State profile · Above national median SD

Puerto Rico bridge safety

Condition ratings, load ratings, and structural-deficiency data for every public highway bridge in Puerto Rico — drawn straight from the FHWA National Bridge Inventory.

2,387
Public bridges
14.1%
Good condition
12.0%
Poor condition
12.0%
Structurally deficient

Total Bridges

2,387

Public highway bridges in Puerto Rico

Good Condition

14.1%

336 bridges rated 7-9

-35.9pp vs 50% benchmark

Poor Condition

12.0%

286 bridges rated 0-4

Structurally Deficient

12.0%

286 bridges flagged for repair priority

5.0pp vs national avg 7.0%

Puerto Rico vs national bridge condition

Puerto Rico — Good condition share 14.1%
National avg

Share of bridges rated 7-9 on the FHWA 0-9 scale (deck, superstructure, substructure all good).

Puerto Rico — Structurally deficient share 39.9%
National avg

Lower is better. Bar maxes at 30% (worst-state ceiling). National average sits at 7.0%.

Puerto Rico vs nearby ranks

Adjacent states on the structurally deficient leaderboard (lower share = better)

States are ranked by share of bridges flagged structurally deficient — the FHWA classification for any span where deck, superstructure, or substructure carries a condition rating of 4 or below. Lower percentages indicate stronger maintenance funding and inspection follow-through. States here sit immediately above and below Puerto Rico on the same metric.

38

North Dakota

10.84% top marginal rate
Structure
Progressive
Burden @ $100K
$4,242

22

Louisiana

11.00% top marginal rate
Structure
Progressive
Burden @ $100K
$12,699
Selected

72

Puerto Rico

11.98% top marginal rate
Structure
Progressive
Burden @ $100K
$2,387

23

Maine

13.23% top marginal rate
Structure
Progressive
Burden @ $100K
$771

66

Guam

15.25% top marginal rate
Structure
Progressive
Burden @ $100K
$59

Bridges Needing Most Attention in Puerto Rico

Six lowest-condition bridges in Puerto Rico, ranked by composite NBI rating. Each is inspected at least every 24 months.

All Bridges in Puerto Rico

SABANA SECA AVENUE

Good

Over: LEVITTOWN CHANNEL

IN SABANA SECA, Toa Baja, PR

Built 1970 Load: 72.5 t ADT: 27,000

PR 172

Good

Over: SABANA RIVER

2 KM. NORTHEAST OF CIDRA, Cidra, PR

Built 2011 Load: 72.6 t ADT: 20,500

PR 53

Good

Over: FRONTERAS CREEK

0.1 KM. EAST HUMACAO, Humacao, PR

Built 1995 Load: 72.7 t ADT: 17,800

PR 102

Good

Over: CHANNEL

1.18 KMS SW OF MAYAGUEZ, Mayagüez, PR

Built 2010 Load: 74.0 t ADT: 15,000

PR 53 WESTBOUND

Good

Over: SOMBRERITO CREEK

2.49 KMS NE OF MAUNABO, Maunabo, PR

Built 2009 Load: 74.6 t ADT: 5,800

PR 116

Good

Over: LOCO RIVER

0.70 KM. NORTH OF GUANICA, Guánica, PR

Built 2004 Load: 74.9 t ADT: 15,125

PR 7707

Good

Over: IRRIGATION CHANNEL

4 KM NORTHWEST OF GUAYAMA, Guayama, PR

Built 1994 Load: 75.1 t ADT: 900

PR 2

Good

Over: CREEK

4 KM S E OF SABANA GRANDE, Sabana Grande, PR

Built 1979 Load: 75.8 t ADT: 24,400

PR 53

Good

Over: SECA CREEK

3.2 KM SOUTH OF CEIBA, Ceiba, PR

Built 1996 Load: 76.7 t ADT: 15,500

RAMP TO PR 330

Good

Over: PR 2

5.5 km SE HORMIGUEROS, San Germán, PR

Built 2005 Load: 77.3 t ADT: 1,200

PR 53

Good

Over: QUEBRADA SECA CREEK

2.5KM AT EAST OF CEIBA, Ceiba, PR

Built 1996 Load: 77.7 t ADT: 23,600

PR 423

Good

Over: CULEBRINAS RIVER

7KM. N.W. SAN SEBASTIAN, San Sebastián, PR

Built 2000 Load: 78.5 t ADT: 600

PR 950

Good

Over: SONADORA CREEK

11.5 KM EAST OF JUNCOS, Naguabo, PR

Built 1960 Load: 81.0 t ADT: 1,300

PR 5561R

Good

Over: JACAGUAS RIVER

0.44 KM STH OF VILLALBA, Villalba, PR

Built 2009 Load: 82.2 t ADT: 2,600

PR-615

Good

Over: TORO NEGRO RIVER

PR-616 AT KM. 14.5, Ciales, PR

Built 2009 Load: 83.2 t ADT: 2,400

PR-1 RAMP TO PR-18

Good

Over: CALLE SAN ROBERTO

PR-1 KM 15.4, San Juan, PR

Built 2020 Load: 83.2 t ADT: 45,500

PR 23

Good

Over: MARGARITA CREEK

CAPARRA INTERCHANGE, Guaynabo, PR

Built 1964 Load: 86.3 t ADT: 29,700

PR 8

Good

Over: CHANNEL

11 KMS. SE. OF SAN JUAN, San Juan, PR

Built 1994 Load: 87.5 t ADT: 50,800

PR 21 KM 4.2

Good

Over: JOSEFINA CREEK

100 MTS W VETERANS HOSP., San Juan, PR

Built 1965 Load: 88.2 t ADT: 28,700

PR 735

Good

Over: BEATRIZ CREEK

3.4 KM NORTHEAST OF CAYEY, Cayey, PR

Built 1998 Load: 88.8 t ADT: 7,400

PR 332

Good

Over: LOCO RIVER

2 KMS NORTH OF GUANICA, Guánica, PR

Built 1991 Load: 89.5 t ADT: 1,000

PR 8

Good

Over: SAN ANTON CREEK

1 KM E. OF CAMPO RICO AVE, Carolina, PR

Built 1997 Load: 90.6 t ADT: 28,300

OFF PR 182

Good

Over: ROSA SANCHEZ CHANNEL

4 KMS OF YABUCOA, Yabucoa, PR

Built 1992 Load: 91.7 t ADT: 300

OFF PR 834

Good

Over: DON VARO CREEK

0.20 KM. OF PR 834, Guaynabo, PR

Built 1999 Load: 94.1 t ADT: 500

PR-53 KM 50.45

Good

Over: Unnamed Creek

2.5 KM NE Of Maunabo, Maunabo, PR

Built 2009 Load: 98.0 t ADT: 5,800

PR-693

Good

Over: DRAINAGE CHANNEL

PR-693 KM 2.5, Dorado, PR

Built 1988 Load: 98.2 t ADT: 25,800

PR 5

Good

Over: WATERWAY

2 KM NORTH OF BAYAMON, Bayamón, PR

Built 1996 Load: 98.3 t ADT: 18,700

PR 2

Good

Over: UNNAMED CREEK

11.15 KM SW OF PONCE, Ponce, PR

Built 2008 Load: 98.3 t ADT: 35,079

PR 409

Good

Over: LAS JOSEFAS CREEK

4.5 KM N E OF MARICAO, Las Marías, PR

Built 1972 Load: 98.7 t ADT: 400

PR 123

Good

Over: CIDRA RIVER

3 KM NORTH OF ADJUNTAS, Adjuntas, PR

Built 2004 Load: 99.9 t ADT: 9,200

PR 2

Good

Over: HONDO RIVER

5 KM W BAYAMON DOWNTOWN, Bayamón, PR

Built 1942 Load: 99.9 t ADT: 49,400

RAMP PR 29 TO PR 5

Good

Over: WATERWAY

PARK TREN URBANO CANTON, Bayamón, PR

Built 1996 Load: 99.9 t ADT: 52,600

PR 167

Good

Over: CANCEL CREEK

9 KM SW OF BAYAMON, Bayamón, PR

Built 2000 Load: 99.9 t ADT: 20,600

PR 977

Good

Over: CREEK

3 KM NORTH WEST OF CEIBA, Ceiba, PR

Built 1970 Load: 99.9 t ADT: 900

CAM DEL ARROYATA

Good

Over: RIO ARROYATA

PR-172 KM 9.6, Cidra, PR

Built 2014 Load: 99.9 t ADT: 6,800

PR-181

Good

Over: GURABO RIVER

1 km NE from Gurabo, Gurabo, PR

Built 2005 Load: 99.9 t ADT: 20,500

PR 2

Good

Over: GRANDE CREEK

1 KM S E OF HORMIGUEROS, Hormigueros, PR

Built 1961 Load: 99.9 t ADT: 25,000

PR 53

Good

Over: COLLORES CREEK

6 KMS. NORTHEAST HUMACAO, Humacao, PR

Built 1997 Load: 99.9 t ADT: 15,100

PR 53

Good

Over: UNNAMED CREEK

7 KM NORTHEAST HUMACAO, Humacao, PR

Built 1997 Load: 99.9 t ADT: 20,100

PR 53

Good

Over: UNNAMED CREEK

1.79 MI EAST MAUNABO, Maunabo, PR

Built 2009 Load: 99.9 t ADT: 5,800

PR 53

Good

Over: EMAJAGUA CREEK

4.2KMS OF NE OF MAUNABO, Maunabo, PR

Built 2009 Load: 99.9 t ADT: 5,800

PR-53 KM 50.45

Good

Over: Unnamed Creek

2.5 KM NE Of Maunabo, Maunabo, PR

Built 2009 Load: 99.9 t ADT: 2,900

PR 53 EASTBOUND

Good

Over: SOMBRERITO CREEK

2.49 KMS NE MAUNABO, Maunabo, PR

Built 2008 Load: 99.9 t ADT: 5,800

PR-53 KM 51.0

Good

Over: Waterway

2.51 KM NE of Maunabo, Maunabo, PR

Built 2009 Load: 99.9 t ADT: 19,242

PR 495

Good

Over: LOS MORONES CREEK

3 KM FROM INT PR 420, Moca, PR

Built 1966 Load: 99.9 t ADT: 400

PR 814

Good

Over: ANONES CREEK

2.5 SOUTH OF NARANJITO, Naranjito, PR

Built 2000 Load: 99.9 t ADT: 1,600

CAMBALACHE STREET

Good

Over: CAMBALACHE CREEK

200 MT FROM PR 3,KM 19.7, Río Grande, PR

Built 1996 Load: 99.9 t ADT: 2,500

PR 2

Good

Over: TORUNO CREEK

1.5 KM NORTH SAN GERMAN, San Germán, PR

Built 1964 Load: 99.9 t ADT: 38,000

RAMP PR 17 TO PR 8

Good

Over: CHANNEL

11 KMS. SE. FROM SAN JUAN, San Juan, PR

Built 1994 Load: 99.9 t ADT: 18,900

PR 827

Good

Over: CREEK

5 KM SOUTH OF TOA ALTA, Toa Alta, PR

Built 1960 Load: 99.9 t ADT: 2,500

Showing 2,051-2,100 of 2,387 bridges

Data sourced from the FHWA National Bridge Inventory (NBI), latest released cycle. See our methodology for details. Retrieved and formatted by PlainBridges Editorial.

Disclaimer: This information is provided for informational purposes only and does not constitute professional advice. Data is sourced from the FHWA National Bridge Inventory (NBI). A "structurally deficient" rating is a repair-priority signal, not a closure or unsafe-to-cross designation. Consult a qualified civil engineer before making decisions based on this data.