State profile · Above national median SD

Puerto Rico bridge safety

Condition ratings, load ratings, and structural-deficiency data for every public highway bridge in Puerto Rico — drawn straight from the FHWA National Bridge Inventory.

2,387
Public bridges
14.1%
Good condition
12.0%
Poor condition
12.0%
Structurally deficient

Total Bridges

2,387

Public highway bridges in Puerto Rico

Good Condition

14.1%

336 bridges rated 7-9

-35.9pp vs 50% benchmark

Poor Condition

12.0%

286 bridges rated 0-4

Structurally Deficient

12.0%

286 bridges flagged for repair priority

5.0pp vs national avg 7.0%

Puerto Rico vs national bridge condition

Puerto Rico — Good condition share 14.1%
National avg

Share of bridges rated 7-9 on the FHWA 0-9 scale (deck, superstructure, substructure all good).

Puerto Rico — Structurally deficient share 39.9%
National avg

Lower is better. Bar maxes at 30% (worst-state ceiling). National average sits at 7.0%.

Puerto Rico vs nearby ranks

Adjacent states on the structurally deficient leaderboard (lower share = better)

States are ranked by share of bridges flagged structurally deficient — the FHWA classification for any span where deck, superstructure, or substructure carries a condition rating of 4 or below. Lower percentages indicate stronger maintenance funding and inspection follow-through. States here sit immediately above and below Puerto Rico on the same metric.

38

North Dakota

10.84% top marginal rate
Structure
Progressive
Burden @ $100K
$4,242

22

Louisiana

11.00% top marginal rate
Structure
Progressive
Burden @ $100K
$12,699
Selected

72

Puerto Rico

11.98% top marginal rate
Structure
Progressive
Burden @ $100K
$2,387

23

Maine

13.23% top marginal rate
Structure
Progressive
Burden @ $100K
$771

66

Guam

15.25% top marginal rate
Structure
Progressive
Burden @ $100K
$59

Bridges Needing Most Attention in Puerto Rico

Six lowest-condition bridges in Puerto Rico, ranked by composite NBI rating. Each is inspected at least every 24 months.

All Bridges in Puerto Rico

PR 829 km 0.01

Good

Over: Unknown Creek

5 kms southeast of Toa Al, Toa Alta, PR

Built 2004 Load: 99.9 t ADT: 14,300

PR 103

Poor

Over: PIEDRA CREEK

2 KM N.E. CABO ROJO, Cabo Rojo, PR

Built 1999 ADT: 5,000

OFF PR 184

Poor

Over: GRANDE DE PATILLAS RIVER

11.5 KMS NW. OF PATILLAS, Patillas, PR

Built 1965 Load: 2.7 t ADT: 100

OFF 511 R

Poor

Over: INABON RIVER

29.4 Km North of Ponce, Ponce, PR

Built 2021 Load: 2.7 t ADT: 900

JOSE TORRES STREET

Poor

Over: RIO CULEBRINAS

PR-125 OVR RIO CULEBRINAS, San Sebastián, PR

Built 1901 Load: 2.7 t ADT: 5,900

PR 9912

Poor

Over: GRANDE DE LOIZA RIVER

10 KM S W OF SAN LORENZO, San Lorenzo, PR

Built 1950 Load: 2.8 t ADT: 5,000

PR 955

Poor

Over: JUAN GONZALEZ CREEK

4 KM EAST OF RIO GRANDE, Río Grande, PR

Built 1900 Load: 2.9 t ADT: 1,000

PR 14

Poor

Over: MATON RIVER

7 KM NORTH WEST OF CAYEY, Cayey, PR

Built 1886 Load: 3.1 t ADT: 10,700

PR 194

Poor

Over: LINEA CREEK

2 KM WEST OF FAJARDO, Fajardo, PR

Built 1882 Load: 4.4 t ADT: 35,600

PR 140

Poor

Over: DEPRESION

6.2 KM SOUTH OF FLORIDA, Ciales, PR

Built 1926 Load: 5.2 t ADT: 1,200

PR 140

Poor

Over: DEPRESSION

5.3 KM SOUTH OF FLORIDA, Florida, PR

Built 1924 Load: 5.8 t ADT: 1,200

PR 187

Poor

Over: CASTAÑON CHANNEL

1 KM NORTH OF RIO GRANDE, Río Grande, PR

Built 1927 Load: 5.8 t ADT: 5,200

EUGENIO ASTOL AVE.

Poor

Over: BAIROA RIVER

AT CAGUAS BY PASS, Caguas, PR

Built 1961 Load: 6.2 t ADT: 9,600

PR 15

Poor

Over: GUAMANI RIVER

2 KM NORTH OF GUAYAMA, Guayama, PR

Built 1891 Load: 6.9 t ADT: 1,800

PR 6623

Poor

Over: CREEK

1 KM SOUTH OF MOROVIS, Morovis, PR

Built 1940 Load: 7.0 t ADT: 1,000

LOCAL ROAD

Poor

Over: CARICABOA RIVER

0.8 KM S E OF JAYUYA, Jayuya, PR

Built 1965 Load: 7.2 t ADT: 500

PR 119

Poor

Over: CULEBRINAS RIVER

0.5 KM S E SAN SEBASTIAN, San Sebastián, PR

Built 1919 Load: 7.4 t ADT: 7,200

PR 866

Poor

Over: CREEK

5 KM NORTHWEST OF BAYAMON, Bayamón, PR

Built 1977 Load: 7.6 t ADT: 1,100

PR 200R

Poor

Over: COFRESI CREEK

AT ISABEL II, VIEQUES, Vieques, PR

Built 1940 Load: 7.9 t ADT: 10,300

PR 128

Poor

Over: INDIERA RIVER

12 KM EAST OF MARICAO, Maricao, PR

Built 1921 Load: 8.2 t ADT: 500

OFF PR 378 KM 4.8

Poor

Over: GUAYANILLA RIVER

40 MT OFF PR378 AT KM 4.8, Guayanilla, PR

Built 1979 Load: 8.9 t ADT: 150

PR 458

Poor

Over: PLAYUELA CHANNEL

1.5 KM WEST OF AGUADILLA, Aguadilla, PR

Built 1939 Load: 9.0 t ADT: 700

OFF PR852@K4.2

Poor

Over: UNKNOWN CREEK

8 Km SE Trujillo Alto, Trujillo Alto, PR

Built 2003 Load: 9.1 t ADT: 100

PR 128

Poor

Over: ANON CREEK

1.2 KM SOUTH OF LARES, Lares, PR

Built 1922 Load: 9.4 t ADT: 4,200

PR 971

Poor

Over: CREEK

8.5 KM WEST OF CEIBA, Ceiba, PR

Built 1960 Load: 9.5 t ADT: 3,600

PR 149

Poor

Over: GUAYABAL RIVER

4 KM NORTH OF JUANA DIAZ, Villalba, PR

Built 1949 Load: 9.6 t ADT: 17,400

PR 1

Poor

Over: MATON RIVER

2.5 KM SOUTHWEST OF CAYEY, Cayey, PR

Built 1927 Load: 9.7 t ADT: 8,300

OFF PR 173

Poor

Over: HONDA CREEK

6 KM N W OF AIBONITO, Aibonito, PR

Built 1960 Load: 9.8 t ADT: 100

PR 172

Poor

Over: SABANA RIVER

2 KM NORTH EAST OF CIDRA, Cidra, PR

Built 1944 Load: 10.1 t ADT: 20,500

PR 172

Poor

Over: BAYAMON RIVER

2.5 KM NORTHEAST OF CIDRA, Cidra, PR

Built 1944 Load: 10.1 t ADT: 14,400

OFF PR 372

Poor

Over: DUEY RIVER

OFF PR 372 AT 7.1 KM 0.2, Yauco, PR

Built 1988 Load: 10.1 t ADT: 200

OFF PR 535

Poor

Over: CA¥AS RIVER

6.5 KM SOUTH EAST OF J.D., Juana Díaz, PR

Built 1985 Load: 10.8 t ADT: 100

PR 102

Poor

Over: GUANAJIBO RIVER

5 KM S W MAYAGUEZ CENTER, Mayagüez, PR

Built 1950 Load: 10.8 t ADT: 6,400

OFF PR 182

Poor

Over: GUAYANES RIVER

0.2 KM SOUTH OF PR 182, Yabucoa, PR

Built 1988 Load: 11.1 t ADT: 200

OFF PR 111 KM 47.1

Poor

Over: TANAMA RIVER

0.6 KM OF PR 111 AT KM 14, Utuado, PR

Built 1948 Load: 11.4 t ADT: 4,700

PR 681

Poor

Over: TIBURONES CHANNEL

3 MILES EAST OF ARECIBO, Arecibo, PR

Built 1955 Load: 11.8 t ADT: 9,000

RURAL LOCAL ROAD

Poor

Over: CHIQUITO DE MATON RIVER

5.5 KM NORTHWEST OF CAYEY, Cayey, PR

Built 1976 Load: 11.8 t ADT: 600

CALLE 5

Poor

Over: STREAM

CALLE 5 OFF PR--149, Juana Díaz, PR

Built 1901 Load: 12.1 t ADT: 4,500

OFF PR 603 @1.0

Poor

Over: GUAONICA RIVER

OFF PR 603, Utuado, PR

Built 1972 Load: 12.5 t ADT: 100

OFF PR 704

Poor

Over: OBISPO CREEK

9 KM NORTH EAST OF COAMO, Coamo, PR

Built 1986 Load: 12.7 t ADT: 100

PR 106

Poor

Over: GANDEL CREEK

2.5 KM EAST OF MAYAGUEZ, Mayagüez, PR

Built 1884 Load: 12.9 t ADT: 9,400

ULTIMO BRINCO ST

Poor

Over: GRANDE CREEK

OFF PR 411 AT 1.0, Rincón, PR

Built 1967 Load: 13.4 t ADT: 150

PR 951

Poor

Over: GALLARDO CHANNEL

1.1 KM SOUTH OF LOIZA, Loíza, PR

Built 1935 Load: 13.5 t ADT: 4,100

PR 123

Poor

Over: CAMBALACHE CREEK

1 KM NORTH OF UTUADO, Utuado, PR

Built 1892 Load: 13.8 t ADT: 7,800

PR 568

Poor

Over: BOTIJAS RIVER

1 KM NORTH OF OROCOVIS, Orocovis, PR

Built 1924 Load: 14.0 t ADT: 1,900

PR 144

Poor

Over: CARICABOA RIVER

1 KM EAST OF JAYUYA, Jayuya, PR

Built 1937 Load: 14.4 t ADT: 11,700

OFF 348 @ KM 1.2

Poor

Over: BRUJO RIVER

1.2 KM. N.E. OF ROSARIO, San Germán, PR

Built 2002 Load: 14.4 t ADT: 200

OFF PR 2 KM 137.25

Poor

Over: RIO CANAS

Off PR 2 at 137.2 km, Aguada, PR

Built 1901 Load: 15.6 t ADT: 35,200

PR 119

Poor

Over: ARENAS RIVER

1.5 KM WEST OF LAS MARIAS, Las Marías, PR

Built 1905 Load: 15.6 t ADT: 5,700

PR 725

Poor

Over: AIBONITO RIVER

2 KM N W OF AIBONITO, Aibonito, PR

Built 1970 Load: 16.0 t ADT: 8,900

Showing 2,101-2,150 of 2,387 bridges

Data sourced from the FHWA National Bridge Inventory (NBI), latest released cycle. See our methodology for details. Retrieved and formatted by PlainBridges Editorial.

Disclaimer: This information is provided for informational purposes only and does not constitute professional advice. Data is sourced from the FHWA National Bridge Inventory (NBI). A "structurally deficient" rating is a repair-priority signal, not a closure or unsafe-to-cross designation. Consult a qualified civil engineer before making decisions based on this data.