KM SOUTH OF CIDRA, Cidra, PR

Built 2000 Load: 66.2 t ADT: 8,300

PR 642

Good

Over: GRANDE DE MANATI RIVER

3.1 KM AT SOUTH OF MANATI, Manatí, PR

Built 1998 Load: 66.2 t ADT: 3,700

PR 646

Good

Over: HICOTEA CREEK

7 KM S W OF VEGA BAJA, Vega Baja, PR

Built 2001 Load: 66.3 t ADT: 300

PR 66

Good

Over: Blasina Creek

S.E. INT. of PR-26 &, Carolina, PR

Built 2007 Load: 66.5 t ADT: 41,300

PR 9957

Good

Over: CANOVANAS RIVER

0.1 KM INT PR 907, Canóvanas, PR

Built 1988 Load: 66.6 t ADT: 400

PR-66 (WEST BOUND)

Good

Over: DIRT RD & CALDERON C

1.17 K. S.E. PR-3 &, Canóvanas, PR

Built 2013 Load: 66.6 t ADT: 13,850

PR-66 EASTBOUND

Good

Over: DIRT RD & CALDERON C

1.17 KM. PR3 & INT. P, Río Grande, PR

Built 2013 Load: 66.6 t ADT: 13,850

PR 156

Good

Over: NARANJOS CREEK

7 KM EAST OF COMERIO, Comerío, PR

Built 1998 Load: 66.9 t ADT: 1,600

PR 54

Good

Over: PATILLAS CHANNEL

1 KM SOUTH OF GUAYAMA, Arroyo, PR

Built 2000 Load: 67.0 t ADT: 17,500

PR 191

Good

Over: BLANCO RIVER

6 KM NORTHWEST OF NAGUABO, Naguabo, PR

Built 2004 Load: 67.4 t ADT: 1,400

PR 10

Good

Over: WATERWAY

2 KMS. EAST OF PONCE, Ponce, PR

Built 1997 Load: 67.6 t ADT: 8,900

PR 182

Good

Over: GUAYANES RIVER

3.3 KM NW OF YABUCOA, Yabucoa, PR

Built 2003 Load: 67.9 t ADT: 6,200

PR 102 AT KM 2.5

Good

Over: Llavat Channel

0.97 Kms. SW Mayaguez, Mayagüez, PR

Built 2009 Load: 68.1 t ADT: 15,000

PR 123

Good

Over: GRANDE DE ARECIBO

13 KMS SE of Arecibo, Arecibo, PR

Built 2003 Load: 68.5 t ADT: 1,400

PR 140

Good

Over: WATERWAY

13.7 KMS. N.E. OF UTUADO, Utuado, PR

Built 2010 Load: 68.5 t ADT: 1,200

PR 66

Good

Over: WATERWAY

5.12 kms S.E. OF CAROLINA, Carolina, PR

Built 2007 Load: 68.8 t ADT: 36,300

OFF PR 368 3.92 KM

Good

Over: HONDA CREEK

3.8 KM NW OF S. GRANDE, Sabana Grande, PR

Built 2009 Load: 68.9 t ADT: 100

PR 3132

Good

Over: QEBRADA SANTO DOMINGO

1 KM SE Peñuelas, Peñuelas, PR

Built 2006 Load: 69.9 t ADT: 3,800

COLISEUM STREET

Good

Over: CULEBRA RIVER KM 0.31

OFF NATIVO ALERS AVE KM01, Aguada, PR

Built 2015 Load: 70.0 t ADT: 11,200

PR 30

Good

Over: CREEK

1.4 KM S W OF GURABO, Gurabo, PR

Built 1968 Load: 70.2 t ADT: 68,900

PR 3

Good

Over: MABÚ CREEK

1.0 KM SE HUMACAO, Humacao, PR

Built 2012 Load: 70.2 t ADT: 7,607

PR 182

Good

Over: ROSA SANCHEZ CHANNEL

4 KMS NW OF YABUCOA, Yabucoa, PR

Built 1997 Load: 70.3 t ADT: 6,200

PR 155

Good

Over: GRANDE DE MANATI RIVER

4 km. SOUTH OF MOROVIS, Morovis, PR

Built 2007 Load: 70.8 t ADT: 5,900

PR 184

Good

Over: QUEBRADA ARRIBA CREEK

8.5 KM NW OF PATILLAS, Patillas, PR

Built 2006 Load: 70.8 t ADT: 4,500

PR 53

Good

Over: SUN OIL UTILITIES

4.5 EAST OF YABUCOA, Yabucoa, PR

Built 1998 Load: 70.9 t ADT: 18,000

OFF PR-966 AT 2.60

Good

Over: LA GRANDE CREEK

3.69 KM SE INT PR-3 &, Río Grande, PR

Built 2011 Load: 71.1 t ADT: 100

OFF PR 780 @ K 1.0

Good

Over: DOÑA ELENA CREEK

3.4 km @ N Comerio Town, Comerío, PR

Built 2015 Load: 71.5 t ADT: 200

C. EMILIO NIEVES

Good

Over: RIO GUADIANA

Off PR-5 KM 24.2, Naranjito, PR

Built 2017 Load: 71.8 t ADT: 400

Showing 2,001-2,050 of 2,387 bridges

Data sourced from the FHWA National Bridge Inventory (NBI), latest released cycle. See our methodology for details. Retrieved and formatted by PlainBridges Editorial.

Disclaimer: This information is provided for informational purposes only and does not constitute professional advice. Data is sourced from the FHWA National Bridge Inventory (NBI). A "structurally deficient" rating is a repair-priority signal, not a closure or unsafe-to-cross designation. Consult a qualified civil engineer before making decisions based on this data.