Bond County, IL

165 public highway bridges

Bond County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Bond County, Illinois contains 165 public highway bridges. Roughly 38.2% are rated “Good,” 44.2% “Fair,” and 7.3% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

165
Total Bridges
38.2%
Good
44.2%
Fair
7.3%
Poor Condition

Condition Distribution

Good
38.2% (63)
Fair
44.2% (73)
Poor
7.3% (12)

All Bridges (165)

CH 11

Good

Over: TRIB TO SHOAL CREEK

3.5 MI E OPOCAHONTAS, Bond, IL

Built 1982 Load: 32.4 t ADT: 125

FAS 1746

Good

Over: KINGSBURY CREEK

1.3 MI. N GREENVILLE, Bond, IL

Built 1989 Load: 32.4 t ADT: 1,400

CH 20/FAS 781

Good

Over: TRIB OF SHOAL CREEK

POCAHONTAS, Bond, IL

Built 2004 Load: 32.4 t ADT: 1,700

CH 19 JAMESTOWN RD

Good

Over: LOCUST FORK CK

2M S PIERRON, Bond, IL

Built 2011 Load: 32.4 t ADT: 800

CH18/FAS 777

Good

Over: TRIB TO SHOAL CREEK

5.5M N OF GREENVILLE, Bond, IL

Built 2005 Load: 32.4 t ADT: 200

CH 2/KEYESPORT RD

Good

Over: TRIB TO CARLYLE LAKE

1.0M W KEYESPORT, Bond, IL

Built 2011 Load: 32.4 t ADT: 850

FAS779 Pokey Rd CH

Good

Over: Trib. to Shoal Ck

1.5 Mi N Pocahontas, Bond, IL

Built 2013 Load: 32.4 t ADT: 1,300

FAS-777 (NewDougRd

Good

Over: Dry Fork Creek

2 Mi S of Sorento, Bond, IL

Built 2017 Load: 32.4 t ADT: 525

TR 60

Good

Over: LOCUST CK

1.25M S PIERRON, Bond, IL

Built 2001 Load: 32.4 t ADT: 50

TR 117

Good

Over: TRIB KINGSBURY CK

IMI N GRENVILLE, Bond, IL

Built 1993 Load: 32.4 t ADT: 225

TR 111

Good

Over: TRIB TO INDIAN CREEK

3.25M NW GREENVILLE, Bond, IL

Built 1995 Load: 32.4 t ADT: 50

TR 96A

Good

Over: INDIAN CREEK

3.5M W GREENVILLE, Bond, IL

Built 1995 Load: 32.4 t ADT: 75

TR 170

Good

Over: BEAVER CREEK

1MI. S. GREENVILLE, Bond, IL

Built 1998 Load: 32.4 t ADT: 10

TR 185

Good

Over: TRIB TO BEAVER CRK

1 M E OF CH 17, Bond, IL

Built 2010 Load: 32.4 t ADT: 150

TR 140

Good

Over: BRANCH OF SHOAL CR

3 MI N OF GREENVILLE, Bond, IL

Built 1985 Load: 32.4 t ADT: 200

TR 75B

Good

Over: TRIB KINGSBURY RESEV

4 MI NE GREENVILLE, Bond, IL

Built 1993 Load: 32.4 t ADT: 150

TR 207

Good

Over: LITTLE BEAVER CREEK

3.5M SO.OFGREENVILLE, Bond, IL

Built 1983 Load: 32.4 t ADT: 25

TR 136

Good

Over: BEAVER CREEK

5.5 MI SW GREENVILLE, Bond, IL

Built 1990 Load: 32.4 t ADT: 10

TR 214

Good

Over: TRIB OF KINGSBURY BR

2.75 NW MULBERRY GRO, Bond, IL

Built 1977 Load: 32.4 t ADT: 75

TR 214

Good

Over: TRIB TO KINGSBURY BR

2.5MI NE SMITHBORO, Bond, IL

Built 1991 Load: 32.4 t ADT: 75

TR 24

Good

Over: LITTLE DRY FORK

1.5MI NW OLD RIPLEY, Bond, IL

Built 1990 Load: 32.4 t ADT: 50

TR 8

Good

Over: LITTLE SILVER CREEK

2.5M W OLD RIPLEY, Bond, IL

Built 2001 Load: 32.4 t ADT: 225

TR 56A

Good

Over: MYLEN BR OF SHOAL CR

2M NE OF OLD RIPLEY, Bond, IL

Built 2005 Load: 32.4 t ADT: 25

TR 61

Good

Over: LITTLE DRYFORK

4.5M NW OLD RIPLEY, Bond, IL

Built 1981 Load: 32.4 t ADT: 75

TR 63

Good

Over: SHOAL CREEK

2.5 MI SE SORENTO, Bond, IL

Built 1988 Load: 32.4 t ADT: 125

TR 10 ELEVATOR RD

Good

Over: DRY FORK CREEK

2 MI W SORENTO, Bond, IL

Built 2007 Load: 32.4 t ADT: 50

TR 184

Good

Over: LT BEAVER CREEK

5 MI SE GREENVILLE, Bond, IL

Built 1988 Load: 32.4 t ADT: 50

TR 233

Good

Over: FLAT BRANCH

6MIS/2MIE OF GRNVLLE, Bond, IL

Built 1998 Load: 32.4 t ADT: 50

TR 245B

Good

Over: BR OF BEAVER CREEK

1MI E BEAVERCREEK, Bond, IL

Built 2004 Load: 32.4 t ADT: 75

CH 8

Good

Over: LICK CREEK

1.75 M N OF MULBERRY, Bond, IL

Built 1996 Load: 34.0 t ADT: 850

I-70 EB

Good

Over: BNSFRR

2.9 MI E OF ILL 127, Bond, IL

Built 1965 Load: 35.3 t ADT: 11,400

I-70 WB

Good

Over: BNSFRR

2.9 MI E OF ILL 127, Bond, IL

Built 1966 Load: 35.3 t ADT: 11,400

IL 140

Good

Over: Indian Creek

3.4mi E Old Ripley, Bond, IL

Built 1930 Load: 35.6 t ADT: 2,050

IL 140 & IL 127

Good

Over: E Fork Shoal Creek

NW CL of Greenville, Bond, IL

Built 1990 Load: 36.9 t ADT: 4,350

TR 8

Good

Over: TRIB TO LITTLE DRY F

2.5 MI NW OLD RIPLEY, Bond, IL

Built 1985 Load: 36.9 t ADT: 225

TR 81

Good

Over: DORRIS CREEK

3 MI SE SORENTO, Bond, IL

Built 1985 Load: 37.3 t ADT: 50

TR 13

Good

Over: BEARCAT CREEK

.61 MI S. PANAMA, Bond, IL

Built 1996 Load: 37.9 t ADT: 25

US 40/FAS 779

Good

Over: SHOAL CREEK

1.9 MI E POCAHONTAS, Bond, IL

Built 1994 Load: 38.2 t ADT: 1,300

IL 143

Good

Over: SHOAL CREEK

5.2 MI E OF MADCO LN, Bond, IL

Built 2018 Load: 39.2 t ADT: 1,850

TR 13

Good

Over: TRIB TO BEARCAT CK.

.74 MI S PANAMA, Bond, IL

Built 1996 Load: 39.5 t ADT: 25

TR 82 Reno Road

Good

Over: Elm Point Branch

0.9 Mi N of Reno, Bond, IL

Built 2018 Load: 39.5 t ADT: 100

IL 127

Good

Over: CSXRR

.63 MI SE GREENVILLE, Bond, IL

Built 1995 Load: 42.1 t ADT: 11,200

FAI 70 WB

Good

Over: Trib to Sugar Creek

0.21 E OF CO LN, Bond, IL

Built 1965 Load: 44.1 t ADT: 13,450

CH 11

Good

Over: SHOAL CK

2M SE POCAHONTAS, Bond, IL

Built 1977 Load: 44.1 t ADT: 125

TR156 Dudleyville

Good

Over: Little Beaver Creek

2 Mi S of Dudleyvill, Bond, IL

Built 2013 Load: 47.0 t ADT: 200

TR156 Dudleyville

Good

Over: Beaver Creek

2.75 Mi S Greenville, Bond, IL

Built 2020 Load: 47.6 t ADT: 375

I-70 EB

Good

Over: CSXRR

5.9 MI E POCAHONTAS, Bond, IL

Built 1967 Load: 52.5 t ADT: 12,050

I-70 WB

Good

Over: CSXRR

5.9 MI E POCAHONTAS, Bond, IL

Built 1967 Load: 53.1 t ADT: 12,050

US 40/FAS 779

Good

Over: W Fork Shoal Creek

1.7 MI E Pocahontas, Bond, IL

Built 2017 Load: 54.4 t ADT: 1,300

ILL 127

Good

Over: LITTLE BEAVER CREEK

4.2mi S of I-70, Bond, IL

Built 1980 Load: 55.4 t ADT: 3,350
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.