State profile · Below median Poor share

Florida bridge safety

According to the Federal Highway Administration's 2024 National Bridge Inventory, condition ratings, load ratings, and Poor-condition shares for every public highway bridge in Florida.

13,036
Public bridges
59.5%
Good condition
2.8%
Poor condition

Florida holds 13,036 public highway bridges (#22 of 52 by inventory) with a 2.79% Poor share (#46 of 52 by Poor share).

That is 2.8% of the state's inventory, against an average of 7.5% across the 54 states and territories with Poor-rated bridges on file, which places it 7 of 54 ordered from the lowest Poor share upward. A bridge is rated Poor when its weakest applicable component scores 4 or below on the inspecting agency's 0-9 scale, so the category is a maintenance and funding signal rather than a closure order or a live crossing-safety verdict.

Inventory: FHWA NBI 2024 · last ETL August 2026

Total Bridges

13,036

Public highway bridges in Florida

Good Condition

59.5%

7,763 bridges rated 7-9

9.5pp vs 50% benchmark

Poor Condition

2.8%

364 bridges whose lowest applicable component is rated 0-4

-4.7pp vs national avg 7.5%

Florida vs national bridge condition

Florida - Good condition share 59.5%
National avg

Share of bridges rated 7-9 on the FHWA 0-9 scale (deck, superstructure, substructure all good).

Florida - Poor-condition share 9.3%
National avg

Lower is better. Bar maxes at 30% (worst-state ceiling). National average sits at 7.5%.

Florida in the national condition pattern

Each point is a state or territory in the FHWA NBI; the highlighted point is this profile.

Inventory size and Poor-condition share are different measures: Florida has 13,036 bridges and a 2.8% Poor-condition share in the 2024 NBI, rank #7 of 54 jurisdictions ordered from the lowest share upward. The dashed comparisons mark the national average state rate and the midpoint of the plotted inventory range; neither is a live safety or closure threshold. Scatter plot of 54 data points. 0%10%20%30%40% 0k20k40k60k Public bridges in inventory (thousands) Poor-condition share (%) FL, Public bridges in inventory (thousands): 13k · Poor-condition share (%): 2.79%AL, Public bridges in inventory (thousands): 16.2k · Poor-condition share (%): 3.35%AK, Public bridges in inventory (thousands): 1.7k · Poor-condition share (%): 7.89%AZ, Public bridges in inventory (thousands): 8.6k · Poor-condition share (%): 1.15%AR, Public bridges in inventory (thousands): 13k · Poor-condition share (%): 5.43%CA, Public bridges in inventory (thousands): 25.8k · Poor-condition share (%): 5.91%CO, Public bridges in inventory (thousands): 9k · Poor-condition share (%): 4.82%CT, Public bridges in inventory (thousands): 4.4k · Poor-condition share (%): 4.72%DE, Public bridges in inventory (thousands): 0.9k · Poor-condition share (%): 1.26%DC, Public bridges in inventory (thousands): 0.3k · Poor-condition share (%): 1.95%GA, Public bridges in inventory (thousands): 15.1k · Poor-condition share (%): 1.59%GU, Public bridges in inventory (thousands): 0k · Poor-condition share (%): 12.77%HI, Public bridges in inventory (thousands): 1.2k · Poor-condition share (%): 6.53%ID, Public bridges in inventory (thousands): 4.6k · Poor-condition share (%): 4.9%IL, Public bridges in inventory (thousands): 26.9k · Poor-condition share (%): 9.35%IN, Public bridges in inventory (thousands): 19.5k · Poor-condition share (%): 5.22%IA, Public bridges in inventory (thousands): 23.7k · Poor-condition share (%): 19.16%KS, Public bridges in inventory (thousands): 24.9k · Poor-condition share (%): 5.26%KY, Public bridges in inventory (thousands): 14.5k · Poor-condition share (%): 7.37%LA, Public bridges in inventory (thousands): 12.7k · Poor-condition share (%): 11.48%ME, Public bridges in inventory (thousands): 2.5k · Poor-condition share (%): 15.41%MD, Public bridges in inventory (thousands): 5.5k · Poor-condition share (%): 4.56%MA, Public bridges in inventory (thousands): 5.3k · Poor-condition share (%): 8.88%MI, Public bridges in inventory (thousands): 11.4k · Poor-condition share (%): 11.27%MN, Public bridges in inventory (thousands): 13.5k · Poor-condition share (%): 4.44%MS, Public bridges in inventory (thousands): 16.7k · Poor-condition share (%): 6.03%MO, Public bridges in inventory (thousands): 24.6k · Poor-condition share (%): 8.95%MT, Public bridges in inventory (thousands): 5.2k · Poor-condition share (%): 6.81%NE, Public bridges in inventory (thousands): 15.4k · Poor-condition share (%): 7.9%NV, Public bridges in inventory (thousands): 2.1k · Poor-condition share (%): 1.14%NH, Public bridges in inventory (thousands): 2.5k · Poor-condition share (%): 7.51%NJ, Public bridges in inventory (thousands): 6.8k · Poor-condition share (%): 6.01%NM, Public bridges in inventory (thousands): 4k · Poor-condition share (%): 4.51%NY, Public bridges in inventory (thousands): 17.6k · Poor-condition share (%): 9.43%NC, Public bridges in inventory (thousands): 19.2k · Poor-condition share (%): 6.76%ND, Public bridges in inventory (thousands): 4.3k · Poor-condition share (%): 10.98%OH, Public bridges in inventory (thousands): 26.7k · Poor-condition share (%): 4.74%OK, Public bridges in inventory (thousands): 22.9k · Poor-condition share (%): 7.7%OR, Public bridges in inventory (thousands): 8.3k · Poor-condition share (%): 4.61%PA, Public bridges in inventory (thousands): 23.3k · Poor-condition share (%): 12.58%PR, Public bridges in inventory (thousands): 2.4k · Poor-condition share (%): 13.92%RI, Public bridges in inventory (thousands): 0.8k · Poor-condition share (%): 15.2%SC, Public bridges in inventory (thousands): 9.5k · Poor-condition share (%): 6.17%SD, Public bridges in inventory (thousands): 5.9k · Poor-condition share (%): 16.36%TN, Public bridges in inventory (thousands): 20.4k · Poor-condition share (%): 4.41%TX, Public bridges in inventory (thousands): 56.7k · Poor-condition share (%): 1.23%UT, Public bridges in inventory (thousands): 3.1k · Poor-condition share (%): 2.91%VT, Public bridges in inventory (thousands): 2.9k · Poor-condition share (%): 2.9%VI, Public bridges in inventory (thousands): 0k · Poor-condition share (%): 29.17%VA, Public bridges in inventory (thousands): 14.1k · Poor-condition share (%): 3.39%WA, Public bridges in inventory (thousands): 8.5k · Poor-condition share (%): 5.45%WV, Public bridges in inventory (thousands): 7.3k · Poor-condition share (%): 18.64%WI, Public bridges in inventory (thousands): 14.4k · Poor-condition share (%): 6.52%WY, Public bridges in inventory (thousands): 3.1k · Poor-condition share (%): 6.51%
Inventory size and Poor-condition share are different measures: Florida has 13,036 bridges and a 2.8% Poor-condition share in the 2024 NBI, rank #7 of 54 jurisdictions ordered from the lowest share upward. The dashed comparisons mark the national average state rate and the midpoint of the plotted inventory range; neither is a live safety or closure threshold.

Florida vs all states by public bridge inventory

Where this state's FHWA NBI public-highway bridge count sits among every state and territory on PlainBridges

13,036 22nd of 54 higher than 32 of 54 states

States and territories, banded by public bridge inventory size

Each bar is a band; taller bars hold more states. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · 2024

Read the rank neighborhood for Florida

The highlighted point is Florida: 13,036 bridges and 2.79% in Poor condition, rank #7 of 54 jurisdictions ordered from the lowest share upward. The five jurisdictions immediately above and below Florida on that same Poor-share ordering:

  • Georgia: 15,069 bridges · 1.59% Poor
  • District of Columbia: 257 bridges · 1.95% Poor
  • Florida: 13,036 bridges · 2.79% Poor
  • Vermont: 2,862 bridges · 2.90% Poor
  • Utah: 3,125 bridges · 2.91% Poor

The full national sortable table lives on the rankings page.

Material families in Florida

Exclusive FHWA material families across all 13,036 bridges in this state; continuous variants fold into the parent family. Orthogonal to the Poor-share scatter above.

Who maintains Florida’s inventory

State agency holds 56.6% of the 13,036 public highway bridges filed under Florida in the 2024 NBI, the agency-of-record split for this state, not a condition verdict.

When Florida’s bridges were built

Pre-1950 construction accounts for 4.6% of the 13,036 bridges with a recorded original year in Florida. Era bands are orthogonal to the Poor-share ranking above.

Condition Distribution

Florida59.6%37.7%GoodFairPoor
Bridge inventory deck-condition mix - Florida (FHWA NBI)

Florida vs nearby ranks

Adjacent states by Poor-condition share (lower share = better)

States are ranked by the share of bridges whose lowest applicable component rating is 4 or below. This describes recorded condition; it does not measure funding effectiveness or live crossing safety. States here sit immediately above and below Florida on the same metric.

GA

Georgia

1.59% top marginal rate
Structure
Progressive
Burden @ $100K
$15,069
Selected

FL

Florida

2.79% top marginal rate
Structure
Progressive
Burden @ $100K
$13,036

VT

Vermont

2.90% top marginal rate
Structure
Progressive
Burden @ $100K
$2,862

UT

Utah

2.91% top marginal rate
Structure
Progressive
Burden @ $100K
$3,125

Bridges Needing Most Attention in Florida

Six lowest-condition bridges in Florida, ranked by the portal's composite display score. Inspection intervals are risk-based under current NBIS rules.

All Bridges in Florida

Kelvington Drive

Good

Over: LW-9 Drainage Canal

0.2 mi W of SR-434, Orange, FL

Built 1962 Load: 32.7 t ADT: 2,316

Narcoossee Road

Good

Over: Jim Branch Canal

1.8mi South of SR-417, Orange, FL

Built 1989 Load: 32.7 t ADT: 38,000

Oak Ridge Road EB

Good

Over: Shingle Creek

0.9 mi W of John Yng Pkwy, Orange, FL

Built 1998 Load: 32.7 t ADT: 24,000

Bridgeway Blvd.

Good

Over: Canal

0.25 Mi. South of SR-50, Orange, FL

Built 1999 Load: 32.7 t ADT: 1,275

CR-527 (Orange) SB

Good

Over: SR-91 (FL Turnpike)

0.6 Miles South of SR-417, Orange, FL

Built 2018 Load: 32.7 t ADT: 20,300

Epcot Center Drive

Good

Over: C-1 Canal

Reedy Creek Imp. Dist, Orange, FL

Built 1981 Load: 32.7 t ADT: 73,000

Ramp B1 EB

Good

Over: Eastbound C-D

Ramp B1 - Eastbound C-D, Seminole, FL

Built 2002 Load: 32.7 t ADT: 3,700

SR-429 SB on Ramp

Good

Over: Wilson Road

SR-429 SB Over Wilson Rd, Seminole, FL

Built 2022 Load: 32.7 t ADT: 1,000

DAVIS PARK RD

Good

Over: JASPERS DITCH

0.5MI SOUTH OF CR 210, St. Johns, FL

Built 2008 Load: 32.7 t ADT: 4,000

Frm Nocatee to Dvl

Good

Over: Durbin Creek

1.2MI W OF VALLEY RIDGE B, St. Johns, FL

Built 2010 Load: 32.7 t ADT: 11,500

SR-11

Good

Over: Lake Dias Creek

7.3 Mi N of US-17, Volusia, FL

Built 1959 Load: 32.7 t ADT: 3,900

SR-430 EB

Good

Over: IWW Halifax River

SR-430 EB - Halifax River, Volusia, FL

Built 1997 Load: 32.7 t ADT: 9,300

I-4 Eastbound

Good

Over: Ramp F2 & Ramp H1

I-4/I-95 Interchange, Volusia, FL

Built 2018 Load: 32.7 t ADT: 26,000

Ramp J2 & K2

Good

Over: I-95 & US-92

I-95/US-92 Interchange, Volusia, FL

Built 2018 Load: 32.7 t ADT: 2,800

SB US-441 (SR-7)

Good

Over: C-13 Canal

.5mi N of Oakland Pk Blvd, Broward, FL

Built 1954 Load: 32.7 t ADT: 26,000

I-95 (SR-9)

Good

Over: Taft Street

0.5 Mile South of SR-822, Broward, FL

Built 1964 Load: 32.7 t ADT: 238,000

SB I-95 (SR-9)

Good

Over: SR-834 (Sample Road)

1.0 Mi N of Copans Rd., Broward, FL

Built 1974 Load: 32.7 t ADT: 104,000

NB US-441 (SR-7)

Good

Over: C-13 Canal

.5mi N of Oakland PK Blvd, Broward, FL

Built 1964 Load: 32.7 t ADT: 26,000

NB I-95 (SR-9)

Good

Over: SR-834 (Sample Rd.)

1.0 Mi. N of Copans Rd., Broward, FL

Built 1974 Load: 32.7 t ADT: 104,000

SW 3rd St.

Good

Over: I-95(SR-9)

1.2 Mi E of Powerline Rd, Broward, FL

Built 1975 Load: 32.7 t ADT: 10,700

I-95 (SR-9) SB

Good

Over: Cypress Creek Rd(NW62St)

0.35 mi N of Andrews Ave, Broward, FL

Built 1976 Load: 32.7 t ADT: 125,500

I-95 (SR-9) NB

Good

Over: Mc Nab Rd.

1mi. So. of Atlantic Blvd, Broward, FL

Built 1976 Load: 32.7 t ADT: 125,500

I-75 (SR-93) SB

Good

Over: US-27 (SR-25)

ANDYTOWN I-75 AND US-27, Broward, FL

Built 1982 Load: 32.7 t ADT: 16,336

I-595 (SR-862) EB

Good

Over: SR-823 Flamingo Road

4 Mi. W of University Dr., Broward, FL

Built 1988 Load: 32.7 t ADT: 58,500

I-595 WB & Express

Good

Over: Hiatus Road

3 Mi W of University Dr, Broward, FL

Built 1988 Load: 32.7 t ADT: 58,500

SR91 NB TPK 57.75

Good

Over: SR 842 W BROWARD BLVD

1 MI S OF SUNRISE BLVD, Broward, FL

Built 1983 Load: 32.7 t ADT: 75,900

I-595WB/EXP LANES

Good

Over: Davie Road

0.7mi. W of Fla. Turnpike, Broward, FL

Built 1989 Load: 32.7 t ADT: 74,452

I-75 SB to EB I595

Good

Over: I-75 (SR-93)

I-595 & I-75 INTERCHANGE, Broward, FL

Built 1986 Load: 32.7 t ADT: 14,500

SR-84 EB

Good

Over: I-75 (SR-93)

I-595 & I-75 Interchange, Broward, FL

Built 1986 Load: 32.7 t ADT: 11,000

INDIAN TRACE(SW14)

Good

Over: I-75 (SR-93)

1 MI S OF I-75 & I-595, Broward, FL

Built 1986 Load: 32.7 t ADT: 10,900

I-595 (SR-862) WB

Good

Over: US-441 (SR-7)

US-441 & I-595 Interchg, Broward, FL

Built 1988 Load: 32.7 t ADT: 109,250

WB I-595 (SR-862)

Good

Over: SW26terr/New River/30AV

1mi W of I-95 (SR-9), Broward, FL

Built 1987 Load: 32.7 t ADT: 109,250

EB I-595 (SR-862)

Good

Over: SW26Terr New River 30Ave

1Mi W of I-95 (SR-9), Broward, FL

Built 1987 Load: 32.7 t ADT: 109,250

SR 91 TPK 53.95

Good

Over: SR 818 & New River Canal

1.7 miles South of I-595, Broward, FL

Built 1986 Load: 32.7 t ADT: 148,700

SR-93 (I-75) NB

Good

Over: DRAINAGE CANAL

7.9Mi East of CR-833, Broward, FL

Built 1988 Load: 32.7 t ADT: 16,336

WB Sunrise Blvd

Good

Over: Intracoastal Waterway

W of A1A & E of SR-5, Broward, FL

Built 1989 Load: 32.7 t ADT: 12,000

EB Sunrise Blvd

Good

Over: Intracoastal Waterway

W of A1A & E of SR-5, Broward, FL

Built 1987 Load: 32.7 t ADT: 12,000

WB SR-84

Good

Over: R/R & Ramp to I-595

SR-84 & I-95, Broward, FL

Built 1990 Load: 32.7 t ADT: 14,500

I-95 (SR-9)

Good

Over: SR-824 Pembroke Road

I-95 over Pembroke Road, Broward, FL

Built 1990 Load: 32.7 t ADT: 252,418

WB I-595 (SR 862)

Good

Over: I-95/RR/Anglers Ave.

I-595 (SR-862) OVER I-95, Broward, FL

Built 1989 Load: 32.7 t ADT: 36,000

EBI-595 to NBI-95

Good

Over: I-595 SW conn. NE conn.

I-595 & I-95 Interchange, Broward, FL

Built 1990 Load: 32.7 t ADT: 40,000

WB I-595 to SB I95

Good

Over: SR9 (I-95) & E-N Conn.

I-95 & I-595 Interchange, Broward, FL

Built 1990 Load: 32.7 t ADT: 11,000

Davie Blvd(SR-736)

Good

Over: I-95 I-595 Ramp RR 21 Av

SR-736 over I-95, Broward, FL

Built 1994 Load: 32.7 t ADT: 43,500

SR84 & FrontageRds

Good

Over: DRAINAGE CANAL

1 mi west of I-95 on SR84, Broward, FL

Built 1956 Load: 32.7 t ADT: 36,000

Andrews Ave.

Good

Over: DR MLK BLVD & SCL RR

0.4Mi N of Atlantic Blvd., Broward, FL

Built 2008 Load: 32.7 t ADT: 8,500

MILITARY TRAIL

Good

Over: HILLSBORO CANAL (G-08)

0.6MI N OF HILLSBORO BLVD, Broward, FL

Built 1992 Load: 32.7 t ADT: 20,000

SE 9TH STREET

Good

Over: TARPON RIVER

0.6MI E OF US-1, Broward, FL

Built 1970 Load: 32.7 t ADT: 1,440

Commodore Drive

Good

Over: North New River Canal

Inter. of SR-84 & Comm Dr, Broward, FL

Built 2008 Load: 32.7 t ADT: 1,440

SR-5 SB (870228)

Good

Over: MOWRY CANAL C-103

0.11M N OF SW 296 ST, Miami-Dade, FL

Built 1966 Load: 32.7 t ADT: 14,250

SR 112 WB

Good

Over: NW 17th Avenue

1.1 mile West of I 95, Miami-Dade, FL

Built 1960 Load: 32.7 t ADT: 46,250

Showing 6,551-6,600 of 13,036 bridges

Data sourced from the FHWA National Bridge Inventory (NBI), latest released cycle. See our methodology for details. Retrieved and formatted by PlainBridges.

Disclaimer: This information is provided for informational purposes only and does not constitute professional advice. Data is sourced from the FHWA National Bridge Inventory (NBI). Poor condition is an inspection-record category, not a closure or unsafe-to-cross designation. Consult the bridge owner for current status.

What to do with this

Use Florida's inventory picture to drill to a county or a specific span.

  • Browse counties in Florida and open the highest-Poor shares first. County list
  • See where this state sits among peers on Poor-condition share. State rankings
  • Compare this state with another jurisdiction on the same measures. State compare

NBI condition ratings are inventory snapshots, not live crossing-safety verdicts.

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Florida Good/Fair/Poor shares and county rollups on this page are computed from the same NBI extract as the national boards; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.